You are on page 1of 14

TETO ENGINEERING SDN BHD

PRIVATISATION OF PENINSULAR STATE ROAD MAINTENANCE


~ PERIODIC MAINTENANCE ~

MAPPING / LAYOUT
State

JOHOR

District

KOTA TINGGI

Route No

J092 JALAN BUKIT SAMSU

Route Name

JALAN JOHOR BAHRU-MELAKA

Date

Sec No / Km

SEKSYEN 0.000 - 0.400

Ref No

Description

RESURFACES ACW20

Sketches / Photograph

Calculation

TOTAL

Prepared By :

(Site Supervisor)
.
TETO ENGINEERING Sdn Bhd

Witness By :

(I.O.W)
.
LEADER SCOPE CONSULTANT

2,514.62m

Approved By:

.
(JKR)

TETO ENGINEERING Sdn. Bhd

PENSWASTAAN PENYELENGGARAAN JALAN-JALAN NEGERI DI SEMENANJUNG MALAYS


SELATAN )
SITE MEASUREMENT FOR PAVEMENT WORKS
Section
: 0.000 - 0.400
Location
092 JALAN BUKIT SAMSU
Work Description:
RESURFACE

Width
(m)
12.80
5.70
4.90
5.70

Chainage
0.00
0.100
0.200
0.262

Total

CLIENT REP

Length
(m)
0
100.0
100.0
62.0

262.0

Contract No
Contractor
Date

Depth
(m)

Area
(m2)

:
:
08/17/2016

Volume
(m3)

925.0
530.0
328.6

F/L
F/L
F/L

1783.60

SSSSB REP

DIRECTION

SIGNATURE
DATE

:
:

SIGNATURE
DATE

:
:

NGINEERING Sdn. Bhd

ALAN-JALAN NEGERI DI SEMENANJUNG MALAYSIA ( ZON


SELATAN )

EMENT FOR PAVEMENT WORKS

REMARKS

TETO ENGINEERING Sdn. Bhd

PENSWASTAAN PENYELENGGARAAN JALAN-JALAN NEGERI DI SEMENANJUNG MALAYS


SELATAN )
SITE MEASUREMENT FOR PAVEMENT WORKS
Section
: 0.000 - 0.400
Location
092 JALAN BUKIT SAMSU
Work Description:
RESURFACE

Width
(m)
5.70
4.90
4.30

Chainage
0.00
0.100
0.143

Total

CLIENT REP

Length
(m)
0
100.0
43.7

143.7

Contract No
Contractor
Date

Depth
(m)

Area
(m2)

:
:
08/17/2016

Volume
(m3)

530.0
201.0

F/L
F/L

731.02

SSSSB REP

DIRECTION

SIGNATURE
DATE

:
:

SIGNATURE
DATE

:
:

NGINEERING Sdn. Bhd

ALAN-JALAN NEGERI DI SEMENANJUNG MALAYSIA ( ZON


SELATAN )

EMENT FOR PAVEMENT WORKS

REMARKS

TETO ENGINEERING Sdn. Bhd

PENSWASTAAN PENYELENGGARAAN JALAN-JALAN NEGERI DI SEMENANJUNG MALAYS


SELATAN )
SITE MEASUREMENT FOR PAVEMENT WORKS
Section
: 2.000
Location
092 JALAN BUKIT SAMSU
Work Description:
RESURFACE

Width
(m)
4.30
4.70
4.40
4.40

Chainage
0.00
0.100
0.200
0.26

Total

CLIENT REP

Length
(m)
0
100.0
100.0
56.3

256.3

Contract No
Contractor
Date

Depth
(m)

Area
(m2)

:
:
08/17/2016

Volume
(m3)

450.0
455.0
247.72

F/L
F/L
F/L

1152.72

SSSSB REP

DIRECTION

SIGNATURE
DATE

:
:

SIGNATURE
DATE

:
:

NGINEERING Sdn. Bhd

ALAN-JALAN NEGERI DI SEMENANJUNG MALAYSIA ( ZON


SELATAN )

EMENT FOR PAVEMENT WORKS

REMARKS

PRIVATISATION OF PENINSULAR STATE ROAD MAINTENANCE


~ PERIODIC MAINTENANCE ~

MAPPING / LAYOUT
State

JOHOR

District

KOTA TINGGI

Route No

Route Name

JALAN JOHOR BAHRU-MELAKA

Date

Sec No / Km

SEKSYEN 2.000

Ref No

Description

RESURFACES ACW20

Sketches / Photograph

Calculation

TOTAL

1,152.72m