CLIENT

: M/S. AE ARMA-ELEKTROPANC

PROJECT

: BLUE WATERS WHARF RETAIL (BW04)

BRAND

: REFLEX - GERMANY

SUB REF

: 6004-0100-AEA-2300-MT-0859 REV.00 DATED 19.07.2016

REPLY TO CONSULTANTS COMMENTS


Consultants Comments

Reply

1.

No objection for the proposed pressurization system strategy


and make (Reflex Variomat system) in principle subject to
Meraas acceptance since this is specified. Subject to
complying with the following comments:

Noted

2.

Contractor to confirm if any cost saving is applicable.

3.

Proposed material does not comply with project design


requirement and submittal procedures, however the
following comments are being provided for contractors basic
reference/ guidance and incorporation of the comments in
the next submission of material submittal.

Noted

4.

Compliance statement shall be provided with page numbers


of the product catalogue, test certificates etc. In front of each
compliance to the specification. In case of non-compliance
or deviation, provide page numbers of the justification details
in front of each.

Comply.

5.

Remarks

Not Applicable

Please refer to Annexure 1: Index 2


Compliance Statement.

Please refer to Annexure 1: Index 4


Provide the technical literature in original catalogue for
Comply
Manufacture Product Catalogue.
equipment and the chemicals, loose papers are not
P.O Box 14327, Dubai, United Arab Emirates. Tel.: +971-4-2722393, Fax: +971-4-2723224, E-mail: info@ambiotech.ae
1

accepted as instructed repeatedly.


6.

Closed system pressurization units shall be complete


package units containing expansion vessel(s), pumps, break
tank and all controls, interlocks and ancillary equipment
necessary to maintain the system operating conditions as
per the specification. Project specific system drawing shall
be submitted for approval along with detailed sequence of
operation.

Comply as Noted.

Break tank is not required in REFLEX Variomat


System. Duty + Standby centrifugal pumps are
included. All pumps, control panel, expansion
vessels, manifolds, valves and pipework as
factory assembled in Germany. Please refer to
Annexure 1: Index 4 Manufacture Product
Catalogue.
Please refer Annexure 1: Index 4(d) & Index
4(f) for specific system drawing and sequence
of operation.

7.

8.

The whole unit shall be factory wired and shall be controlled


via an integral control panel. Where required all ferrous
metal shall be factory primed and gloss painted on site to an
approved colour as per the specification.
Number of pressurization units and pressure vessels shall
be as per design. Any deviation proposed shall be justified
with proper supporting documents.

Comply as noted.

Comply as Noted.

The proposed unit is factory wired and


controlled via integral control panel. Please
refer to Annexure 1: Index 4 Manufacture
Product Catalogue.
The pressurization unit as designed as per the
calculated system volume and actual static
head.
Please refer to Annexure 1: Index 4(a)
System Volume Calculation (provided by AE
ARMA) & Index 4(b) Expansion Vessel
Sizing Calculation

9.

Attached the system volume calculation for the chilled water


system is not detailed, to be completed and shall be
provided with proper supporting documents.

Comply as noted.

Please refer to Annexure 1: Index 4(a)


System Volume Calculation (provided by AE
ARMA).

Comply as noted.

Static head considered as 3 bar as per project


requirement.

10.

Considered static head of 2 bars is not as per project


requirement, revise the selection accordingly.

11.

Detailed schematic shall be submitted clearly showing the


Comply.
Please refer to Annexure 1: Index 4(d)
P.O Box 14327, Dubai, United Arab Emirates. Tel.: +971-4-2722393, Fax: +971-4-2723224, E-mail: info@ambiotech.ae
2

12.

13.

peripherals, control equipments involved and power


requirements.

System Descriptions.

The integral break tank shall be manufactured from GRP


and be complete with a removable lid, ball valve inlet,
overflow connection with discharge pipe, drain cock and
outlet connection to the pump. The ball valve inlet shall
comply with Water Supply Regulations.

Break tank is not required in REFLEX Variomat


System. Duty + Standby centrifugal pumps are
included. All pumps, control panel, manifolds,
valves and pipework as factory assembled in
Germany. Please refer to Annexure 1: Index 4
Manufacture Product Catalogue.

Automatic changeover of the pumps shall be provided on


pump failure. The changeover shall be remotely indicated.
Provision shall be incorporated for periodic variation of the
duty pump. Each pump shall be fitted with an hours run
counter. The over frequent starting of the duty pump shall be
indicated.

Comply as Noted

Comply

The changeover shall be remotely


indicated. Automatic change over, and failure
message for defect pump will be indicated the
pump. Run hours will be displayed and can
read on the control unit display
Please refer to Annexure 1: Index 2
Compliance Statement

14.

Comply with complete item 2.4M of specification section


232113.

Comply

15.

Contractor to confirm the system can be integrated with


BMS. Shall be strictly as per project specification.

Comply as noted
RS-485 interface and Modbus connections are
available.

16.

Justify the non- compliance to specification section 232113


item 2.4.0

Comply

Please refer to Annexure 1: Index 2


Compliance Statement

17.

Attach Third party test certificates for the proposed materials


as per the specification.

Comply

Please refer to Annexure 1: Index 5


Certificates

18.

Revise and resubmit for further review/comments/approval.

Comply