Professional Documents
Culture Documents
Tender Document
for
CONSTRUCTION OF 132/33 KV GIS SUBSTATION AT DINHATA,
DISTRICT COOCHBEHAR
(Packge-38)
NIT No. CE(P)/WBSETCL/Sub-stn Pkg38/15-16/44
DT 02.03.16
Section VIIB
Annexure
These documents are meant for the exclusive purpose of bidding against this NIT and shall not be
transferred, reproduced or otherwise used for purposes other than that for which they are
specifically issued.
1. Contract Agreement
2a. 'Letter of Award of Contract' for Supply of Equipment/ Materials
2b. 'Letter of Award of Contract' for Installation of Equipment/ Materials (Excluding Civil Works)
2c. 'Letter of Award of Contract' for Installation of Equipment/ Materials Civil Erection Works
3. Bank Guarantee for Contract Performance
4. Bank Guarantee for Advance Payment
5. Application for Payments
6. Completion Certificate
7. Taking-Over Certificate
8. Trust Receipt for Equipment /Materials received
9a. Indemnity bond to be executed by the contractor for the equipment handed over by the
Purchaser for performance of its contract (Entire Equipment Consignment in one lot)
9b. Indemnity bond to be executed by the contractor for the equipment handed over in
instalments by the Purchaser for performance of its contract
10. Authorization letter
11. Validity Extension of Bank Guarantee
12. No-Claim Certificate
1. Contract Agreement
To be executed on non-judicial stamp paper of appropriate value
Capitalized words and phrases used herein shall have the same meanings as
are ascribed to them in the General Conditions of Contract.
Article2. Contract Price and Terms of Payment
2.1. Contract Price (Refer GCC 11)
The Purchaser hereby agrees to pay to the Contractor the Contract Price in
consideration of the performance by the Contractor of its obligations
hereunder. The Contract Price shall be [amount of Indian Rupees in
words], ..[amount in figures], or such other sums as may
be determined in accordance with the terms and conditions of the Contract.
2.2. Terms of Payment (Refer GCC 12)
The terms and procedures of payment according to which the Purchaser will
reimburse the Contractor are given in Appendix 1 (Terms and Procedures of
Payment) hereto.
Article3. Effective Date for determining Time for Completion
3.1. Effective Date (Refer GCC 1)
The Time of Completion of the Works shall be determined from the date of
Letter of Award provided all of the following conditions have been fulfilled
within a period of two (2) months from the date of said Letter of Award
a. This Contract Agreement has been duly executed for and on behalf of the
Purchaser and the Contractor;
b. The Contractor has submitted to the Purchaser the performance security, and
the advance payment guarantee;
c. The Purchaser has paid the Contractor the initial advance payment.
Each party shall use its best efforts to fulfill the above conditions for which it
is responsible as soon as practicable
3.2. If the conditions listed under 3.1 are not fulfilled within two (2) months from
the date of Letter of Award because of reasons attributable to the Purchaser,
the Contract would become effective only from the date of fulfilment of all the
above mentioned conditions and, the parties shall discuss and agree on an
equitable adjustment to the Contract Price and the Time for Completion and/or
other relevant conditions of the Contract.
3.3. However, if any of the conditions listed under 3.1 above are not fulfilled
within two (2) months from the date of Letter of Award because of the reasons
attributable to the Contractor, the Contract will become effective from the date
of Letter of Award. In this case, contract Price and/or time of completion shall
not be adjusted.
3.4. It is expressly understood and agreed by and between the Contractor and the
Purchaser that the Purchaser is entering into this Agreement solely on its own
behalf and not on behalf of any other person or entity. In particular it is
expressly understood and agreed that the Government is not a party to this
IN WITNESS WHEREOF the Purchaser and the Contractor have caused this Agreement to
be duly executed by their duly authorized representatives the day and year first above written.
Signed by for and on behalf of the Purchaser
[Signature]
[Title]
In the presence of
(Signature, Name and Title)
Signed by for and on behalf of the Contractor
[Signature]
[Title]
In the presence of
(Signature, Name and Title)
Appendices:
1. Terms and Procedures of Payment.
2. Price Variation.
3. Insurance Requirements.
4. Time Schedule.
5. Scope of Works by the Purchaser.
Appendix 1
1
Appendix 1
2
5. Payment by Measurement
For any part of the Works which is to be paid, according to quantity supplied or work
done, the quantity/ measurement shall be stated and the payment will be made as per
the Payment Schedule.
6. Application for Final Certificate of Payment
The Contractor shall make application to the Purchaser for the Final Certificate of
Payment within thirty (30) days after issue of Taking-Over Certificate by the
Purchaser for entire Works within the scope of Contract.
The application for the Final Certificate of Payment shall be accompanied by a final
account prepared by the Contractor & reconciled with the Purchaser. The final
account shall give full details of the value of all Equipment/ Materials supplied and
work done under the Contract together with:
a. such additions to or deductions from the Contract price as have been agreed,
and
b. all claims for additional payment to which the Contractor is entitled as per
variation orders
7. Issue of Final Certificate of Payment
The Purchaser shall issue to the Contractor, the Final Certificate of Payment after
receiving an application.
If the Contractor has not applied for Final Certificate of Payment within the time
specified, the Purchaser shall request the Contractor to do so within a further period of
thirty (30) days. If the Contractor fails to make such an application, the Purchaser
shall issue the Final Certificate of Payment for such amount as he deems correct.
8. Final Certificate of Payment Conclusive
A Final Certificate of Payment shall be conclusive evidence of the value of the
Works, that the Works are in accordance with the Contract and that the Contractor has
performed all his obligations under the Contract except the obligations arising during
the Defects Liability Period.
Payment of the amount certified in the Final Certificate of Payment shall be
conclusive evidence that the Purchaser has performed all his obligations under the
Contract.
9. Mode of Payment
All payments due under this Contract shall be made direct to the Contractor and the
currency shall be Indian Rupee. All payments shall be made in accordance with the
relevant instructions issued and permitted by WBSETCL.
No payment made by the Purchaser herein shall be deemed to constitute acceptance
by the Purchaser of the Works or any part(s) thereof.
Appendix 1
3
TERMS OF PAYMENT
1.
1.1.
Ten percent (10%) of the total ex-works price component as initial advance payment
to be paid with in thirty (30) days from the submission of bill for initial advance by
the Contractor subject to fulfilment of following :
1.2.
a.
b.
c.
d.
e.
f.
The advance payment shall be adjusted on pro-rata basis at the time of making
sixty percent (60%) payment as per clause 1.2 below. The advance payment
shall be kept outside the purview of Price Variation clause.
Sixty percent (60%) of the total ex-works price of the equipment/ material shall be
paid on receipt of material/ equipment along with 3 copies of bills and other relevant
documents as detailed below in good order and condition at its storage at respective
site store and/ or specified store duly certified by the Controlling officer for payment.
Appendix 1
4
a.
b.
c.
d.
e.
f.
In case of items where price are quoted on Lots/ L.S. basis payment will be made as
per agreed billing schedule finalised with the successful Bidder. The breakup of this
Lot price should be in conformity with volume of work/ supply involved.
One hundred percent (100%) of charges associated with the taxes and duties of the
supply of Equipment/ Materials, as admissible, will be released along with the sixty
percent (60%) payment as detailed in 1.2 above.
1.3.
Further ten percent (10%) of the total ex-works price of the equipment shall be paid
after completion of erection.
1.4.
Further ten percent (10%) of the total ex-works price of the equipment shall be paid
on successful Completion of Works of this Contract and Certification by the
Purchasers Representative except as per the relevant provisions under Clause GCC
28.
1.5.
Price variation claim along with all required supporting documents will have to be
submitted by the bidder separately (in Triplicate) for necessary scrutiny by the Project
Manager of the Works and onward transmission to the Paying Authority along with
necessary certificate. Price variation claim shall be paid as per admissible formula in
Appendix 2 to the Contract Agreement for the total bills submitted during one year
from the date of first submission of bill as per Clause 1.2 of Appendix 1 to the
Contract Agreement, as applicable. Thereafter, price variation can be claimed at the
end of each financial year, as applicable.
1.6.
The balance ten percent (10%) of the total ex-works price of the equipment and
balance price variation claim, if any, as per formula as admissible, shall be paid after
issue of Taking Over Certificate as per GCC.29.
1.7.
Appendix 1
5
2.
3.
3.1.
4.
4.1.
Five percent (5%) of the total installation services component of the Contract Price
will be paid to the Contractor as interest free advance payment on:
a.
b.
c.
d.
e.
The advance Bank Guarantee shall be adjusted on half- yearly basis for the amount of
advance adjusted against the erection bills submitted for the completed erection. The
Bank Guarantee shall be returned to the Contractor after full adjustment of advance
Appendix 1
6
against completed erection and upon request by the Contractor. The Bank Guarantee
will, however, be required to be revalidated from time to time to keep it valid till the
full adjustment of the advance or till the date of completion of Works, whichever is
earlier.
4.2.
Eighty five percent (85%) of the erection Contract Price will be paid upon successful
completion of respective items as per BOQ.
One hundred percent (100%) of charges associated with the taxes and duties of the
installation services of Equipment/ Materials as admissible will be released along with
the eighty-five percent (85%) payment as detailed in 4.2 above.
4.3.
Balance Ten percent (10%) of the erection contract price will be paid after successful
testing and commissioning of the installation and issue of Taking over Certificate as
per provisions under GCC29.
4.4.
The Payment Certificate will be issued on the basis of quantum of work completed.
Another certificate certifying the successful completion of quality check points
involved in erection to be issued by Controlling Officer will be enclosed along with
Payment Certificate for getting these payments.
4.5.
5.
5.1.
Appendix 2
1
PRICE VARIATION
[These formulae may be inserted, as applicable, for all three Contracts]
A. For fabricated and galvanized steel structure excluding nuts & bolts
The price quoted is based on the cost of raw materials/components and labour cost as on
date of quotation and the same shall be deemed to be related to the prices of raw materials
and all India average consumer price index number for industrial workers as specified in
the price variation clause given below. In case of any variation in these prices and index
numbers, the price payable shall be subject to adjustment up or down in accordance with
the applicable formula as under:
a. Fabricated & galvanized steel structures using both heavy and lighter angles
P=
Po
SBLR
SBIR
Zn
W
(11 + 32
+ 25
+ 09
+ 23 )
100
SBLR0
SBIR0
Zno
Wo
P=
Po
SBLR
Zn
W
+ 09
+ 23 )
(11 + 57
100
SBLR0
Zno
Wo
P=
Po
SBIR
Zn
W
+ 09
+ 23 )
(11 + 57
SBIR0
Zno
Wo
100
Wherein
P
Appendix 2
2
on the 1st. working day of the month, three months prior to the due
date of submission of price bid
The above prices and indices are as published by IEEMA prevailing as on 1st working
day of the month, one month prior to the due date of submission of price bid.
SBLR = Price of Steel Bloom-Retail (refer notes).This price is as applicable
on the first working day of the month, two months prior to the date
of delivery.
SBIR = Price of Steel Billets-Retail (refer notes).This price is as applicable
on the first working day of the month, two months prior to the date
of delivery.
Zn
= Price of electrolytic high grade zinc (refer notes).This price is as
applicable on the 1st working day of the month, two months prior to
the date of delivery.
W
= All India average consumer price index number for industrial
workers, as published by the Labour Bureau, Ministry of Labour,
Govt. of India (Base 2001 = 100) (refer notes). This index number is
as applicable on the 1st. working day of the month, four months prior
to the date of delivery.
The date of delivery is the date on which the lots of material / parts of fabricated
and galvanized steel structures are notified as being ready for inspection/despatch. In
the absence of such notification the date of manufacturers despatch note is to be
considered as the date of delivery or the contracted delivery date (including any
agreed extension thereto), whichever is earlier.
Notes:
i. All prices of raw materials are exclusive of modvatable excise/CV duty amount
and exclusive of any other central, state or local taxes, octroi etc.
ii. All prices are as on 1st working day of the month.
iii. The details of prices are as under :
The price of Steel Bloom-Retail (in Rs./MT) is the average retail price of
Blooms of size 150 mm x 150 mm of all cities in Rs/MT as published by Joint
Plant Committee(JPC), Kolkata. All heavy angles of size above 110 mm x 110
mm are deemed to be related to this price.
The price of Steel Billet-retail (in Rs./MT) is the average retail price of Billets of
size 100 mm of all cities in Rs/MT as published by Joint Plant Committee (JPC),
Kolkata. All lighter angles of size 110 mm x 110 mm and below are deemed to
be related to this price.
The price of electrolytic high grade zinc (in Rs./MT) is ex-works price as quoted
by the primary producer .
Cost weightage of re-rolling/conversion charges is included in Labour cost
weightage(W)
Appendix 2
3
iv. The prices for phase plate, number plate, danger plate, earthing set and
climbing device are to be quoted Firm.
anti-
B. For Conductors
The formula for calculating the price adjustment of the ex-works price component of
conductor will be as follows
A
B
L
C1 = C0 * 0.15 + 0.65 * 1 + 0.15 * 1 + 0.05 * 1 C0
A0
B0
L0
C1
Appendix 2
4
price variation clause given below. In case of any variation in these prices and index
numbers, the price payable shall be subject to adjustment, up or down in accordance with
the following formula.
P=
Po
C
ES
IS
IM
TB
W
+ 27
+9
+5
+ 11
+ 12 )
(13 + 23
Co
ES o
IS o
IM o
TBo
Wo
100
Wherein
P
Po
Co
ES
IS
Appendix 2
5
week ending 1st Saturday of the month three (3) months prior to the
date of delivery.
IM
= Price of Insulating Materials (refer notes). This price is as applicable
on the 1st working day of the month, one (1) month prior to the date
of delivery.
TB
= Price of Transformer Oil Base Stock (refer notes). This price is as
applicable on the 1st working day of the month, two (2) months prior
to the date of delivery
W
= All India average consumer price index number for industrial
workers, as published by the Labour Bureau, Ministry of Labour,
Govt. of India (Base 1982=100). This index number is as applicable
on the 1st working day of the month, three months prior to the date of
delivery
The date of delivery is the date on which the transformer is notified as being ready for
inspection/ despatch (in the absence of such notification, the date of manufacturer's
despatch note is to be considered as the date of delivery) or the contracted delivery
date (including any agreed extension thereto), whichever is earlier.
Notes:
i. All prices of raw materials are exclusive of modvatable excise/CV duty amount
and
of any other Central, State or local taxes, octroi etc. Transformers
manufacturers import major raw materials like Copper, CRGO Steel Sheets,
TOBS and Insulating press boards etc. The landed cost of these imported raw
materials includes applicable custom duty but exclusive of modvatable CVD.
ii. All prices are as on first working day of the month.
iii. The details of prices are as under :
The LME price of Copper Wire Bars (in Rs./MT) is the LME average settlement
price of Copper Wire Bars for one (1) month prior to the month of the circular
converted into Indian Rupees with applicable exchange rates prevailing as on 1st
working day of the subsequent month. This price is the landed cost, inclusive of
applicable customs duty only but exclusive of countervailing duty.
The price of CRGO Electrical Steel Sheets (in Rs/MT) suitable for Transformers
of ratings up to 10 MVA or voltage up to 33 KV is the average C&F price in US
$ per MT converted into Indian Rupees with applicable exchange rate prevailing
as on 1st working day of the month, as quoted by primary producers This price is
the landed cost, inclusive of applicable customs duty only but exclusive of
countervailing duty.
The wholesale price index number for Iron & Steel is as published by the Office
of Economic Advisor, Ministry of Industry, Govt. of India, New Delhi with base
1993-94=100. This wholesale price index number is being published weekly on
provisional basis. However, the same gets finalized after eight (8) weeks and is
normally available after two (2) months. Therefore, we are considering in our
calculations this final index for the 1st Saturday of the months two (2) months
Appendix 2
6
prior to the date of which the prices of other raw materials such as AI, IM are
published for the corresponding month.
The price of Insulating materials (in Rs./Kg) of pre-compressed pressboards of
size 10 mm thick, 3200 mm x 4100 mm is the average C&F price in free
currency per MT converted into Indian Rupees with applicable exchange rates
prevailing as on 1st working day of the month as quoted by primary suppliers
This price is the landed cost, inclusive of applicable customs duty only but
exclusive of countervailing duty.
The price of TOBS is C&F price (in Rs./K.Ltr) for N-60 grade Oil as published
in ICIS-LOR bulletin for the 1st week of the previous month. This price is
normally published in US$ per US Gallon, which is converted in Rs./K.Ltr with
applicable exchange rate prevailing on 1st working day of the subsequent month.
This price is the landed cost, inclusive of applicable customs duty only but
exclusive
of
countervailing
duty.
Appendix 3
1
Insurance
Installation
risk
2.
Third
Party
liability
Automobile
liability
Workmens
Compensation
Purchasers
liability
Group personal
insurance,
for
Contractors &
Sub-contractors
employees
3.
4.
5.
6.
Notes:
1. The Purchaser shall be named as co-insured under all insurance policies taken out by
the Contractor pursuant to GCC 37.1 except for Third Party Liability, Workman's
Compensation and Purchaser's Liability Insurances and the Contractor's SubContractors shall be named as co-insured under all insurances policies taken out by
Appendix 3
2
the Contractor pursuant to GCC 37.1, except for the Cargo insurance during transport,
Workman's Compensation and Purchasers Liability Insurances. All insurers rights of
subrogation against such co-insureds for losses or claims arising out of the
performance of the Contract shall be waived under such policies.
2. Notwithstanding the insurance requirements mentioned above, it would be the
Contractor's responsibility to take adequate insurance cover as may be pertinent to
protect his interest and interest of the Purchaser. If at any point of time during
execution of the Contract, the insurance policies are found to be inadequate, the
Contractor shall take fresh insurance policies meeting aforesaid requirements. The
Purchaser reserves the right to make suitable recovery from the Contractor, if any.
APPENDIX-4
1
TIME SCHEDULE
It is clearly understood and agreed that time is the essence of this Contract and shall be
strictly adhered to by the Contractor. The program of supplying, erecting, testing,
commissioning, completion of Works and site delivery of spares identifying the key phases in
various areas of work like design, procurement, manufacture, field activities including civil
construction works shall be as per master network enclosed as Attachment-I to this Appendix
4 (The master network submitted by the Bidder and as mutually discussed and agreed before
Letter of Award shall be enclosed as Attachment-I to this Appendix 4 of Contract
Agreement). As per this master network, the key milestones for completion of Works are as
under:
S.No Area/ Description of Milestone
1.
2.
3.
4.
1.
2.
3.
4.
5.
1.
2.
3.
1.
2.
A. Engineering
Basic Engineering
Detailed Engineering
D.
The master network and the key milestone dates will be discussed and agreed before the
execution of Letter of Award. Engineering Drawing and Data Submission Schedule shall also
be discussed and finalised before the issue of Letter of Award
After the Letter of Award, the Contractor shall plan the sequence of work of manufacture and
erection to meet the above stated dates of completion of Works and shall ensure all work,
manufacture, shop testing, inspection and shipment of the equipment in accordance with the
required construction/erection sequence.
Within thirty (30) days of the Letter of Award, the Contractor shall submit to the Purchaser
for his review and approval two (2) copies (one reproducible and one print) of detailed PERT
Network schedules with master network activities further exploded based on the Master
APPENDIX-4
2
Network mutually agreed by the Purchaser and Contractor, showing the logic and duration of
the activities covered in the Contracts in the following areas:
Engineering, procurement, manufacturing and supply, detailed engineering, procurement
(including bought out items), manufacturing, despatch, shipment, receipt at site and activities
related to civil works, erection, commissioning and Completion of Works.
Detailed Manufacturing Programme:
Detailed Manufacturing PERT Network for all the manufacturing activities at Contractor's /
sub-Contractor's works shall also be furnished within sixty (60) days of Letter of Award. The
manufacturing network shall be supported by detailed procurement programme for critical
bought out items/ raw materials.
Attachment -1 to Appendix 4
1
MASTER NETWORK
The Master Network as per Appendix 4 to be enclosed here
APPENDIX-5
1
APPENDIX-5
2
4. Personnel
For the purpose of commissioning and Guarantee tests to be performed by the
Contractor, the Purchaser, as a part of his input, will provide operating personnel
for operation of the equipment. During such operation, the Purchaser's operating
personnel shall be under the direct supervision of the Contractor/s/Manufacturer's
representative, who in any case shall be responsible for safety and satisfactory
performance of the activity/equipments. However, the operating personnel of the
Purchaser shall be required to do only those duties which are normally assigned to
such operational staff. All other required labour shall be arranged by the
Contractor.
Attn: Mr ..
Sub: Letter of Award of Contract for Supply of................................... (Package Name)
................................................ as per Bid Document No..................................
Dear Sir,
1.
.......................(List out all the Sections of the Bidding Documents along with
Tender Drawings etc. as issued to the bidder)..........
ii.
We confirm having accepted your proposal submitted vide letter no. ........................
dated .......................................... and its modification vide letter no................................
dated (Delete if not applicable) read in conjunction with all the specifications, terms &
conditions of the Bidding Documents, Your subsequent letters (Use if relevant) and
agreed Minutes of Meeting referred to in para 1.0 above and award on you the Contract
for
the
scope
of
work
covering
.............................................................................................................................................
........................................................................................(Indicate Scope of Work)
.............................................................................................................................................
.................of..................................................................... (Name of Package)
..................................... for (Name of project) ......................................... as per
Specification No. :............................................. (hereinafter referred to as the 'First
Contract').
3.
We have also notified you vide our Letter of Award No. ........................................
dated............... for award of 'Second Contract' on you for the work of .........................
(Indicate brief scope of work of the Second Contract) .............................for
............................(Name of Package) ..................as per Bid
Document
No.................................................. (hereinafter referred to as the 'Second Contract). You
shall also be fully responsible for the works to be executed under the 'Second Contract'
and it is expressly understood and agreed by you that any breach under the 'Second
Contract' shall automatically be deemed as a breach of this 'First Contract' and viceversa and any such breach or occurrence or default giving us a right to terminate the
'Second Contract' and/or recover damages there under, shall give us an absolute right to
terminate this Contract and/or recover damages under this 'First Contract' as well and
vice-versa. However, such breach or default or occurrence in the 'Second Contract' shall
not automatically relieve you of any of your responsibility/obligations under this 'First
Contract'. It is also expressly understood and agreed by you that the
equipment/materials to be supplied by you under this 'First Contract' when installed and
commissioned under the 'Second Contract' shall give satisfactory performance in
accordance with the provisions of the Contract.
4.
The total Contract Price for the entire scope of work under the Contract shall be
.............(Specify the amount in INR)................ as per the following break up
i. Ex- works price for Main Equipment
.......................................................
ii. Transportation including Insurance charges
.......................................................
iii. Taxes (e.g. Sales tax, Excise duty, etc.)
.......................................................
TOTAL (i + ii + iii)
.......................................................
Particulars
Completion time
(months)
The time and date of completion is the essence of this contract. You are required to
organize your resources and perform your work
6.
You shall prepare and finalise the Contract Documents for signing of the formal
Contract Agreement and shall enter into the Contract Agreement with us, as per the
proforma enclosed with the Bidding Documents, on non-judicial stamp paper of
appropriate value within......... (Specify)......... days from the date of this Letter of
Award.
7.
This Letter of Award is being issued to you in original. We request you to return its
photocopy duly signed and stamped on each page including all the enclosed
Appendices, by the authorised signatory of your company as a proof of your
acknowledgement and confirmation.
Please take the necessary action to commence the work and confirm action.
Yours faithfully,
for and on behalf of
........... (Name of the Purchaser)..................
(Authorised Signatory)
Encl:As above
Attn: Mr ..
Sub: Letter of Award of Contract for Inland Transportation, Installation, Testing,
Commissioning and conducting Guarantee tests of................................... (Package Name)
................................................ as per Bid Document No..................................
Dear Sir,
1.
.......................(List out all the Sections of the Bidding Documents along with
Tender Drawings etc. as issued to the bidder)..........
ii.
We confirm having accepted your proposal submitted vide letter no. ........................
dated .......................................... and its modification vide letter no................................
dated (Delete if not applicable) read in conjunction with all the specifications, terms &
conditions of the Bidding Documents, Your subsequent letters (Use if relevant) and
agreed Minutes of Meeting referred to in para 1.0 above and award on you the Contract
for the work of ............................(Indicate brief Scope of Work)......................................
of......................................... (Name of Package) .....................................for (Name of
project)......................................... as per Specification No. :.............................................
(hereinafter referred to as the 'Second Contract').
3.
We have also notified you vide our Letter of Award No. ........................................
dated............... for award of 'First Contract' on you for the work of .........................
(Indicate brief scope of work of the First Contract) .............................for
............................(Name of Package) ..................as per Bid
Document
No.................................................. (hereinafter referred to as the 'First Contract). You
shall also be fully responsible for the works to be executed under the 'First Contract' and
it is expressly understood and agreed by you that any breach under the 'First Contract'
shall automatically be deemed as a breach of this 'Second Contract' and vice-versa and
any such breach or occurrence or default giving us a right to terminate the 'First
The total Contract Price for the entire scope of electrical erection work under the
Contract shall be .............(Specify the amount in INR)................ as per the following
break up
i. Erection charges inclusive of unloading &
insurance, testing & commissioning and taxes .......................................................
(if any)
TOTAL
.......................................................
The time and date of completion is the essence of this contract. You are required to
organize your resources and perform your work
6.
You shall prepare and finalise the Contract Documents for signing of the formal
Contract Agreement and shall enter into the Contract Agreement with us, as per the
proforma enclosed with the Bidding Documents, on non-judicial stamp paper of
appropriate value within......... (Specify)......... days from the date of this Letter of
Award.
7.
This Letter of Award is being issued to you in original. We request you to return its
photocopy duly signed and stamped on each page including all the enclosed
Appendices, by the authorised signatory of your company as a proof of your
acknowledgement and confirmation.
Please take the necessary action to commence the work and confirm action.
Yours faithfully,
for and on behalf of
........... (Name of the Purchaser)..................
(Authorised Signatory)
Encl: As above.
Dear Sirs,
In consideration of West Bengal State Electricity Transmission Company Limited
(hereinafter referred to as WBSETCL which expression shall unless repugnant to the
context or meaning thereof include its successors, administrators and assigns) having
awarded
to
M/s with
its Registered/Head
Office at
(hereinafter referred to as the 'Contractor' which expression shall
unless repugnant to the context or meaning thereof, include its successors,
administrators, executors and assigns), a Contract by issue of Letter of Award
No.. dated .. valued at . for .. (Scope of
Contract) and the Contractor having agreed to provide a Contract Performance Guarantee for
the faithful performance of the entire Contract equivalent to ten percent (10%) of the said
value of the Contract to the Purchaser.
We .. (Name and Address) having its Head Office at
.. hereinafter referred to as the Bank which expression shall, unless
repugnant to the context or meaning thereof include its successors, administrators, executors
and assigns), do hereby guarantee and undertake to pay WBSETCL, on demand any and all
monies payable by the Contractor to the extent of .. as aforesaid at any time
upto .@...............(day/month/year) without any demur, reservation, contest recourse
or protest and or without any reference to the Contractor. Any such demand made by
WBSETCL on the Bank shall be conclusive and binding notwithstanding any difference
between WBSETCL and the Contractor or any dispute pending before any Court, Tribunal
or any other Authority. The Bank undertakes not to revoke this guarantee during its
currency without previous consent of WBSETCL and further agrees that the guarantee herein
contained shall continue to be enforceable till ninety (90) days after the validity of this
guarantee.
WBSETCL shall have the fullest liberty without affecting in any way the liability of the Bank
under this guarantee from time to time to extend the time for performance of the Contract by
the Contractor. WBSETCL, shall have the fullest liberty, without affecting this guarantee to
postpone from time to time the exercise of any powers vested in them or of any right
which they might have against the Contractor and to exercise the same at any time and any
manner, and either to enforce or to forbear to enforce any covenants, contained or
implied in the Contract between WBSETCL and the Contractor or any other course of
remedy or security available to WBSETCL. The Bank shall not be released of its obligations
under these presents by any exercise by WBSETCL of its liberty with reference to the matters
aforesaid or any of them or by reason or any other acts of omission or commission on the part
of WBSETCL or any other indulgence shown by WBSETCL or by any other matter or
thing whatsoever which under the law would but for this provisions have the effect of
relieving the Bank.
The Bank also agrees that WBSETCL at its option shall be entitled to enforce this
guarantee against the Bank as a Principal debtor, in the first instance without proceeding
against the Contractor and notwithstanding any security or other guarantee that
WBSETCL may have in relation to the contractor's liabilities.
Notwithstanding anything contained herein above our liability under this guarantee is
restricted to and shall remain in force up to and including
and shall be extended from time to time for such period, as may be desired by M/s
.on whose behalf this guarantee has been given.
All rights of WBSETCL under this guarantee shall be forfeited and the Bank shall be relieved
and discharged from all liabilities there under unless a demand or claim is lodged by
WBSETCL under this guarantee against the Bank within ninety (90) days from the above
mentioned date or from the extended date.
Dated this day of .20 at .
Witness:
(Signature)
(Signature)
(Name)
(Name)
(Official Address)
(Official Address)
Authorized vide
Power of Attorney No:.
Date.
Note:
1.
2.
(@)This date will be ninety (90) days after the end of Defect Liability Period
as specified in the Contract.
(#) Complete mailing address of the Head Office of the Bank to be given
The Stamp Paper of appropriate value shall be purchased in the name of
guarantee issuing Bank or the party on whose behalf the Bank Guarantee is
being issued. The Bank Guarantee (BG) shall be issued on a stamp paper of
value as applicable in the state of India from where BG has been issued or the
state of India from where the BG shall be operated, whichever is higher
Dear Sirs,
In consideration of the West Bengal State Electricity Transmission Company Limited
(hereinafter referred to as WBSETCL) which expression shall unless repugnant to the
context or meaning thereof include its successors, administrators, executors and assigns
having awarded to M/s............................ with its registered/Head
Office
at
................................ (here-in-after referred to as the Contractor) which expression shall
unless repugnant to the context or meaning thereof, include its
successors,
administrators, executors and assigns, a contract by issue of WBSETCL's Letter of Award
No. . dated . and the same having been unequivocally accepted by
the Contractor resulting in a 'Contract', dated valued at .for
. (hereinafter called the Contract ) and the WBSETCL having agreed to
make advance payment to the Contractor for performance of the above Contract
amounting to Rs .. (in words and figures) as an advance against Bank
Guarantee to be furnished by the Contractor.
We, .[Insert name and address of the bank issuing Branch] .. having
its Head Office at .. (hereinafter referred to as the 'Bank' which
expression shall, unless repugnant to the context of meaning thereof, include its successors,
administrators, executors and assigns) do hereby guarantee and undertake to pay WBSETCL
immediately on demand any or all monies payable by the Contractor to the extent of Rs
.at any time up to .@.. without any demur, reservation, contest,
recourse or protest and/or without any reference to the Contractor. Any such demand
made by WBSETCL on the Bank shall be conclusive and binding not withstanding any
difference between WBSETCL and the Contractor or any dispute pending before any
Court, Tribunal, Arbitrator or any other Authority. We agree that the Guarantee herein
contained shall be irrevocable and shall continue to be enforceable till thirty (30) days after
expiry of its validity.
WBSETCL shall have the fullest liberty without affecting in any way the liability of the
Bank under this guarantee from time to time to vary the advance or to extend the time
for performance of the Contract by the Contractor. The WBSETCL shall have the fullest
liberty, without affecting this guarantee to postpone from time to time the exercise of any
powers vested in them or of any right which they might have against the Contractor and
to exercise the same at any time in any manner and either to enforce or to forbear to
enforce any covenants contained or implied in the Contract between the WBSETCL and the
Contractor or any other course or remedy or security available to WBSETCL. The Bank
shall not be released of its obligations under these presents by any exercise by
WBSETCL of its liberty with reference to the matters aforesaid or any of them or by reason
of any other act or forbearance or other acts of omission or commission on the part of the
Purchaser or any other indulgence shown by the Purchaser or by any other matter or thing
whatsoever which under law would, but for this provision, have the effect of relieving the
Bank.
The Bank also agrees that WBSETCL at its option shall be entitled to enforce this
Guarantee against the Bank as a principal debtor, in the first instance without proceeding
against the Contractor and notwithstanding any security or other guarantee that WBSETCL
may have in relation to the Contractor liabilities.
Notwithstanding anything contained hereinabove our liability under this guarantee is
limited to Rs and it shall remain in force up to and including
and shall be extended from time to time for such period as may be desired by M/s
on whose behalf this guarantee has been given.
All rights of the WBSETCL under this guarantee shall be forfeited and the Bank shall be
relieved and discharged from all liabilities there under unless a demand or claim is lodged by
WBSETCL under this guarantee against the Bank within thirty (30) days from the above
mentioned date or from the extended date.
Dated this day of .20 at .
Witness:
(Signature)
(Signature)
(Name)
(Name)
(Official Address)
(Official Address)
Attorney as per
Power of Attorney No: .
Date.
Note:
1.
2.
(@)This date will be ninety (90) days beyond the date of scheduled issuance of
Taking-Over Certificate with a claim period of thirty (30) days.
The bank guarantee should be on Non-Judicial stamp paper of appropriate
value as per stamp act prevailing in the state where the Bank Guarantee is
submitted or is to be acted upon or the rate prevailing in the State where the
Bank Guarantee is executed, whichever is higher
Site
Lot No
Date
Name of Contractor
Contract No.
Contract Value
Application
Serial Number
Name
of
Package
the
To
.. *
Dear Sir,
1. Pursuant to the above referred contract dated .. the undersigned hereby submit
claim for payment of the sum of .. (Specify amount for which claim is made)
2. The above amount is on account of : (Check whichever is applicable)
Advance payment (Schedule**)
Interim payment as advance (Schedule**)
Progressive payment against receipt of equipment at site (Schedule**)
Progressive payment against erection (Schedule**)
Transportation
Insurance
Price adjustment
Extra work not specified in contract
(Ref. Contract change order No..)
Others (specify)
Final payment (Schedule**)
as detailed in the attached Schedule(s) which form an integral part of this application
payment schedule
4. This application consist of this page, a summary of claim statement (**) and the
following signed schedules:
1)
2)
3)
The following documents are also enclosed:
1)
2)
3)
Application for payment will be made to "Project Manager" designated for this purpose at
the time of Award of Contract.
** Proforma for the summary of claim will be finalized during the finalization of the
Contract Agreement.
6. Completion Certificate
(On the letter head of the Purchaser as per provisions of GCC 28)
Date:
Contract No.:
[Name of Contract]
To: [Name and address of Contractor]
Dear Sirs,
Pursuant to Clause GCC 28 of the General Conditions of the Contract entered into between
yourselves and the WBSETCL dated [date], relating to the [brief description of the Works],
we hereby notify you that the following part(s) of the Works was (were) complete on the date
specified below, and that, in accordance with the terms of the Contract, the Purchaser hereby
takes over the said part(s) of the Works, together with the responsibility for care and custody
and the risk of loss thereof on the date mentioned below.
1. Description of the Works or part thereof: [description]
Billing
Schedule
Sl. No.
Description
of item
Total
Quantity/Percentage (%)
Cumulative
Claimed in
Cumulative
achieved up
this bill
achieved up
to last bill
to date
However, you are required to complete the outstanding items listed in the enclosure hereto as
soon as practicable.
This letter does not relieve you of your obligation to complete the execution of the Works
including Guarantee Test(s) in accordance with the Contract nor of your obligations during
the Defects Liability Period.
Very truly yours,
Title
(Project Manager)
7. Taking-Over Certificate
(On the letter head of the Purchaser as per provisions of GCC 29)
Date:
Loan/Credit No:
Tender Notice No:
[Name of Contract]
Dear Sirs,
Pursuant to clause GCC 29 of the General Conditions of the Contract entered into between
yourselves and the Purchaser dated [date], relating to the [brief description of the Works], we
hereby notify you that the Functional Guarantees of the following part(s) of the Works were
satisfactorily attained on the date specified below.
1. Description of the Works: [description]
2. Date of Take-Over: [date]
This letter does not relieve you of your obligation to complete the execution of the Works in
accordance with the Contract nor of your obligations during the Defects Liability Period.
Title
(Project Manager)
For M/s...........................................................
(Contractor's Name)
Dated: ...........................
(AUTHORISED SIGNATORY)
3.
4.
5.
6.
risks whatsoever till the Equipments are duly used/erected in accordance with the
terms of the Contract and the Works duly erected and commissioned in accordance
with the terms of the Contract is taken over by WBSETCL. The Contractor
undertakes to keep WBSETCL harmless against any loss or damage that may be
caused to the Equipments.
The Contractor undertakes that the Equipments shall be used exclusively for the
performance/execution of the Contract strictly in accordance with its terms and
conditions and no part of the equipment shall be utilised for any other work of
purpose whatsoever. It is clearly understood by the Contractor that non-observance of
the obligations under this Indemnity Bond by the Contractor shall inter-alia constitute
a criminal breach of trust on the part of the Contractor for all intents and purpose
including legal/penal consequences.
That WBSETCL is and shall remain the exclusive owner of the Equipments free from
all encumbrances, charges or liens of any kind, whatsoever. The Equipments shall at
all times be open to inspection and checking by the Project Manager or other
employees/agents authorised by him in this regard. Further, WBSETCL shall always
be free at all times to take possession of the Equipments in whatever form the
Equipments may be, if in its opinion, the equipments are likely to be endangered,
misutilised or converted to uses other than those specified in the Contract, by any acts
of omission or commission on the part of the Contractor or any other person or on
account of any reason whatsoever and the Contractor binds himself and undertakes to
comply with the directions of demand of WBSETCL to return the Equipments
without any demur or reservation.
That this Indemnity Bond is irrevocable. If at any time any loss or damage occurs to
the Equipments or the same or any part thereof is misutilised in any manner
whatsoever, then the Contractor hereby agrees that the decision of the Project
Manager of WBSETCL as to assessment of loss or damage to the Equipment shall be
final and binding on the Contractor. The Contractor binds itself and undertakes to
replace the lost and/or damaged Equipments at its own cost and/or shall pay the
amount of loss to WBSETCL without any demur, reservation or protest. This is
without prejudice to any other right or remedy that may be available to WBSETCL
against the Contractor under the Contract and under this Indemnity Bond.
NOW THE CONDITION of this Bond is that if the Contractor shall duly and
punctually comply with the terms and conditions of this Bond to the satisfaction of
WBSETCL, THEN, the above Bond shall be void, but otherwise, it shall remain in
full force and virtue.
IN WITNESS WHEREOF, the Contractor has hereunto set its hand through its authorised
representative under the common seal of the Company, the day, month and year first above
mentioned.
Particulars of
Equipments
handed over
Quantity
Schedule
Particulars of Despatch title
Documents
RR/GR/ Bill Carrier
of lading No
& Date
Value of the
Equipments
Signature of
the Attorney
in token of
receipt
(Contractors Name)
1.
2.
3.
Signature..
Name.
Address.
1.
2.
3.
Signature..
Name.
Address.
Signature.
Name.
Designation of .
Authorized representative*
(Common Seal)
(In case of company)
*Indemnity Bond are to be executed by the authorised person and (i) in case of contracting
Company under common seal of the Company or (ii) having the Power of Attorney issued
under common seal of the company with authority to execute Indemnity Bond, (iii) In case of
(ii), the original Power of Attorney if it is specifically for this Contract or a photostat copy of
the Power of Attorney if it is General Power of Attorney and such documents should be
attached to Indemnity Bond.
2.
3.
4.
5.
6.
Contractor shall hold such Equipment etc. in trust as a "Trustee" for and on behalf of
WBSETCL.
That the Contractor is obliged and shall remain absolutely responsible for the safe
transit/protection and custody of the Equipment at WBSETCL Site against all risks
whatsoever till the Equipments are duly used/erected in accordance with the terms of
the Contract and the Works duly erected and commissioned in accordance with the
terms of the Contract is taken over by WBSETCL. The Contractor undertakes to keep
WBSETCL harmless against any loss or damage that may be caused to the
Equipments.
The Contractor undertakes that the Equipments shall be used exclusively for the
performance/execution of the Contract strictly in accordance with its terms and
conditions and no part of the equipment shall be utilised for any other work of
purpose whatsoever. It is clearly understood by the Contractor that non-observance of
the obligations under this Indemnity Bond by the Contractor shall inter-alia constitute
a criminal breach of trust on the part of the Contractor for all intents and purpose
including legal/penal consequences.
That WBSETCL is and shall remain the exclusive owner of the equipments free from
all encumbrances, charges or liens of any kind, whatsoever. The Equipments shall at
all times be open to inspection and checking by the Project Manager or other
employees/agents authorised by him in this regard. Further, WBSETCL shall always
be free at all times to take possession of the Equipments in whatever form the
Equipments may be, if in its opinion, the equipments are likely to be endangered,
misutilised or converted to uses other than those specified in the Contract, by any acts
of omission or commission on the part of the Contractor or any other person or on
account of any reason whatsoever and the Contractor binds himself and undertakes to
comply with the directions of demand of WBSETCL to return the Equipments
without any demur or reservation.
That this Indemnity Bond is irrevocable. If at any time any loss or damage occurs to
the Equipments or the same or any part thereof is misutilised in any manner
whatsoever, then the Contractor hereby agrees that the decision of the Project
Manager of WBSETCL as to assessment of loss or damage to the Equipment shall be
final and binding on the Contractor. The Contractor binds itself and undertakes to
replace the lost and/or damaged Equipments at its own cost and/or shall pay the
amount of loss to WBSETCL without any demur, reservation or protest. This is
without prejudice to any other right or remedy that may be available to WBSETCL
against the Contractor under the Contract and under this Indemnity Bond.
NOW THE CONDITION of this Bond is that if the Contractor shall duly and
punctually comply with the terms and conditions of this Bond to the satisfaction of
WBSETCL, THEN, the above Bond shall be void, but otherwise, it shall remain in
full force and virtue.
IN WITNESS WHEREOF, the Contractor has hereunto set its hand through its authorised
representative under the common seal of the Company, the day, month and year first above
mentioned.
Particulars of
Equipments
handed over
Quantity
Schedule No .1
Particulars of Despatch title
Documents
RR/GR/ Bill Carrier
of lading No
& Date
Value of the
Equipments
Signature of
the Attorney
in token of
receipt
(Contractors Name)
1.
2.
3.
Signature..
Name.
Address.
1.
2.
3.
Signature..
Name.
Address.
Signature.
Name.
Designation of .
Authorized representative*
(Common Seal)
(In case of company)
*Indemnity Bond are to be executed by the authorised person and (i) in case of contracting
Company under common seal of the Company or (ii) having the Power of Attorney issued
under common seal of the company with authority to execute Indemnity Bond, (iii) In case of
(ii), the original Power of Attorney if it is specifically for this Contract or a photostat copy of
the Power of Attorney if it is General Power of Attorney and such documents should be
attached to Indemnity Bond.
To,
M/s (Contractors Name)..
Ref: Contract No Dated
for .. awarded by WBSETCL
Dear Sirs,
Kindly refer to Contract No................. Dated ................ for............................. (Contract
Name).You are hereby authorised on behalf of WBSETCL having its registered office at
........................................................................................... to take physical delivery of
materials/equipments covered under despatch Document/ Consignment Note
no......................[mention LR/RR No]..............dated ................................... and as detailed in
the enclosed Schedule for the sole purpose of successful performance of the aforesaid
contract and for no other purposes, whatsoever.
S.No Contract
Name
LoA
No:/ Description
Spec
Contract
of Materials/ No.
Agreement No :
Equipment
Qty
Value Remarks
(Designation).
(Date).
(Signature)..
(Name & Designation)..
(Banks Seal)..
Authorised vide Power of Attorney No
..
* In case of Joint Ventures, name of all partners of the Joint Venture shall be mentioned.
Note: The extension of the Bank Guarantee should be forwarded to the Department/Project/
Corporate
Centre,
from
where
the
extension
has
been
sought.
Date..................................................
This is to certify that we have received all payments due to us in respect of the above referred
LoA/Contract and we have no claims whatsoever pending with WBSETCL for this Contract.
We further confirm that we shall have no claim against this Contract in future also.
Date :
(Signature)..........................................................
Place :
(Name)...................................................
(Designation).......................................................