THE PROPORTIONAL FORMULA 1. The formula has been modified with the introduction of a foreign exchange component which is contrary to the provisions in the contract. 2. The index of the base month for supply and maintenance of plant EPo has been modified to 824.49 instead of 827.34. 3. The corrected values of IPCs of work done were not used in the determination of the price revision. THE MONO MATERIAL FORMULA 4. For the Mono material, the price of steel and bitumen at the tender stage Po used in the calculation was not correct. 5. For the Mono material, the price of cement used at the tender stage Po of 130,000, should have been 130.00 needs verification/confirmation. 6. For the Mono material, the Base month index for the material used in the calculation was not correct. 7. For the Mono material, the current month index for the material used in the calculation was not correct.
The Complete Guide to Alternative Home Building Materials & Methods: Including Sod, Compressed Earth, Plaster, Straw, Beer Cans, Bottles, Cordwood, and Many Other Low Cost Materials
The Complete HVAC BIBLE for Beginners: The Most Practical & Updated Guide to Heating, Ventilation, and Air Conditioning Systems | Installation, Troubleshooting and Repair | Residential & Commercial