NAMA JALAN

SUBKONTRAKTOR

(3)

(4)

(5)

KOTA TINGGI

TARIKH ARAHAN KERJA (AK)


DIKELUARKAN

TARIKH MULA
KERJA
(AK)

TARIKH TETO
TERIMA (AK)

TARIKH SIAP
KERJA
(AK)

TARIKH MULA
KERJA DITAPAK

TARIKH SIAP
KERJA DITAPAK

+/- hari Siap


Kerja

CATATAN

(6)

(7)

(8)

(9)

(10)

(11)

(12)

(13)

(16)

(17)

Reconstruction, Regulate &


Overlay

4/8/2016

5/2/2016

5/7/2016

5 days

100

4/20/2016

7/18/2016

8/17/2016

100

4/20/2016

6/10/2016

6/16/2016

100

4/20/2016

6/23/2016

6/24/2016

100

4/20/2016

6/27/2016

6/30/2016

100

4/20/2016

6/25/2016

6/28/2016

100

4/20/2016

7/18/2016

7/24/2016

85

Reconstruction, Regulate &


Overlay
Reconstruction, Regulate &
Overlay
Reconstruction, Regulate &
Overlay
Reconstruction, Regulate &
Overlay
Reconstruction, Regulate &
Overlay
Reconstruction, Regulate &
Overlay
Reconstruction, Regulate &
Overlay
TOTAL

2
3

KAEDAH

STATUS
KEMAJUAN
FIZIKAL (%)

(1)

NO. JALAN

BIL DAERAH

6
7
8

Note:

Jenis Kerja
Premix
Road Line
Road Shoulder
Site Clearing

Weightage (%)
85
5
5
5

4/20/2016