Professional Documents
Culture Documents
FUNCTIONAL
SPEC.No.
5086F
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
Page 1 of 12
FUNCTIONALSPECIFICATION
FOR
ROTARYPUMP
PREPARED/
REVIEWED
APPROVEDBY
TOTALNO.OF
DATE
REV.
REVISED
BY
PAGES
BY
KRT
SKG
JSS
12
16205
2
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004A
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 2 of 12
CONTENTS
INTRODUCTION
Scope/General
Contractor,sResponsibility
Provenequipment
CODESANDSTANDARDS
Codesandstandards
Projectspecifications
SCOPEOFSUPPLY
ENVIRONMENTALDESIGNCRITERIA
Climaticconditions
Areaclassification
DesignLife,AvailabilityandReliability
Utilitiesavailable
DESIGNREQUIREMENTS
General
BasicDesign
Safety
Process
Mechanical
Electrical
Instrumentation
InspectionTestingandCertification
SPAREPARTSANDTOOLS
Tools
Spareparts
CONTRACTDATA
PAINTINGANDPREPARATIONFORSHIPMENT
WARRANTY
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 3 of 12
INTRODUCTION
Scope/General
ThisSpecificationdefinestheminimumrequirementsforelectricmotordrivenRotaryPumps
(GearandScrew)tobeinstalledonOffshorePlatform.Thepumpscoveredunderthis
specificationmaybeusedasCrudeCondensateTransferPump,DieselTransferPump,LubeOil
Pump,SealOilPumporanyothersimilaruseinaccordancewithspecificrequirement.Additional
specificationsforallpumpsrequiredshallbedevelopedbyContractorforCompanysreviewas
partofDetailedEngg.Phase.
ContractorResponsibilities
TheContractorshallberesponsibleforthecompletedesign,manufacture,supply,inspection,
testing,preparationforshipmentforthePumpdrives,includingfullcompliancewithallapplicable
designcodesandstandards,includingthoselistedinSection2ofthisSpecification.
ProvenEquipment
Thesuppliershallhaveproducedtwo(2)pumpsetsofcomparabletype,ratinganddesignfromthe
proposedmanufacturingplant.Thesuppliershallprovideevidenceofsatisfactoryoperationofat
least8,000hrs.foronesuchunitwhenoperatinginsimilarserviceconditionsinoffshoreareas.
2
CODESANDSTANDARDS
Codes,StandardsandRegulations
Thepump(s)coveredbythisSpecificationshallbedesigned,manufacturedandtestedin
accordancewiththerequirementsofthisspecification,companyapproveddatasheetsandlatest
edition(ifnotmentioned)ofthefollowingcodesandstandards.
API676
:PositiveDisplacementPumpsRotary
NEC
:NationalElectricalCode
NEMA
:NationalElectricalManufacturersAssociation
IEC
:InternationalElectrotechnicalCommission
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 4 of 12
ReferenceSpecifications
Thepump(s)coveredbythisspecificationshallbedesigned,manufacturedandtestedin
accordancewiththerequirementsofthefollowingFunctionalSpecifications:
SPECNO
DESCRIPTION
MECHANICAL
5002
Specificationfornoiselimit
5004
Specificationforequipmentvibration
5100P
SpecificationforpackagedequipmentProcessplatform
ELECTRICAL
VOLII
ELECTRICALDESIGNCRITERIA
Sect2.3.5
FS4017
FunctionalspecificationforElectricalEquipmentofPackaged
Plant
FS4008
Functionalspecificationforelectricalmotors.
PIPING
VolIISect
Pipingdesigncriteria
3.3
2004A
FunctionalspecificationforPIPINGDESIGN
2004B
Functionalspecificationforpipingfabricationandinstallation
2006
FunctionalspecificationforInsulationofPIPINGAND
EQUIPMENTINSULATION
2009F
FunctionalspecificationforWELDINGANDNDT
1060
VendorDataRequirement
STRUCTURAL
2005
SPECIFICATIONFORPROTECTIVECOATING
INSTRUEMENTATION
VolII
BasicbidworkforInstrumentation
Sect2.3.6
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 5 of 12
SCOPEOFSUPPLY
Thevendorshallsupplyallnecessaryequipmentasdescribedhereinafterandtomakeacomplete
andoperableunit.Thisshallinclude,butnotlimitedtothefollowing:
Pumpcompletewithelectricmotor,couplingandguard
CommonBasePlate
Necessaryaccessorieslikesuctionstrainerwithdrainvalve,pressuresafetyvalve,drippanetc.
NecessaryElectricals,ControlsandInstrumentation(asapplicable)
Allnecessarysparepartsforstartup,commissioningandsixmonthsoperation
Twosetsofspecialtoolsrequiredformaintenanceofthepumpunit.
AlldocumentationasrequestedinthespecificationsanditsattachmentsandVendorData
RequirementgivenelsewhereintheBidPackage.
Inspectionandtestingascalledforinthisspecification.
Alltheabovecomponentsshallbefullyassembled,pipedwithinletandoutletpipingterminatedat
theskidedgewithappropriatelyratedflanges,wiretestedandpaintedformarineenvironment.
Thesuppliershallsupplytheequipmentspecifiedforthepackageandauxiliarysystemsandall
otherrequirementsinaccordancewiththisspecification.Anyequipmentthatisnecessarytomake
acomplete,operable,safeanddependablepackagebutnotspecificallyidentifiedhereinshallalso
beintheSuppliersscopeofsupply.
TheSuppliershallberesponsibleforthecompletedesign,engineering,coordination,testing,
deliveryandproperfunctioningoftheequipment,notwithstandinganyomissionsfromthis
specification.
BiddertofurnishcompletelyfilledindatasheetasperAPI676(LatestEdition)forCompanys
reviewandapproval.
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 6 of 12
ENVIRONMENTALDESIGNDATAANDUTILITIES
ClimaticConditions
TheclimaticandotherconditionsunderwhichtheequipmentwilloperateisdetailedinSection3.1
DesigncriteriaGeneral.
Theequipmentwillbeoperatedonanoffshoreplatform.
Areaclassification
ElectricalandinstrumentationequipmentshallbesuitablefortheapplicableHazardousArea
ClassificationaccordingtoElectricalDesignCriteriaenclosedinthebid.
TheContractorisresponsibleforensuringthatallequipmentandcomponentsprovidedaresuitable
fortheutilityandenvironmentalconditionsasspecifiedduringtheentiredesignlife.
DesignLife,AvailabilityandReliability
Equipmentshallbedesignedandconstructedforaminimumservicelifeequaltotheplatform
designlife,specifiedelsewhereinthebidandforaminimumuninterruptedperiodofoperationof
5years.
UtilitiesAvailable
ReferProcessDesignCriteria.
DESIGNREQUIREMENTS
Thesuppliersstandarddesignthatwillmeettheperformancerequirementsandthatiscapableof
operatinginthemarineenvironmentdocumentedinsection4foraperiodoflifeequaltothe
platformisrequired.Thesuppliershallidentifyanyaspectsofthestandardcomponentsof
packagesthatdontmeetthisspecificationandsubmitdescriptiontotheCompanythrough
PurchaserduringtenderingprocessforCompanysreviewandapproval.
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 7 of 12
UnlessotherwiseapprovedbyCompany,allpumpscoveredbythisspecificationshallcomplywith
therequirementofAPI676(latestedition):PositiveDisplacementPumpRotary.
General
UnitsusedonalldocumentationnameplatesanddrawingsshallbemetricSIunits,exceptfor
2
pressureunitsthatshallbekg/cm
BasicDesign
Pumps,driversandassociatedequipmentshallbedesignedtominimizethegenerationofnoisein
accordancewithONGCspecificationofNoiseandVibration.
Pumpshallbeselectedforthespecifiedcapacityatminimumspecifiedviscosityandthespecified
dischargepressure(max.differentialpressure)
NPSHrequiredvaluestatedbythevendorinhisproposalshallbeintermsofliquidcolumnofthe
operatingmedium.
Inletandoutletpurchasersinterfaceconnectionshallbeflangedandshallbesuitablefor
maximumallowableworkingpressure.
Therotorsshallbeinterchangeablebetweenidenticalpumps.
Completerotatingelementsshallbestaticallyanddynamicallybalancedatratedorhigherspeed
withbalancingcertificatefurnished.
Vendorshallsupplythecommonbaseplateoffabricatedsteel,drainrimtypesuitablefor
mountingthepumpdriverandauxiliaries.
ReliefvalveshallbeexternaltypewithM.O.Cequivalentorsuperiortothewettedpartsofpump
withbodyofASTMA216GrWCB(CS)andinternalsasSS316asaminimum.Theinletand
outletconnectionsshallbeflanged.
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 8 of 12
Safety
ItistheintentoftheCompanythatoperationalhazardsbereducedtoaminimum.Vendorshalluse
soundengineeringjudgmenttocompleteaninstallationthatwillperformtherequiredprocess
functionwithoutcompromisingthisaim.
AllelectricaldevicesshallmeettherequirementsfortheareaclassificationasperAPIRP500
and/orElectricalDesignCriteriainwhichtheyareinstalled.
Allcontrolsshalloperateinafailsafemode.
Allcouplings,gearsandexposedrotatingpartsshallbeprovidedwithadequateguardsonnon
sparkingtype.Drivebelts,ifusedshallbeantistatictype.
TherequirementsofNoiseLimitsandEquipmentVibrationsasdefinedinSpecNo.5002
EquipmentNoiseLimitsandSpecNo.5004EquipmentVibration.
Allemergencyshutdownsystemshallhavemanualoperatingmode.
Process
ReferProcessDesignCriteriagivenelsewhereintheBidPackage.
Mechanical:
Skid
Theskidshallbedesignedandbuilttoensurethatalltheequipmentalongwithaccessories,panel
andpipingaremountedsuitablyforconvenientoperation.
CouplingsandGuards
Couplingguardshallbenonsparkingandshallbeopenatthebottomtopermitmanualshaft
rotation.Theguardshallbesufficientlyrigidtowithstanddeflectionsasaresultofbodilycontact
ofnominally100kgs.
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 9 of 12
Electrical
ElectricalequipmentandmaterialsshallbeinaccordancewithFunctionalSpecificationsof
ElectricalEquipment(s).
Themotornameplateratingshallbeatleast110%ofthepumppowercorrespondingtorelief
valvesetpressureatmaximumspecifiedviscosity.
Instrumentation
Theselectionandinstallationofinstrumentationworksshallmeettheminimumrequirements
definedinReferenceFunctionalspecificationsandBasicbidworkofInstrumentationsection.
Thecontrols/indicationswhicharerequiredtobeconnectedtoCompanysRemoteControlRoom
shallbeterminatedinajunctionbox(withterminalstrip)locatedattheedgeoftheskid.
InspectionandTesting
Vendorshallcarryoutvarioustestsasperapplicablecodesandstandards.Testcertificatesshallbe
submittedforCompanysapproval.
Company/itsauthorizedrepresentativeorcertifyingagencyshallhaveaccesstoinspectthe
equipmentatanystageduringmanufacture.Duringinspection,materialcertificates,shoptestdata,
certificatesforboughtoutcomponentsandotherrelevantinformationshallbefurnishedsoasto
ascertainthatthespecificationandqualityarecompliedwith.
TestsspecifiedincodeandstandardsshallbeatCompanysoptioncarriedoutinpresenceof
Company/itsauthorizedrepresentativeorcertifyingagency.Vendorshallgiveminimum15days
priorintimationregardingtestingschedules.
PerformanceTestshallbeconductedtoobtaincompletedataincludingvibrationatratedspeed.
Whereviscosityofthetestingfluidisdifferentfrompumpingfluid,vendorshallsubmitviscosity
correlationcurvesandcalculationsforarrivingattheperformancecorrespondingtoratedviscosity.
Performancetestshallbecarriedoutfor4hours.
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 10 of 12
Afterperformancetest,dismantlinginspectionshallbecarriedoutforevaluationofrotor,bearings,
seals,clearancesandstatorinsert.
NPSHtestshallbecarriedoutwhenthedifferencebetweenNPSHAandNPSHRislessthan1m.
SPAREPARTSANDTOOLS
Spareparts
Vendorshallprovidesparepartsneededforstartupandcommissioningandsparesneededfor6
monthsnormaloperation.Inaddition,Vendorshallalsofurnishaseparateitemizedpricedlistof
recommendedsparesfortwo(2)yearsnormaloperationandmaintenance.Listsshallincludepart
number,partdescription,serialnumberandnormaldeliveryleadtime.TheSuppliershallensure
listedpartsareavailableforshipmentatthetimeofequipmentshipment.
AllsparepartsfurnishedbytheSuppliershallbewrappedandpackagedsothattheywillbe
preservedinoriginalasnewconditionundernormalconditionsofstorage.Sparepartsshallbe
properlytaggedandcodedsothatlateridentificationtointendedequipmentusedwillbe
facilitated.Theyshallbepackagedseparately,clearlymarkedasSparePartsandshippedatthe
sametimeastheequipment.Packagelistsshallbefurnishedsothatthepartscanbehandled
withoutuncratingifrequired.Startupsparesshallbepackedandidentifiedseparately.
Tools
Two(2)setsofanyspecialtoolsorfixturesthoserequiredforpacking,installationand
disassemblyshallbefurnishedbytheSupplier.Allsuchtoolsshallbepermanentlytaggedwith
informationpertainingtotheiruse.Anyspecialdrawingsorinstructionspertainingtouseofsuch
toolsshallbeincludedintheinstructionmanual.AlistshallbeestablishedbytheSupplierand
includedintheSupplierstender.
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 11 of 12
CONTRACTDATA
TheSuppliershallprovideallinformationasspecifiedintheVendorDataRequirement/relevant
clausesgivenelsewhereinbidpackage.Thisshallinclude,asaminimum,thefollowing:
Completeddatasheetsandcalculations
Completedlubeschedule
Torsionalvibrationandcriticalspeedscalculations.
Generalarrangementandcrosssectionaldrawingscompletewithpartlists,materialsand
equipmentdescriptions
Performancetestscurvesanddata
Materialsandthicknessofprincipalpartsnotcoveredbythedatasheet
Allrequiredmotorinformation
Itemizedweights,includingmaintenanceweights,pluswithdrawaldimensions
Proposedtestprocedureanderectiondetails
Customerconnectiondrawingscompletewithdetailednozzleschedule
Schematicandwiringdiagramsforelectricalcontrolandinstrumentation
Anchorboltsizesandlocations
ItemizedlistoftheSuppliersdeviationsformspecification
Listofrecommendedsparesforstartupandcommissioning
Listofspareforsixmonthsoperation
Listoftools
Operationandmaintenancemanualfortheequipment
PlannedMaintenanceSchedule
Alldrawings,calculationanddatasheetswillrequirereviewandapprovalbyPurchaserandwill
requiretheissueofasbuiltdocumentsbyContractor.
TheSuppliershallprovideacompletedocumentpackageforunitcomponentsandspecificfor
protectionoftheequipmentiftakenoutofserviceforfiniteperiods.
AlldrawingsshallhavethePurchaserequipmentnumberandpurchaseordernumber.
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003
FUNCTIONAL
SPEC.No.
5086F
OFFSHORE
SPECIFICATIONFOR
Rev.No.
2
DESIGN
SECTION
ROTARYPUMP
Discipline
Mechanical
No of Pages: 12 of 12
Paintingandpreparationforshipment
ProtectiveCoating
Allcarbonsteelsurfaces,fittings,supportsandstructuralsteelskidshallbecoatedinaccordance
withSpec.No.2005ProtectiveCoating.
PreparationforShipment
Afterfinaltestingandapproval,theassemblyshallbedrainedofwateranddried.
Allitemsshallbeproperlypackedandprotectedagainstdamageduringshipment.Eachcrate,bag
orpackageshallbeclearlyidentifiedwiththepurchaseordernumberandidentificationsymbol,
andshallbesecurelyfastenedtothepackage.
Exposedsurfacesshallbecoatedwithaneasilyremovablerustpreventative.
Allflangedopeningshallbeprotectedwithsteelplatecoversattachedbyproperboltingandsealed
withplasticcompound.
Allelectricalcontrolenclosuresshallbeproperlypluggedatentriesandloadedwithsilicagelbags
wherenecessary.
Thecontractorshallstateintheirproposaltheirrecommendationsforlongtermstorage(upto12
months)forbothindoorandoutdoorstorageinamarineenvironment.
Formoreinformationonpackaging,referSpecification5100attachedelsewhereinBidDocument.
Warranty
Vendorshallhavefinalandtotalresponsibilityforthedesignandmechanicalperformanceofall
equipmentsuppliedunderthisspecification.Vendorshallwarranttheequipmentfurnishedbyhim
andtheperformanceofthesaidequipmentinaccordancewithwarrantyrequirementsgiven
elsewhereinbidpackage
Format No
Ref. Proc. No
Issue No
Rev No
Rev. Date
ODS/SOF/004B
ODS/SOP/008 to 015
01
01
15/10/2003