You are on page 1of 3

TPDDL comments on SAS for Rohini-30

S. No. Document Reference.


PCM projectTPDDL
file will Comments
be same as per
Dheerpur and to be taken from Mr. Girish
1
CRP
Gangappa
2

IP Address starts from


172.16.30.XXX
LDR shall be with direct FO compatibility

CRP

CRP

CRP

any two or multiple relays shall be done in


goose only.

CRP

Complete Project file to be sent via google


drive prior 30 days of i-fat

CRP

11 kV relays configuration to be done


based on project file obtained from ABB
Bangaluru no configuration other than
incremental to be done on REF-615 or
from Nashik or from any where else.

CRP

PCM

10

CRP

11

66 kv BCPU, PU

12

i-FAT

13

CRP

PCM Version to be intregated within 10


days after drg approval along with hot fix
and
ID connectivity
Packages.
All Hardware
Interlock
i.e applicable for

After completion of 11 kV project file work


the same project file will be sent to
Bangaluru for system configuration.
Time to Time project development on PCM
to be shared with TPDDL to ensure ZERO
deviation of signals & smooth project
completion
Please refer and comply CRP drg for
respective comments
Mapping of fault locator, fault current and
summation KA2 parameter at SCADA.
i-FAT to be done for 11kv switchgear, 66kv
CRP & SAS panels during inspection ,
procedure for the same to be submitted
for approval
Mounting height of equipment/IEDs on GA
drawing to be mentioned

Remarks

TPDDL comments on 11kv switchgear panels for


Rohini-30
S. No. Document Reference.
TPDDL
PCM project
file willComments
be same as per
Dheerpur and to be taken from Mr. Girish
1
PCM for 11 kV
Gangappa
2

IP Address starts from


172.16.30.XXX
Pl ensure proper holes arrangement
provision for cable termination at panel
end . For 3-core cable : provision of 2
holes and for 1-core cable : provision of
4 holes shall be there.
Same arrangement shall be ensured at
termination kits also.

Holes
arrangement

11 kV

PCM Version to be intregated within 10


days after drg approval along with hot fix
and ID connectivity Packages.

11 kV

All Hardware Interlock i.e applicable for


any two or multiple relays shall be done
in goose only.

11 kV

Complete Project file to be sent via


google drive prior 30 days of i-fat

11 kV

11 kV relays configuration to be done


based on project file obtained from ABB
Bangaluru no configuration other than
incremental to be done on REF-615 or
from Nashik or from any where else.

11 kV

PCM

10

11 kV Swgr

11

12

13
14
15
16

After completion of 11 kV project file


work the same project file will be sent to
Bangaluru for system configuration.
Time to Time project development on
PCM to be shared with TPDDL to ensure
ZERO deviation of signals & smooth
project
completion
Please refer
and comply 11 kV Swgr drg
for respective comments in the scanned
copy
alsoof fault locator, fault current
Mapping

and summation KA2 parameter at


SCADA.
kindly confirm whether castle key
locking arrangement is available with
castle key
arrangement for capacitor bank panel. BSL to also confirm
capacitor panel the same with capacitor bank
manufacture
kindly refer the attached annexure-1 for
points confirmed by ABB team with our
Annexure-1
user. Kindly confirm as per attached
annexure-1.
Sparesshare
list tothe
be relay
submitted
Spares list
kindly
order separately
code
relay order code separately
elster meter offered model
catalogue/technical data sheet to be
meter details
shared with us
11 KV BCPU, PU

17

cleating
arrangement

Cleat arrangement to be provided under


all the panels

18

Labels

Labels both external & internal shall be


made on non-rusting anodized
aluminium as per TPDDL specifications

Remarks

For RG-30 Only

19

CT terminals

kindly clarify why non-disconnecting


type terminals not preferred by
manufacturer, while same seems better
to avoid accidental secondary of CT
when compared to disconnecting type
terminals.

You might also like