Professional Documents
Culture Documents
Sr.
Criteria
Power System
A-1
A-1-1
A-1-2
A-1-3
A-1-4
A-1-5
A-1-6
A-1-9
A-1-10
A-2
A-2-1
A-2-2
A-2-3
A-2-4
A-2-5
A-2-6
A-2-7
A-2-8
A-2-9
A-3
A-3-1
A-3-2
A-3-3
A-3-4
A-3-5
A-3-6
A-3-7
A-4
A-4-1
A-4-2
A-4-3
A-5
A-5-1
A-5-2
A-5-3
A-5-4
A-5-5
A-5-6
A-5-7
A-6
A-6-1
A-6-2
A-6-3
A-6-4
Cooling System
B-1
B-1-1
B-1-2
B-1-3
B-1-4
B-1-5
B-1-6
B-1-7
B-1-8
B-1-9
B-1-10
B-3
B-3-1
B-3-2
B-3-3
A/C system
A/C's operation
Cleaning [ OD/ID units - IDU's filters - ODU's condenser ]
ODU's vibration level & power Socket covers existence
Drain pipes route condition
ODU's base fixation and earthing
ODU's Compressors / IDU's fan Freezing
Control panel operation & Remotes
A/C controller ( control panel ) wiring diagram
Automatic control switch (operation, timer operation & 6 hours adjustment for each A/C)
Refrigerant lines Status and Isolation
DC Ventilation System
DC Ventilation sys. Existence & operation
DC cables route , ducting & terminals
System Fans operation & Stainless guards Corrosion percentage
Heat Exchanger
BTS (IBBS) Cabinet Heat Exchanger's operation
Fan DC Power Cables arrangement & laying
BTS (IBBS) Cabinet Heat Exchanger Fans Cleaning
C-1
C-2
C-3
C-4
C-5
C-6
B-2
B-2-1
B-2-2
B-2-3
Transmission Equipments
D-1
D-2
D-3
D-4
D-5
D-6
D-7
D-8
MW dish >= 1.2M Struts, Antenna Bracket , Side Arm, wave guide fixation
RTN links protected by 2 PXC boards & powered by different C.Bs
All links Power Cables had terminals
IDU / IF Cable / ODU / PWR cables labels
IDUs / ODUs Fixation & earthing
each IDU has its' Own power source (TM C.B not shared by many links)
IF Connectors tightness & cables laying
link management & current Alarms
E-1
E-2
E-3
E-4
E-5
E-6
E-7
E-8
Civil
F-1
F-1-1
Shelter/OD Cabinets I-Beam Fixation, galvanization, grounding and its' anchor Bolts Status
F-1-2
F-1-3
F-1-4
F-1-5
F-1-6
F-3
F-3-1
F-3-2
F-3-3
F-3-4
F-3-5
Shelter Double Roof / OD Canopy Fixation and Sealing (Sika Flux) Status
Shelter / OD Cabinets Door hinge, Sealing, holder , earthing Status
Door Sensor operation
Roxtec fixation , earthing and sealing
Copper belt, buss bars inside Shelter & earthing continuity Status
All earthing plates are cleaning and coating with antistatic grease
RF/IF cables entrance isolation
A/Cs & power cable glands on the shelter body earthing, sealing status
General
Site lights inside/outside operation
Emergency light Status & Battery condition
Junk materials & unused Spare parts existence in the site area
Humidity & water sensors operation status
the temperature sensor of the A/C controller operation
1 (or) 2 step ladder for shelter galvanized and earthing
AC outlets operation and status
Site equipments, area cleaning
Fence
Site Fence (bricks / mesh wire) had crack or holes
Fence barbed wire system continuity status
Fence light/ halogen system operation
Fence gate painting & lock status
Fence gate connected to the main earth
G-1
G-2
G-3
G-4
G-5
G-6
G-7
G-8
F-1-7
F-1-8
F-1-9
F-2
F-2-1
F-2-2
F-2-3
F-2-4
F-2-5
F-2-6
F-2-7
F-2-8
Tower
H-1
H-1-1
H-1-2
H-1-3
H-1-4
H-1-5
H-1-6
H-1-7
H-1-8
H-1-9
H-1-10
H-2
H-2-1
H-2-2
H-2-3
H-2-4
H-2-5
H-2-6
H-2-7
H-2-8
H-2-9
all Anchor bolts fixation , tighten and coated by grease for tower / mast legs
all RDU wires tension & fixation
all earthing plates on the Tower are coating with antistatic grease
all cables are attached to the tower ( there is no fly cables )
Safety Wire fixation , galvanization & corrosion status
Tower platform existence and fixation
Tower painting (under check)
Tower members bolts fixation
Antennas Brackets fixation , galvanization and grounding
Palm Tree , Mono-pole
Palm step Bolts / (Palm - Mono pole) ladder condition [ missing-loose-rusty ]
Anchor Bolts for the base [ missing - loose - rusty ]
Safety Wire fixation , galvanization , tension & corrosion status
Feeders holder wires installation [ tension - corrosion ] status
Access door [ exist - locked ]
Water Drain pipe installation and route
Camouflage status [ Scratch / damage ]
Palm Tree leaves installation far from the MW Dish & Antennas
Antennas Jumpers & IF cable arrangement
Generator
I-1
I-2
I-3
I-4
I-5
I-6
I-7
I-8
I-9
I-10
I-11
I-12
I-13
I-14
I-15
I-16
I-17
I-18
I-19
I-20
I-21
score
Score %
NCR raised
124
80.00%
7
score
Score %
210
82.35%
NCR raised
11
score
Score %
NCR raised
334
81.46%
18
Scoring Description
sohag
5055
2/5/2014
Criteria
Severity
result
score
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Power System
generato
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Yes
Yes
Yes
5
5
5
Yes
No
Yes
No
0
5
1
Yes
Yes
No
5
5
1
No
Yes
No
Yes
Yes
No
Yes
1
5
1
N/A
5
N/A
5
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Yes
Yes
No
5
5
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Yes
No
Yes
Yes
Yes
No
Yes
Yes
5
N/A
5
5
5
N/A
5
5
Cooling System
A/C system
A/C's operation
Cleaning [ OD/ID units - IDU's filters - ODU's condenser ]
ODU's vibration level & power Socket covers existence
Drain pipes route condition
ODU's base fixation and earthing
ODU's Compressors / IDU's fan Freezing
Control panel operation & Remotes
A/C controller ( control panel ) wiring diagram
control switch (operation, timer operation & 6 hours adjustment for each A/C)
Refrigerant lines Status and Isolation
DC Ventilation System
DC Ventilation sys. Existence & operation
DC cables route , ducting & terminals
System Fans operation & Stainless guards Corrosion percentage
Heat Exchanger
BTS (IBBS) Cabinet Heat Exchanger's operation
Fan DC Power Cables arrangement & laying
BTS (IBBS) Cabinet Heat Exchanger Fans Cleaning
Transmission Equipments
dish >= 1.2M Struts, Antenna Bracket , Side Arm, wave guide fixation
RTN links protected by 2 PXC boards & powered by different C.Bs
All links Power Cables had terminals
IDU / IF Cable / ODU / PWR cables labels
IDUs / ODUs Fixation & earthing
ch IDU has its' Own power source (TM C.B not shared by many links)
IF Connectors tightness & cables laying
link management & current Alarms
5
5
5
5
5
N/A
1
3
Cabinets I-Beam Fixation, galvanization, grounding and its' anchor Bolts Status
Yes
lter Double Roof / OD Canopy Fixation and Sealing (Sika Flux) Status
Shelter / OD Cabinets Door hinge, Sealing, holder , earthing Status
Door Sensor operation
Roxtec fixation , earthing and sealing
Copper belt, buss bars inside Shelter & earthing continuity Status
All earthing plates are cleaning and coating with antistatic grease
RF/IF cables entrance isolation
Cs & power cable glands on the shelter body earthing, sealing status
General
Site lights inside/outside operation
Emergency light Status & Battery condition
Junk materials & unused Spare parts existence in the site area
Humidity & water sensors operation status
the temperature sensor of the A/C controller operation
1 (or) 2 step ladder for shelter galvanized and earthing
AC outlets operation and status
Site equipments, area cleaning
Fence
Site Fence (bricks / mesh wire) had crack or holes
Fence barbed wire system continuity status
Fence light/ halogen system operation
Fence gate painting & lock status
Fence gate connected to the main earth
Yes
Yes
Yes
Yes
N/A
No
Yes
No
5
5
5
5
N/A
1
5
N/A
N/A
N/A
Yes
Yes
No
No
Yes
No
N/A
N/A
5
5
N/A
N/A
5
1
Yes
No
No
Yes
Yes
5
0
1
5
5
No
No
Yes
Yes
No
Yes
No
No
N/A
N/A
5
5
1
5
0
1
Yes
Civil
Shelter Body / Outdoor Grillage
Tower
Pylon , RDU , Mast(s) , Side Arm(s)
Tower Verticality and galvanization
chor bolts fixation , tighten and coated by grease for tower / mast legs
all RDU wires tension & fixation
all earthing plates on the Tower are coating with antistatic grease
all cables are attached to the tower ( there is no fly cables )
Safety Wire fixation , galvanization & corrosion status
Tower platform existence and fixation
Tower painting (under check)
Tower members bolts fixation
Antennas Brackets fixation , galvanization and grounding
Palm Tree , Mono-pole
step Bolts / (Palm - Mono pole) ladder condition [ missing-loose-rusty ]
Anchor Bolts for the base [ missing - loose - rusty ]
Safety Wire fixation , galvanization , tension & corrosion status
Feeders holder wires installation [ tension - corrosion ] status
Access door [ exist - locked ]
Water Drain pipe installation and route
Camouflage status [ Scratch / damage ]
Palm Tree leaves installation far from the MW Dish & Antennas
Antennas Jumpers & IF cable arrangement
Yes
Yes
No
Yes
Yes
Yes
Yes
Yes
Yes
N/A
N/A
1
5
5
5
5
5
5
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
Yes
No
Yes
No
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
1
5
1
5
1
Generator
Score
telecom SQI
total Score
OK
MN
23
1
Score
CW SQI
total Score
OK
MN
CW SQI
40
0
Score
Total SQI
total Score
OK
MN
63
Scoring Description
Severity
Severitiy
SOW
critical
critical
major
major
major
major
critical
generator
N/A
N/A
N/A
N/A
N/A
N/A
N/A
critical
major
critical
minor
major
minor
major
major
critical
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
critical
minor
minor
Yes
Yes
Yes
major
Yes
critical
major
major
Yes
Yes
Yes
critical
critical
major
Yes
Yes
Yes
Comment
major
critical
major
major
critical
major
critical
Yes
Yes
Yes
N/A
Yes
N/A
Yes
major
critical
major
critical
N/A
N/A
N/A
N/A
critical
major
critical
critical
major
critical
major
critical
major
major
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
critical
major
critical
N/A
N/A
N/A
critical
major
major
Yes
Yes
Yes
critical
major
critical
critical
major
major
N/A
N/A
N/A
N/A
N/A
N/A
critical
critical
critical
major
critical
critical
critical
major
Yes
N/A
Yes
Yes
Yes
N/A
Yes
Yes
critical
critical
critical
major
major
major
major
minor
Yes
Yes
Yes
Yes
Yes
N/A
Yes
Yes
critical
Yes
critical
critical
critical
critical
major
major
major
major
Yes
Yes
Yes
Yes
N/A
Yes
Yes
N/A
minor
minor
major
major
critical
major
major
major
N/A
N/A
Yes
Yes
N/A
N/A
Yes
Yes
major
critical
major
critical
major
Yes
Yes
Yes
Yes
Yes
major
major
major
major
major
major
critical
major
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
critical
Yes
major
critical
major
critical
critical
critical
major
critical
critical
N/A
N/A
Yes
Yes
Yes
Yes
Yes
Yes
Yes
critical
critical
critical
major
major
major
major
critical
major
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
critical
critical
major
major
major
major
major
major
major
major
major
major
major
major
major
major
major
major
major
major
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
major
124
155
MJ
CR
1
210
255
MJ
CR
2
334
410
MJ
CR
15
Yes
No
N/A