Introduction
A welded construction applies, quality prescriptions concerning design production and use. Therefore
clients in Petro and chemical industry claims approved welding procedures. Welding requires skill.
Determining "how to weld" requires knowledge regarding the materials being welded and welding
process, among numerous other factors. Because of huge number of variables involved, the
knowledge of the welding engineer and the skill of the welder need to be validated by a series of tests.
This information is documented Section IX of the ASME Boiler and Pressure Vessel Code (BPVC), on:
1. Welding Procedure Specification (WPS)
2. Welding Procedure Qualification Record (WPQR)
3. Welding Performance Qualification (WPQ)
pdfcrowd.com
recommended format.
pdfcrowd.com
addition)
First car
powered by formic acid
LNG
Liquefied natural gas
CAESAR II
Pipe Stress Analysis
What is
Vacuum?
RUD
Hoist Ring
ExxonMobil to expand
Rotterdam hydrocracker
pdfcrowd.com
Trans-Alaska Pipeline
Prudhoe Bay to Valdez
Baku-Tbilisi-Ceyhan
Pipeline
pdfcrowd.com
World's Largest
Oil and Gas Companies
pdfcrowd.com