Test l :Write true if the statement is correct and false if it is wrong. Write your answers ona piece
of paper.
_________1. The first step in laying footing form is to build the external portion.
_________2. Painting is the most popular of preserving and secutyfying the timber parts of any
concrete structure.
_________3. Forms are secured by means of braces and clamps.
_________4. Beam forms consist of one button and two side of forms.
_________5. CH.B stands for concrete hollow block.
_________6. CH.B is composed of cement and fine aggregates.
_________7. CH.B is commonly used for walls and partition.
_________8. The thickness of CH.B value from 100 m.m to 150 m.m and 200 mm.
_________9. Masonry surfaces preparation cleaning and washing.
_________10. CH.B is made up of cement and mortar.
Test ll.DIRECTION: From the four options under each item, choose one which will complete or
answer best each statement below. Write the letter of each correct answer on a separate paper.
1. The tool used for checking and obtaining horizontal surface is.
(a) Plum bob
(c) T-bevel
(b) island
(c) Portland
(d) possoland
(b) string
(d) tamper or
(d) spade
(b) plastering
(c) rendering
(d) scresding
9. These tools are use for applying, spreding, and shaping mortar or plaster.
(a) trowel
(b) spade
(c) float
(a) lacquering
(b) pointing
(c) plastering
(d) vanishing
(c) municipal
(d) license
(c) electrical
(b) description
(d) sectioning
14. This is a vertical pipe that conducts rain water from the gutter to the.
(a) downspout
(b) gutter
(c) facia
15. This the supporting portion of structure located below the floor construction or grade
including the footing.
(a) foundation
(b) footing
(c) flooring
(d) wall
16. This area largely deals with concrete works such as brick .
(a) laying
(b) plastering
(c) tiking
(b) ventilation
(b)drainage
(c) sewerage
(b) pointed
(b) complicated
(c) easy
(d) expensive
23. Set the guide string for the second caurse of C.H.B place at least.
(a) 12mm
(b) 14mm
(c) 16mm
Class AA_______
Class A
_______
Class B
_______
Class C
_______