You are on page 1of 61

OFFSHORE

FUNCTIONAL
SPEC.No.
5086F

SPECIFICATIONFOR
Rev.No.
2

DESIGN

SECTION

ROTARYPUMP
Discipline
Mechanical

Page 1 of 12

FUNCTIONALSPECIFICATION
FOR
ROTARYPUMP

PREPARED/
REVIEWED
APPROVEDBY
TOTALNO.OF
DATE
REV.

REVISED

BY

PAGES

BY

KRT

SKG
JSS
12
16205
2

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004A
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 2 of 12

CONTENTS
INTRODUCTION
Scope/General
Contractor,sResponsibility
Provenequipment
CODESANDSTANDARDS
Codesandstandards
Projectspecifications
SCOPEOFSUPPLY
ENVIRONMENTALDESIGNCRITERIA
Climaticconditions
Areaclassification
DesignLife,AvailabilityandReliability
Utilitiesavailable
DESIGNREQUIREMENTS

General
BasicDesign
Safety
Process
Mechanical
Electrical
Instrumentation
InspectionTestingandCertification
SPAREPARTSANDTOOLS
Tools
Spareparts
CONTRACTDATA
PAINTINGANDPREPARATIONFORSHIPMENT
WARRANTY

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 3 of 12

INTRODUCTION

Scope/General
ThisSpecificationdefinestheminimumrequirementsforelectricmotordrivenRotaryPumps
(GearandScrew)tobeinstalledonOffshorePlatform.Thepumpscoveredunderthis
specificationmaybeusedasCrudeCondensateTransferPump,DieselTransferPump,LubeOil
Pump,SealOilPumporanyothersimilaruseinaccordancewithspecificrequirement.Additional
specificationsforallpumpsrequiredshallbedevelopedbyContractorforCompanysreviewas
partofDetailedEngg.Phase.
ContractorResponsibilities
TheContractorshallberesponsibleforthecompletedesign,manufacture,supply,inspection,
testing,preparationforshipmentforthePumpdrives,includingfullcompliancewithallapplicable
designcodesandstandards,includingthoselistedinSection2ofthisSpecification.
ProvenEquipment

Thesuppliershallhaveproducedtwo(2)pumpsetsofcomparabletype,ratinganddesignfromthe
proposedmanufacturingplant.Thesuppliershallprovideevidenceofsatisfactoryoperationofat
least8,000hrs.foronesuchunitwhenoperatinginsimilarserviceconditionsinoffshoreareas.
2

CODESANDSTANDARDS

Codes,StandardsandRegulations
Thepump(s)coveredbythisSpecificationshallbedesigned,manufacturedandtestedin
accordancewiththerequirementsofthisspecification,companyapproveddatasheetsandlatest
edition(ifnotmentioned)ofthefollowingcodesandstandards.
API676
:PositiveDisplacementPumpsRotary
NEC
:NationalElectricalCode

NEMA
:NationalElectricalManufacturersAssociation
IEC
:InternationalElectrotechnicalCommission

Format No

Ref. Proc. No
Issue No

Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 4 of 12

ReferenceSpecifications
Thepump(s)coveredbythisspecificationshallbedesigned,manufacturedandtestedin
accordancewiththerequirementsofthefollowingFunctionalSpecifications:
SPECNO
DESCRIPTION
MECHANICAL
5002
Specificationfornoiselimit
5004
Specificationforequipmentvibration

5100P
SpecificationforpackagedequipmentProcessplatform
ELECTRICAL
VOLII
ELECTRICALDESIGNCRITERIA
Sect2.3.5

FS4017
FunctionalspecificationforElectricalEquipmentofPackaged
Plant

FS4008
Functionalspecificationforelectricalmotors.
PIPING
VolIISect
Pipingdesigncriteria
3.3

2004A
FunctionalspecificationforPIPINGDESIGN
2004B
Functionalspecificationforpipingfabricationandinstallation
2006
FunctionalspecificationforInsulationofPIPINGAND
EQUIPMENTINSULATION

2009F
FunctionalspecificationforWELDINGANDNDT

1060
VendorDataRequirement
STRUCTURAL
2005
SPECIFICATIONFORPROTECTIVECOATING
INSTRUEMENTATION
VolII
BasicbidworkforInstrumentation
Sect2.3.6

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 5 of 12

SCOPEOFSUPPLY
Thevendorshallsupplyallnecessaryequipmentasdescribedhereinafterandtomakeacomplete
andoperableunit.Thisshallinclude,butnotlimitedtothefollowing:
Pumpcompletewithelectricmotor,couplingandguard
CommonBasePlate
Necessaryaccessorieslikesuctionstrainerwithdrainvalve,pressuresafetyvalve,drippanetc.
NecessaryElectricals,ControlsandInstrumentation(asapplicable)
Allnecessarysparepartsforstartup,commissioningandsixmonthsoperation
Twosetsofspecialtoolsrequiredformaintenanceofthepumpunit.
AlldocumentationasrequestedinthespecificationsanditsattachmentsandVendorData
RequirementgivenelsewhereintheBidPackage.

Inspectionandtestingascalledforinthisspecification.
Alltheabovecomponentsshallbefullyassembled,pipedwithinletandoutletpipingterminatedat
theskidedgewithappropriatelyratedflanges,wiretestedandpaintedformarineenvironment.
Thesuppliershallsupplytheequipmentspecifiedforthepackageandauxiliarysystemsandall
otherrequirementsinaccordancewiththisspecification.Anyequipmentthatisnecessarytomake
acomplete,operable,safeanddependablepackagebutnotspecificallyidentifiedhereinshallalso
beintheSuppliersscopeofsupply.
TheSuppliershallberesponsibleforthecompletedesign,engineering,coordination,testing,
deliveryandproperfunctioningoftheequipment,notwithstandinganyomissionsfromthis
specification.
BiddertofurnishcompletelyfilledindatasheetasperAPI676(LatestEdition)forCompanys
reviewandapproval.

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 6 of 12

ENVIRONMENTALDESIGNDATAANDUTILITIES

ClimaticConditions
TheclimaticandotherconditionsunderwhichtheequipmentwilloperateisdetailedinSection3.1
DesigncriteriaGeneral.
Theequipmentwillbeoperatedonanoffshoreplatform.
Areaclassification
ElectricalandinstrumentationequipmentshallbesuitablefortheapplicableHazardousArea
ClassificationaccordingtoElectricalDesignCriteriaenclosedinthebid.
TheContractorisresponsibleforensuringthatallequipmentandcomponentsprovidedaresuitable
fortheutilityandenvironmentalconditionsasspecifiedduringtheentiredesignlife.
DesignLife,AvailabilityandReliability

Equipmentshallbedesignedandconstructedforaminimumservicelifeequaltotheplatform
designlife,specifiedelsewhereinthebidandforaminimumuninterruptedperiodofoperationof
5years.
UtilitiesAvailable
ReferProcessDesignCriteria.
DESIGNREQUIREMENTS
Thesuppliersstandarddesignthatwillmeettheperformancerequirementsandthatiscapableof
operatinginthemarineenvironmentdocumentedinsection4foraperiodoflifeequaltothe
platformisrequired.Thesuppliershallidentifyanyaspectsofthestandardcomponentsof
packagesthatdontmeetthisspecificationandsubmitdescriptiontotheCompanythrough
PurchaserduringtenderingprocessforCompanysreviewandapproval.

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 7 of 12

UnlessotherwiseapprovedbyCompany,allpumpscoveredbythisspecificationshallcomplywith
therequirementofAPI676(latestedition):PositiveDisplacementPumpRotary.
General
UnitsusedonalldocumentationnameplatesanddrawingsshallbemetricSIunits,exceptfor
2

pressureunitsthatshallbekg/cm
BasicDesign
Pumps,driversandassociatedequipmentshallbedesignedtominimizethegenerationofnoisein
accordancewithONGCspecificationofNoiseandVibration.
Pumpshallbeselectedforthespecifiedcapacityatminimumspecifiedviscosityandthespecified
dischargepressure(max.differentialpressure)
NPSHrequiredvaluestatedbythevendorinhisproposalshallbeintermsofliquidcolumnofthe
operatingmedium.

Inletandoutletpurchasersinterfaceconnectionshallbeflangedandshallbesuitablefor
maximumallowableworkingpressure.
Therotorsshallbeinterchangeablebetweenidenticalpumps.
Completerotatingelementsshallbestaticallyanddynamicallybalancedatratedorhigherspeed
withbalancingcertificatefurnished.
Vendorshallsupplythecommonbaseplateoffabricatedsteel,drainrimtypesuitablefor
mountingthepumpdriverandauxiliaries.
ReliefvalveshallbeexternaltypewithM.O.Cequivalentorsuperiortothewettedpartsofpump
withbodyofASTMA216GrWCB(CS)andinternalsasSS316asaminimum.Theinletand
outletconnectionsshallbeflanged.

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 8 of 12

Safety
ItistheintentoftheCompanythatoperationalhazardsbereducedtoaminimum.Vendorshalluse
soundengineeringjudgmenttocompleteaninstallationthatwillperformtherequiredprocess
functionwithoutcompromisingthisaim.
AllelectricaldevicesshallmeettherequirementsfortheareaclassificationasperAPIRP500
and/orElectricalDesignCriteriainwhichtheyareinstalled.
Allcontrolsshalloperateinafailsafemode.
Allcouplings,gearsandexposedrotatingpartsshallbeprovidedwithadequateguardsonnon
sparkingtype.Drivebelts,ifusedshallbeantistatictype.
TherequirementsofNoiseLimitsandEquipmentVibrationsasdefinedinSpecNo.5002
EquipmentNoiseLimitsandSpecNo.5004EquipmentVibration.
Allemergencyshutdownsystemshallhavemanualoperatingmode.
Process

ReferProcessDesignCriteriagivenelsewhereintheBidPackage.
Mechanical:
Skid
Theskidshallbedesignedandbuilttoensurethatalltheequipmentalongwithaccessories,panel
andpipingaremountedsuitablyforconvenientoperation.
CouplingsandGuards
Couplingguardshallbenonsparkingandshallbeopenatthebottomtopermitmanualshaft
rotation.Theguardshallbesufficientlyrigidtowithstanddeflectionsasaresultofbodilycontact
ofnominally100kgs.

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 9 of 12

Electrical
ElectricalequipmentandmaterialsshallbeinaccordancewithFunctionalSpecificationsof
ElectricalEquipment(s).
Themotornameplateratingshallbeatleast110%ofthepumppowercorrespondingtorelief
valvesetpressureatmaximumspecifiedviscosity.
Instrumentation
Theselectionandinstallationofinstrumentationworksshallmeettheminimumrequirements
definedinReferenceFunctionalspecificationsandBasicbidworkofInstrumentationsection.
Thecontrols/indicationswhicharerequiredtobeconnectedtoCompanysRemoteControlRoom
shallbeterminatedinajunctionbox(withterminalstrip)locatedattheedgeoftheskid.
InspectionandTesting
Vendorshallcarryoutvarioustestsasperapplicablecodesandstandards.Testcertificatesshallbe

submittedforCompanysapproval.
Company/itsauthorizedrepresentativeorcertifyingagencyshallhaveaccesstoinspectthe
equipmentatanystageduringmanufacture.Duringinspection,materialcertificates,shoptestdata,
certificatesforboughtoutcomponentsandotherrelevantinformationshallbefurnishedsoasto
ascertainthatthespecificationandqualityarecompliedwith.
TestsspecifiedincodeandstandardsshallbeatCompanysoptioncarriedoutinpresenceof
Company/itsauthorizedrepresentativeorcertifyingagency.Vendorshallgiveminimum15days
priorintimationregardingtestingschedules.
PerformanceTestshallbeconductedtoobtaincompletedataincludingvibrationatratedspeed.
Whereviscosityofthetestingfluidisdifferentfrompumpingfluid,vendorshallsubmitviscosity
correlationcurvesandcalculationsforarrivingattheperformancecorrespondingtoratedviscosity.
Performancetestshallbecarriedoutfor4hours.

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 10 of 12

Afterperformancetest,dismantlinginspectionshallbecarriedoutforevaluationofrotor,bearings,
seals,clearancesandstatorinsert.
NPSHtestshallbecarriedoutwhenthedifferencebetweenNPSHAandNPSHRislessthan1m.

SPAREPARTSANDTOOLS

Spareparts
Vendorshallprovidesparepartsneededforstartupandcommissioningandsparesneededfor6
monthsnormaloperation.Inaddition,Vendorshallalsofurnishaseparateitemizedpricedlistof
recommendedsparesfortwo(2)yearsnormaloperationandmaintenance.Listsshallincludepart
number,partdescription,serialnumberandnormaldeliveryleadtime.TheSuppliershallensure
listedpartsareavailableforshipmentatthetimeofequipmentshipment.
AllsparepartsfurnishedbytheSuppliershallbewrappedandpackagedsothattheywillbe
preservedinoriginalasnewconditionundernormalconditionsofstorage.Sparepartsshallbe

properlytaggedandcodedsothatlateridentificationtointendedequipmentusedwillbe
facilitated.Theyshallbepackagedseparately,clearlymarkedasSparePartsandshippedatthe
sametimeastheequipment.Packagelistsshallbefurnishedsothatthepartscanbehandled
withoutuncratingifrequired.Startupsparesshallbepackedandidentifiedseparately.
Tools
Two(2)setsofanyspecialtoolsorfixturesthoserequiredforpacking,installationand
disassemblyshallbefurnishedbytheSupplier.Allsuchtoolsshallbepermanentlytaggedwith
informationpertainingtotheiruse.Anyspecialdrawingsorinstructionspertainingtouseofsuch
toolsshallbeincludedintheinstructionmanual.AlistshallbeestablishedbytheSupplierand
includedintheSupplierstender.

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 11 of 12

CONTRACTDATA
TheSuppliershallprovideallinformationasspecifiedintheVendorDataRequirement/relevant
clausesgivenelsewhereinbidpackage.Thisshallinclude,asaminimum,thefollowing:
Completeddatasheetsandcalculations
Completedlubeschedule
Torsionalvibrationandcriticalspeedscalculations.
Generalarrangementandcrosssectionaldrawingscompletewithpartlists,materialsand
equipmentdescriptions
Performancetestscurvesanddata
Materialsandthicknessofprincipalpartsnotcoveredbythedatasheet
Allrequiredmotorinformation

Itemizedweights,includingmaintenanceweights,pluswithdrawaldimensions
Proposedtestprocedureanderectiondetails
Customerconnectiondrawingscompletewithdetailednozzleschedule
Schematicandwiringdiagramsforelectricalcontrolandinstrumentation
Anchorboltsizesandlocations
ItemizedlistoftheSuppliersdeviationsformspecification
Listofrecommendedsparesforstartupandcommissioning
Listofspareforsixmonthsoperation
Listoftools
Operationandmaintenancemanualfortheequipment
PlannedMaintenanceSchedule
Alldrawings,calculationanddatasheetswillrequirereviewandapprovalbyPurchaserandwill
requiretheissueofasbuiltdocumentsbyContractor.
TheSuppliershallprovideacompletedocumentpackageforunitcomponentsandspecificfor
protectionoftheequipmentiftakenoutofserviceforfiniteperiods.
AlldrawingsshallhavethePurchaserequipmentnumberandpurchaseordernumber.

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003

FUNCTIONAL

SPEC.No.
5086F

OFFSHORE

SPECIFICATIONFOR

Rev.No.
2

DESIGN

SECTION

ROTARYPUMP

Discipline
Mechanical

No of Pages: 12 of 12

Paintingandpreparationforshipment

ProtectiveCoating
Allcarbonsteelsurfaces,fittings,supportsandstructuralsteelskidshallbecoatedinaccordance
withSpec.No.2005ProtectiveCoating.
PreparationforShipment
Afterfinaltestingandapproval,theassemblyshallbedrainedofwateranddried.
Allitemsshallbeproperlypackedandprotectedagainstdamageduringshipment.Eachcrate,bag
orpackageshallbeclearlyidentifiedwiththepurchaseordernumberandidentificationsymbol,
andshallbesecurelyfastenedtothepackage.
Exposedsurfacesshallbecoatedwithaneasilyremovablerustpreventative.
Allflangedopeningshallbeprotectedwithsteelplatecoversattachedbyproperboltingandsealed
withplasticcompound.

Allelectricalcontrolenclosuresshallbeproperlypluggedatentriesandloadedwithsilicagelbags
wherenecessary.
Thecontractorshallstateintheirproposaltheirrecommendationsforlongtermstorage(upto12
months)forbothindoorandoutdoorstorageinamarineenvironment.
Formoreinformationonpackaging,referSpecification5100attachedelsewhereinBidDocument.
Warranty
Vendorshallhavefinalandtotalresponsibilityforthedesignandmechanicalperformanceofall
equipmentsuppliedunderthisspecification.Vendorshallwarranttheequipmentfurnishedbyhim
andtheperformanceofthesaidequipmentinaccordancewithwarrantyrequirementsgiven
elsewhereinbidpackage

Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003