Learning outcome
1.
2.
3.
4.

To carry out a complete design of steel structure for an elevated water tank (CO3-PO6).
To solve a real engineering problem (CO3-PO6).
To demonstrate effective team role and responsibility in the task execution.
Be able to present the finding using appropriate method.

Scenario
You are a Consultant Engineer in Berjaya Jururunding Sdn. Bhd. and are given a task on structural steel design
project. The duty of your team is to provide a complete design of an elevated water tank for water supply to
four different residential areas. Figure 1 shows the plan view and Figures 2-3 show the side views of the
elevated water tank, respectively. The required length of the primary beams (B1 and B2), secondary beams (B2)
and columns (C1 and C2) are as specified Figures 1-3 and Table 1. Also shown in the figures and Table 1 are the
height of the water tank (H) and spacing of the secondary beams (s). Calculations for loadings involved are
shown in the appendix. Prepare a comprehensive technical report that includes the selection of sizes, list of
material properties and design calculations for this project.

Objectives
This activity requires your team to analyse the forces acting on the steel structure, do complete analysis and
checking in order to propose the suitable sizes for primary and secondary steel beams and column members,
and also the beam-column connection design according to EC3.

Assessment
Assessment is based on a report writing and oral presentation of the findings. The report must be hand-written
on design sheet as given in i-learn. Oral presentation (with slides) must be given in short video. Arrangement of
report writing and oral presentation must be in sequence according to the design steps and calculations. Both
report (hard copy) and video (soft copy) must be submitted by 25th September 2016.
*Note: Number of group members 5/6 students

JUN OCT 2016

ECS338

B2
x

y
B1

Figure 1: Plan view of the elevated water tank

JUN OCT 2016

ECS338

Water tank

C2

C1

B2
Figure 2: Side view x-x of the elevated water tank

JUN OCT 2016

ECS338

Water tank

C2

C1

B1
Figure 3: Side view y-y of the elevated water tank

JUN OCT 2016

ECS338

Table 1 Dimension details


Group
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P

B1 (m)
3.0
3.0
3.0
3.5
3.5
3.5
4.0
4.0
4.0
4.5
4.5
4.5
5.0
5.0
5.0
5.5

B2 (m)
2.0
2.5
3.0
2.0
2.5
3.0
2.0
2.5
3.0
2.0
2.5
3.0
2.0
2.5
3.0
2.0

C1 (m)
5.5
5.0
6.5
6.0
7.0
6.0
6.5
5.0
6.0
7.0
5.5
7.0
6.5
5.0
5.0
6.5

C2 (m)
6.0
6.5
7.0
7.0
5.5
6.5
5.5
6.0
6.0
5.0
5.5
7.0
6.5
5.5
5.0
6.0

H (m)
5.0
4.0
3.0
4.0
3.0
2.0
4.0
3.0
2.0
3.5
2.5
2.0
3.5
2.5
2.0
3.5

s (mm)
600
600
600
700
700
700
800
800
800
900
900
900
1000
1000
1000
1100

Appendix
Density of water = 1000 kg/m3
=


( /)

= 7 /2 ( /)
Notes: 1. Loadings on primary and secondary beams B2 are from permanent and variable actions.
2. Loadings on primary beams B1 are from secondary beams B2 only.
3. Use steel grade of S275 or S355 only in the design calculations.
4. All assumptions for design calculations must be stated in the report and on calculation sheets.

JUN OCT 2016

ECS338

STRUCTURAL CONCRETE AND STEEL DESIGN (ECS338)


Name

Matric Number

1.
2.
3.
4.
5.
6.
Item

Marks

Introduction
List of material properties
Schematic diagram of single bay frame with dimensions
Beam design
Column design
Beam-column connection design
Conclusion
References
Overall team work
Video
TOTAL (CO3-PO6)

Lecturer

: Mdm. Nor Mayuze Binti Mohamad

Group

: J4EC1105R1/ J4EC1105R2/ J4EC1105R3 /J4EC1105R4

/5
/5
/5
/10
/10
/10
/5
/5
/15
/30
/100

JUN OCT 2016

ECS338

Rubrics (Presentation)
Assessment on CDIO skill: Communication (video)
Presenter
Team
Course and Code
Evaluator(s)
Date

:
:
: Structural Concrete and Steel Design (ECS338)
: Mdm. Nor Mayuze Binti Mohamad
:
Poor
(1)

Fair
(2)

Good
(3)

PRESENTATION QUALITY
Main objective of presentation is clearly stated
Presenter uses voice effectively (volume, clarity, inflection)
Quality of the video (brightness, angle etc.)
Transition to the next presenter or next content is smooth and
effective
TECHNICAL CONTENT
Technical content is accurate and significant
Technical content shows sufficient development
Main points are emphasized and the findings are clear
Ideas are supported with sufficient details and clear
drawings
Graphics and demonstrations are effectively designed and
used
Questions are answered accurately and concisely
/ 40 30 =

TOTAL

Rating
Poor
Fair
Good
Excellent

Mark
1
2
3
4
7

Excellent
(4)

JUN OCT 2016

ECS338

Rubrics (Final report)


Assessment on CDIO skill: Teamwork
Poor
(1.5), *(2.5), **(3.5)
Project overview is
not stated in the
report.

Fair
(2.5), *(5.0), **(7.5)
Project overview is
not complete.

Good
(3.5), *(7.5), **(11)
Project overview is
limited. Assumption
is clearly stated for
each design.

List of material
properties

Not stated in report.

Not complete.

Schematic
diagram of single
bay frame with
dimensions

Not stated in report.

Schematic diagram
without dimensions
and unit.

Full list without


reference or
catalogue.
Schematic diagram
with dimensions
and unit.

*Beam design

Wrong concept of
design.

*Column design

Wrong concept of
design.

*Beam-column
connection
design

Wrong concept of
design.

Conclusion

Not written in
report/wrong
conclusion.

Able to performed
the design but with
miscalculation and
> 2 missing steps.
Able to performed
the design but with
miscalculation and
> 2 missing steps.
Able to performed
the design but with
miscalculation and
> 2 missing steps.
Conclude in general
statement.

Able to performed
the design but with
miscalculation and
< 2 missing steps.
Able to performed
the design but with
miscalculation and
< 2 missing steps.
Able to performed
the design but with
miscalculation and
< 2 missing steps.
Conclude with
significant findings.

References

No references.

**Overall team
work

Missing two tasks


either in video or
report.

3 relevant
references.
Missing one task
either in video or
report.

5 relevant
references.
Report not in order
or not in format.

Introduction

Excellent
(5), *(10), **(15)
Project overview is
stated in clear
picture. Assumption
is clearly stated for
each design.
Full list with
reference or
catalogue.
Schematic diagram
with dimensions
and unit plus the
member sizes.
Types of support
and detailing are
clearly stated in the
diagram.
Able to performed
the design without
miscalculation and
missing step.
Able to performed
the design without
miscalculation and
missing step.
Able to performed
the design without
miscalculation and
missing step.
Conclude and
summarize the
findings according
to the objectives.
More than 5
relevant references.
Excellent
compilation of
report and video.

JUN OCT 2016

ECS338

GROUP LIST
J4EC1105R1
GROUP

NAME
NUR AMDIYANA AMIRAH BINTI AHMAD.
NORLIZA BINTI ROSLI
NUR SHUHADA BINTI HARIS
NAJIHAH BINTI SUKRI
IZZAH MARDHIAH BINTI MD ARIS
NUR ASHIKIN BT CHE LAH
MUHAMMAD SHAFIQ BIN OMAR
SULAIMATHUL SAADIAH BINTI SAAD
LUTFIAH HANUM BINTI LUT
NUR SHUHADA BT NOR SHAHRUDIN
MUHAMMAD IZZ FARHAN BIN MUHAMMAD
NUR HUSNA BINTI MUHAMAD
NUR SYAHIRA BT MOHD RUSMI
NURUL HAZLINDA BINTI RAMLI
ZARITH ASHRAF BIN MUHAMAD TARMIZI
MUHAMAD NOR ASYRAF BIN KAMARUDDIN

MATRIC NO.
2013108415
2013240582
2013671908
2013252714
2013802372
2013757033
2013596551
2013306485
2013358037
2013961319
2013695072
2013986445
2013590919
2013996097
2013163639
2013476172

NAME
AHMAD SOFIAN BIN AHMAD SHAHIME
MUHAMMAD SYAZWAN OBAIDAH BIN MD
MUHAMMAD NAZMIL BIN NAZMAN
MUHAMMAD 'ARIFF RIZAL
MUHAMMAD FIKRI BIN ZAINI
MOHAMAD SHAPIED BIN MIHARUDDIN
MOHAMAD HAZEEM BIN AZMI
MOHAMAD DANIAL BIN KHALID
MUHAMMAD ASYRAF BIN LOKMAN
NUR FAIQ BIN SAFIAN
UNGKU MUHAMMAD AIMAN BIN UNGKU
MOHD ZAIM ASYRAAF BIN MAT PUA'AT
MUHAMMAD IMRAN HISHAM BIN RUSLAN
MOHD AFIF AIMAN BIN JAMIL
NURUL FATIHAH BINTI JUHARI
QHATTRUN NADAA BINTI KHALIR

MATRIC NO.
2013325255
2013357129
2013777131
2013575265
2013312515
2013755911
2013101973
2013517277
2013120797
2013129221
2013170339
2013535945
2013769469
2013816336
2013338991
2013374065

J4EC1105R2
GROUP

JUN OCT 2016

ECS338

J4EC1105R3 AND R4
GROUP

NAME
MUHAMMAD AMIRUL HAIRIE BIN AZMI
MUHAMMAD FAIZ BIN ABDUL FATAH
MOHAMAD AIMAN HARIZ BIN MOHAMAD
MUHAMAD ZULHILMI BIN CHE HARIS
MOHAMAD ASYRAF BIN SALHADI
MUHAMMAD AMIRULL ASYRAF BIN ANUAR
NIK AMZAR BIN MOHAMAD ASRI
MOHAMAD AMIROL AIZAT BIN RASHID
FAIZUL AKMAL BIN AZNAM
MOHAMAD AZRIN BIN ASMI
MUHAMMAD FAREEZ BIN ZULKIFLI
MUHAMMAD ADLI BIN MOHD HAIROLLAH
FARID 'IZZAT BIN ISHAK
MUHAMMAD ADIB BIN MOHD KHALID
SHAMIR FARHAN BIN LAILISAN
MOHAMAD ALIF AMINUDDIN BIN LANI
MUHAMMAD TAUFIQ BIN MOHD TAHIR
MUHAMMAD FITRI BIN MOHD TUKIRAN
IRFAN BIN AZMI
MUHAMMAD FARRIS BIN SHAHARUDIN
KAMAL ABDUL AZIZ BIN KAMAL ARIFFIN
IKMAL FAIZ BIN NOZRIMI @ ROSTAM
MUHAMMAD ATIF BIN LOKMAN
MUHAMMAD RAFIUDDIN BIN MD YUSOFF

10

MATRIC NO.
2013820382
2013811222
2013237414
2013834078
2013873322
2013805038
2013632612
2013505613
2013973009
2013587269
2013238272
2013420242
2013463532
2013276586
2013278532
2013216306
2013489662
2013812172
2013274468
2013818142
2013101429
2013841204
2013215078
2013832064

You might also like