Design Control Guideline Table

(Basic Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design
Design Input
Output
Review
Review
(Mark Up)
QC Checklist

Review
By DM

QC Check List

Review
By DM

By Other Disciplines
Design
Output
Verification
Method

Design Output
Review
Meeti
Routing PS FE RE PD EE IN SE CE BL SF
ng

PL

SA PEM PR CM

Process Design
Design Basis

PS-C10

Design Criteria

PS-C11

3,4

Conceptual study report

PS-C12

4,5

Process Flow Diagram (PFD) and Utility Flow


Diagram (UFD)

PS-C13

Full check

3,4

Piping & Instrument Flow Diagram (P&ID)

PS-C14

Full check

3,4

Utility Distribution Diagram (UDD)

PS-C15

Full check

Pipe Line P&ID


Description and Philosophy (Process, Control,
Shutdown, Blow down,
Effluent,Drainage,Isolating,
Depressurizing, ...)
Equipment Process Data

PS-C16

Full check

3,4

Sheet(Fixed,Rotary,Fired,Package)
Instrument Process Data Sheet(Control
Valve,On/off Valve,Orifice, PSV)

CHK-PS-051

PS-C17
PS-C18

CHK-PS-075

PS-C19

Simulation(Plant,Pipeline),Calculation(Equipment
Sizing,Flarenet,Exchanger thermal
design,Hydraulic,Depressurizing), Report

PS-C20

4,5

Equipment List

PS-C21

CHK-PS-076

Process Electrical Load List

PS-C22

CHK-PS-077

Relief and Blowdown Load Summary

PS-C23

CHK-PS-078

Utility and Chemical Consumption List

PS-C24

Line Index

PS-C25

Emergency Shutdown (ESD) Diagram

PS-C26

Full check

Safeguard Diagram

PS-C27

Full check

Material Selection Report

PS-C28

3,4

Material Selection Diagram(MSD)

PS-C29

3,4

I
I

R* R* R* R* R* R* R* R* R*
I

I
R

R*

R*

I
R

I
I

I
I
I*
R
R

R
R

Fixed Equipment Design


Specification for Fixed Equipment

FE-C10

CHK-FE-151

3,4

Mechanical Data Sheet for Pig Launcher/Receiver

FE-C11

CHK-FE-172

3,4

Mechanical Data Sheet for Tower, Vessel, Silo, Bin


and Hopper

FE-C12

CHK-FE-152

CHK-FE-177

3,4

Mechanical Data Sheet for Heat Exchanger

FE-C13

CHK-FE-153

CHK-FE-178

3,4

Mechanical Data Sheet for Air Coolers

FE-C14

CHK-FE-154

CHK-FE-179

3,4

Mechanical Data Sheet for Storage Tanks

FE-C15

CHK-FE-155

CHK-FE-180

3,4

Long Lead Item List

FE-C16

3,4

3,4

3,4

R
R

R
R

Rotating & Packaged Equipment Design


Specification for Packages

RE-C10

CHK-RE-001

Specification for Rotary Equipment

RE-C11

CHK-RE-001

CHK-EQ-176

Page 1 of 13

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Basic Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design
Design Input
Output
Review
Review
(Mark Up)
QC Checklist

Review
By DM

QC Check List

Mechanical Data sheet for Pumps

RE-C12

CHK-RE-002

CHK-EQ-181

Mechanical Data sheet for Compressors

RE-C13

CHK-RE-003

CHK-EQ-182

Mechanical Data sheet for Fans and Blowers

RE-C14

CHK-RE-004

Mechanical Data sheet for Cranes and Hoists

RE-C15

CHK-RE-005

Mechanical Data sheet for Package

RE-C16

Long Lead Item (LLI) List

RE-C17

Review
By DM

By Other Disciplines
Design
Output
Verification
Method

Design Output
Review
Meeti
Routing PS FE RE PD EE IN SE CE BL SF
ng

3,4

R R*

3,4

CHK-EQ-183

3,4

CHK-EQ-184

3,4

3,4

3,4

R
R

R*

PL

SA PEM PR CM

R
R

R
R

Piping & Plant Design


Plot Plan (Unit & Overall)

PD-C10

CHK-PD-008

CHK-PD-107

3,5

Piping Design Specification


Piping Material Specification and Wall Thickness
Calculation
Block Model Review & Report

PD-C12

CHK-PD-010

CHK-PD-128

3,4

PD-C13

CHK-PD-011

CHK-PD-119

3,4

PD-C14

CHK-PD-013

CHK-PD-113

3,5

Piping Block Model

PD-C15

CHK-PD-014

CHK-PD-101

3,5

R* R* R*

A/G Piping Routing Study

PD-C16

CHK-PD-019

CHK-PD-103

3,5

R*

U/G Piping Routing Study

PD-C17

CHK-PD-020

CHK-PD-105

3,5

Piping Line List

PD-C18

CHK-PD-024

CHK-PD-138

3,4

Conceptual Structure Single Line Diagram

PD-C19

CHK-PD-026

CHK-PD-129

3,5

Valve Data sheet

PD-C20

CHK-PD-040

CHK-PD-140

3,4

Piping MTO and BOQ

PD-C21

CHK-PD-046

CHK-PD-146

3,5

Pipe Support specification

PD-C22

CHK-PD-047

CHK-PD-147

3,5

Stress Analysis Specification

PD-C23

CHK-PD-050

CHK-PD-150

3,5

Paint Specification

PD-C24

CHK-PD-051

CHK-PD-151

3,5

Insulation Specification

PD-C25

CHK-PD-052

CHK-PD-152

3,5

Welding Specification

PD-C26

CHK-PD-053

CHK-PD-159

3,5

Package Pipe works Specification

PD-C27

CHK-PD-053

CHK-PD-153

3,4

Specification for Additional Requirment for


Material (Sour services , etc)

PD-C28

CHK-PD-054

CHK-PD-154

3,4

Hydrotest Specification

PD-C29

CHK-PD-056

CHK-PD-155

3,4

Specification for Prefabrication and Testing of


Steel Piping

PD-C30

CHK-PD-058

CHK-PD-156

3,4

Tie - in List

PD-C31

3,5

R*

R* R* R*

R*

R
R

R*

R* R*

R*

R*

I
I

R
R

I
I
R

R*

Electrical Design
Electrical Design Criteria

EE-C10

3/4

Conceptual Reports

EE-C11

3/4

Electrical equipment Specification

EE-C12

3/4

Page 2 of 13

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Basic Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design
Design Input
Output
Review
Review
(Mark Up)
QC Checklist

Review
By DM

QC Check List

Review
By DM

By Other Disciplines
Design
Output
Verification
Method

Design Output
Review
Meeti
Routing PS FE RE PD EE IN SE CE BL SF
ng

Specification for EDG (Generator)

EE-C13

3/4

Data Sheet for EDG (Generator)

EE-C14

3/4

Electrical Equipment Datasheet

EE-C15

Electrical Load List

EE-C16

Power System Analysis

EE-C17

Electrical Load/Motor Schedule and Control List

EE-C18

Diesel Generator Sizing

EE-C19

Single Line Diagram

EE-C20

Metering & Protection Diagram

EE-C21

Cable Sizing

EE-C22

CHK-EE-261

Cable Routing Layout (U/G)

EE-C23

CHK-EE-262

CHK-EE-280

Indoor (Building) Lighting System Layout


Outdoor (Area) Lighting and small power System
Layout
Street Lighting Layout

EE-C24

CHK-EE-254

CHK-EE-273

3/4

EE-C25

CHK-EE-255

CHK-EE-271

3/4

CHK-EE-282

3/4

Cathodic Protection Layout

EE-C27

CHK-EE-257

CHK-EE-281

3/4

Grounding System Layout

EE-C28

CHK-EE-259

CHK-EE-277

3/4

Substation Equipment Layout

EE-C29

CHK-EE-260

CHK-EE-279

3/4

DC System Sizing

EE-C30

3/4

UPS System Sizing

EE-C31

3/4

3/4

CHK-EE-252

CHK-EE-283

3/4

3/4
3/4

CHK-EE-253

EE-C26

CHK-EE-278

3/4

3/4

PL

SA PEM PR CM

R
R

R
R

I
R

Control & Instrumentation Design


Instrument Design Criteria

IN-C51

Preliminary Main Cable Way Layout


Instrument Data Sheet (for valves and flow
elements)
Control System Configuration

IN-C52

CHK-IN-332

CHK-IN-342

IN-C53

CHK-IN-331

CHK-IN-341

IN-C54

CHK-IN-352

Specifications
Typical wiring connection list (as per client
request)
Preliminary Equipment Arrangement in Control

IN-C55

CHK-IN-347

IN-C56

CHK-IN-353

room
Basic Logic Diagram (as per client request)

CHK-IN-351

3/4

IN-C57

CHK-IN-335

CHK-IN-348

IN-C58

CHK-IN-336

CHK-IN-349

Utility consumption list (electrical/air),(as per


client request)

IN-C59

CHK-IN-353

Instrument list and preliminary MTO

IN-C60

CHK-IN-350

Telecommunication (Telephone, PA/GA, Intercom)


System Layout

TE-C10

CHK-TL-011

3/4

CHK-SE-401

CHK-TL-001

I
I

I
R

I
I

I
R

Structural Design
Specification and General drawings

SE-C10

Page 3 of 13

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Basic Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design
Design Input
Output
Review
Review
(Mark Up)
QC Checklist

Scope of Work for Geotechnical Investigation (By


Third Party)

SE-C11

Geotechnical Report

Review
By DM

QC Check List

Review
By DM

CHE-SE-403

By Other Disciplines
Design
Output
Verification
Method

Design Output
Review
Meeti
Routing PS FE RE PD EE IN SE CE BL SF
ng

SE-C12

Preliminary drawings

SE-C13

3,5

M.T.O.

SE-C14

CHK-SE-402

3,5

PL

R*
R

SA PEM PR CM

R*

R
R

Civil Design
Specifications & Design Criteria

CE-C10

CHK-CE-451

CHK-CE-471

Scope of Work for topographic Survey

CE-C11

CHK-CE-452

CHK-CE-472

General Drawings

CE-C12

CHK-CE-453

CHK-CE-473

Overall Site Plan

CE-C13

CHK-CE-454

CHK-CE-474

Fencing Layout

CE-C14

CHK-CE-455

CHK-CE-475

Priliminary Drainage Layout

CE-C15

CHK-CE-456

CHK-CE-476

Priliminary Road and Payving layout

CE-C16

CHK-CE-457

CHK-CE-477

Rough Grading

CE-C17

CHK-CE-458

CHK-CE-478

3/4

R*

Preliminary Access Road Plan

CE-C18

CHK-CE-459

CHK-CE-479

3/4

Topographical Plan

CE-C19

CHK-CE-460

CHK-CE-480

Under ground Layout

CE-C20

CHK-CE-461

CHK-CE-481

3/4

Route Plan For Over Head Lines

CE-C21

CHK-CE-462

CHK-CE-482

CE-C22

CHK-CE-463

CHK-CE-483

3/4

Buildings Design Criteria & Material Specification

BL-C10

CHK-BL-101

CHK-BL-151

Basic DWG (Non Industrial)

BL-C11

CHK-BL-103

CHK-BL-153

Basic DWG (Industrial )

BL-C12

CHK-BL-103

CHK-BL-153

R* R* R* R

Buildings and Shelters BOQ

BL-C13

CHK-BL-107

CHK-BL-157

Architectural Symbols, Abbreviations and Notes

BL-C14

Site Plan Basic Design (Non-Industrial)

BL-C15

CHK-BL-109

3,4

HVAC & Plumbing Design Criteria

BL-C16

CHK-BL-201

Mechanical Flow Diagram for Buildings

BL-C17

CHK-BL-204

HVAC Equipment Specification

BL-C18

CHK-BL-201

HVAC & Plumbing standard drawing

BL-C19

HVAC & Plumbing Symbol & Legend

BL-C20

Preliminary MTO for main HVAC equipment

BL-C21

CHK-BL-205

Pipeline Design Criteria

PL-C10

CHK-PL-001

CHK-PL-101

Specification For Pipeline Stress Analysis

PL-C11

CHK-PL-102

M.T.O.

R*

R*
R

R
I

R
R*

I
R

R*

R
I

Building Design
R
R

4
4

CHK-BL-251
CHK-BL-251

I
I

Pipeline Design

Page 4 of 13

R
R

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Basic Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design
Design Input
Output
Review
Review
(Mark Up)
QC Checklist

Review
By DM

QC Check List

Review
By DM

By Other Disciplines
Design
Output
Verification
Method

Specification For Pipeline Material (PMS)

PL-C12

CHK-PL-103

Specification For 3 Layer PE and P.P Coating


Materials

PL-C13

CHK-PL-104

Specification For Heat Shrinkable Sleeve

PL-C14

CHK-PL-105

Specification For Anchor Flange

PL-C15

CHK-PL-106

Specification For Insulation Joint (Flange or Kit)

PL-C16

CHK-PL-107

Specification For Pipe

PL-C17

CHK-PL-108

Specification For Welding Electrodes

PL-C18

CHK-PL-109

Specification For Pipeline X-Ray Film And


Chemichals

PL-C19

CHK-PL-110

Specification For Hydrotest Inhibitor

PL-C20

CHK-PL-111

Specification For Pipeline Pigs

PL-C21

CHK-PL-112

Specification for Excavation & Backfilling

PL-C22

CHK-PL-113

Specification of R.O.W

PL-C23

CHK-PL-114

Specification for Stringing of Pipelines

PL-C24

CHK-PL-115

Soecification for Bending of Pipelines

PL-C25

CHK-PL-116

Specification For Welding and NDT of Pipeline

PL-C26

CHK-PL-117

Specification For Clean-up of pipeline

PL-C27

CHK-PL-118

Specification For Hydrotest Of Pipeline

PL-C28

CHK-PL-119

Calculation For Wall Thickness

PL-C29

CHK-PL-021

CHK-PL-121

3/4

Stress Analysis Report for Pipeline

PL-C30

CHK-PL-022

CHK-PL-122

3/4

Data sheet For Valve

PL-C31

CHK-PL-023

CHK-PL-123

3/4

Data sheet For Anchor Flange

PL-C32

CHK-PL-024

CHK-PL-124

3/4

Data sheet For Insulation Joint (Flange or Kit)

PL-C33

CHK-PL-025

CHK-PL-125

3/4

Material Take Off for pipeline (MTO)

PL-C34

CHK-PL-026

CHK-PL-126

3/4

Material Take Off for support

PL-C35

CHK-PL-027

CHK-PL-127

3/4

Typical Drawings for Crossings

PL-C36

CHK-PL-128

Typical Drawings for Pipe Support

PL-C37

CHK-PL-129

PL-C38

CHK-PL-130

PL-C39

CHK-PL-131

PL-C40

CHK-PL-132

Typical Drawing for R.O.W for U/G and A/G


Pipelines
Typical Drawing For Pipeline Main Block Valve
and Check Valve
Typical Drawing for Access Road

Page 5 of 13

Design Output
Review
Meeti
Routing PS FE RE PD EE IN SE CE BL SF
ng

PL

SA PEM PR CM

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Basic Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design
Design Input
Output
Review
Review
(Mark Up)
QC Checklist

Review
By DM

QC Check List

Review
By DM

By Other Disciplines
Design
Output
Verification
Method

Design Output
Review
Meeti
Routing PS FE RE PD EE IN SE CE BL SF
ng

Typical Drawing for Geotextile Sheet Installation

PL-C41

CHK-PL-133

Typical Drawing for Warning Sign and Line


Marker

PL-C42

CHK-PL-134

Typical Drawing for different trenches

PL-C43

CHK-PL-135

Pipeline Route Plan

PL-C44

CHK-PL-036

CHK-PL-136

Pipeline Plan and Profile

PL-C45

CHK-PL-037

CHK-PL-137

Material Requisition For pipeline components

PL-C46

CHK-PL-038

CHK-PL-138

Bill of Quantity for pipline components

PL-C47

CHK-PL-039

CHK-PL-139

Safety & Fire Fighting Equipement layout

SF-C10

CHK-SF-003

CHK-SF-103

Safety Concept/ Safety Design Criteria

SF-C11

3,4

Active Fire Fighting Specification

SF-C12

3,4

Passive Fire Protection Specification

SF-C13

3,4

Fire & Gas Detection and Alarm Design Criteria

SF-C14

3,4

Blast Protection Design Criteria

SF-C15

3,4

Hazardous Equipment Table / Hazard Source List

SF-C16

CHK-SF-004

CHK-SF-104

3,4

Hazardous Area Classification Drawing

SF-C17

CHK-SF-005

CHK-SF-105

3,4

Fire Proofing Zone Plan

SF-C18

CHK-SF-007

CHK-SF-107

3,4

Fire & Gas Detection Layout

SF-C19

CHK-SF-011

CHK-SF-111

3,4

Safety Equipment List

SF-C20

CHK-SF-012

CHK-SF-112

3,4

Fire Water P&ID/Distribution Diagram

SF-C21

CHK-SF-014

CHK-SF-114

HAZID Report

SF-C22

3,4

HAZOP Report

SF-C23

3,4

EIA Report

SF-C24

3,4

Consequence Analysis Report

SF-C25

3,4

Fire Water Demand Calculation

SF-C26

3,4

Fire Water Network Calculation

SF-C27

3,4

Waste Management Plan

SF-C28

3,4

F&G Cause & Effect Matrix

SF-C29

CHK-SF-015

CHK-SF-115

Automatic Gas Extinguishing System P&ID

SF-C30

CHK-SF-017

CHK-SF-117

Automatic Gas Extinguishing System Specification

SF-C31

PL

SA PEM PR CM

3/4

Safety Design

3,4

3,4

I
I

I
I

R
I

I
I

3,4
3,4

3,4

= Optional or where applicable ; Decision by Originator based on contract

Page 6 of 13

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Basic Design)
Activity / Document Type

By Originating Discipline
Design
Design Input
Output
Review
Review
(Mark Up)

Category
Code

QC Checklist

Review
By DM

QC Check List

Review
By DM

By Other Disciplines
Design
Output
Verification
Method

Design Output
Review
Meeti
Routing PS FE RE PD EE IN SE CE BL SF
ng

PL

SA PEM PR CM

Codings Legend :
3= Independent Review (by an Expert outside of Project Team)
4= Comparing with similar designs in other projects
5= Simulation
6= Alternative Calculation

For Information &) ( For Review & Comment) 2


. issue ( For Information & Input) .( Input

Page 7 of 13

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Detailed Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design Input
Design Output
Review
Review
QC Checklist

By Other Disciplines
Design Output
Review

By Dept.
By Dept.
QC Check List
Manager
Manager

Design
Output
Verification
Method

Full check

3,4

I
I

Meeting RoutingPS FE RE PD EE IN SE CE BL SF

PL SA PEM PR CM

Process Design
Piping & Instrument Flow Diagram (P&ID),Utility
Distribution Diagram (UDD)

PS-C10

Pipe Line P&ID

PS-C11

3,4

P&IDs and UDD change notice

PS-C12

Calculation(Flarenet,Depressurizing,Hydraulic)

PS-C13

Instrument Process Data Sheet(Field Instruments,PSV)

PS-C14

Cuase & Effect Matrix

PS-C15

Chemicals & Lubricants Material Requisition

PS-C16

Chemicals & Lubricants TBE

PS-C17

PS-C18

3,4
3,4
3,4
3,4
3,4
3,4
3,4
3
3
3
3
3
3
3
3
3

3,4

3,4

Operating Manual,Pre-commissioning and Commissioning


Procedure
Fixed Equipment Design
Mechanical Data sheet for Towers , Vessels, Silos, Bins
and Hoppers
Mechanical Data sheet for Heat Exchangers
Mechanical Data sheet for Air Coolers
Mechanical Data sheet for Storage Tanks
Mechanical Data sheet for Pig luncher and receiver
Mechanical Data sheet for Filter
Mechanical Data sheet for Electrical Heater
Material Requisition
Technical Bid Evaluation for Filter
Technical Bid Evaluation for Electrical Heater
Technical Bid Evaluation for Drums/Columns Internal
Technical Bid Evaluation for Vessels, Silos, Bins and
Hoppers
Technical Bid Evaluation for Heat Exchangers
Technical Bid Evaluation for Air Coolers
Technical Bid Evaluation for Pig Launcher & Receiver
Technical Bid Evaluation for Storage Tanks

FE-C10
FE-C11
FE-C12
FE-C13
FE-C14
FE-C15
FE-C16
FE-C17
FE-C18
FE-C19
FE-C20
FE-C21
FE-C22
FE-C23
FE-C24
FE-C25

CHK-FE-152
CHK-FE-153
CHK-FE-154
CHK-FE-155
CHK-FE-172
CHK-FE-171
CHK-FE-173
CHK-FE-161
CHK-FE-174
CHK-FE-176
CHK-FE-170
CHK-FE-162
CHK-FE-163
CHK-FE-164
CHK-FE-175
CHK-FE-165

CHK-FE-177
CHK-FE-178
CHK-FE-179
CHK-FE-180

Mechanical Data sheet for Pumps

RE-C10

CHK-RE-002

CHK-EQ-181

Mechanical Data sheet for Compressors

RE-C11

CHK-RE-003

CHK-EQ-182

Mechanical Data sheet for Fans and Blowers

RE-C12

CHK-RE-004

CHK-EQ-183

3,4

Mechanical Data sheet for Cranes and Hoists

RE-C13

CHK-RE-005

CHK-EQ-184

Mechanical Data sheet for Package

RE-C14

Material Requisition

RE-C15

CHK-RE-006

Technical Bid Evaluation for Pumps

RE-C16

CHK-RE-007

Technical Bid Evaluation for Compressors

RE-C17

CHK-RE-008

CHK-FE-186

CHK-FE-187

I*

I
R

Refer To P&ID Mechanization Procedure


PCD-ED-456
R
I
R

R* R*

R* R*
R
R
R
R
R
R
R
R
R*
R*
R*
R
R
R

R
R
R
R
R

R
I

R
R
R
R*
R R
R R
R

R*
R
R
R
R

R
R

R
R

Rotating & Packaged Equipment Design

CHK-EQ-186

Page 8 of 13

3,4

3,4

R R*

R R*

R
R
R

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Detailed Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design Input
Design Output
Review
Review
QC Checklist

Technical Bid Evaluation for Fans and Blowers

By Dept.
By Dept.
QC Check List
Manager
Manager

Design
Output
Verification
Method

By Other Disciplines
Design Output
Review
Meeting RoutingPS FE RE PD EE IN SE CE BL SF

RE-C18

CHK-RE-009

Technical Bid Evaluation for Over Head Cranes and Hoists RE-C19

CHK-RE-010

Technical Bid Evaluation for Packaged Equipment

RE-C20

CHK-RE-011

Piping Key Plan

PD-C10

CHK-PD-009

CHK-PD-116

Plot Plan

PD-C11

CHK-PD-008

CHK-PD-107

3,5

Piping Construction Specification

PD-C12

CHK-PD-012

CHK-PD-112

3,4

Intermediate Model Review

PD-C13

CHK-PD-015

CHK-PD-115

3,4,5

R* R* R*

R* R* R* R* R* R* R*

Final Model Review

PD-C14

CHK-PD-017

CHK-PD-117

3,4,5

R* R* R*

R* R* R* R* R* R* R*

A/G Piping General Arrangement Drawing

PD-C15

CHK-PD-019

CHK-PD-103

U/G Piping General Arrangement Drawing

PD-C16

CHK-PD-020

CHK-PD-105

Piping Isometric Drawing

PD-C17

CHK-PD-021

CHK-PD-108

Equipment Nozzle Orientation

PD-C18

CHK-PD-022

CHK-PD-132

3,5

Equipment Clip Information

PD-C19

CHK-PD-023

CHK-PD-130

3,5

P&IDs and UDD Mechanization with change notice

PD-C20

CHK-PD-049

CHK-PD-149

Piping Stress Critical Line List

PD-C21

CHK-PD-025

CHK-PD-120

Structure Single Line Diagram

PD-C22

CHK-PD-026

CHK-PD-129

3,5,6

Pipe Support List

PD-C23

CHK-PD-027

CHK-PD-118

3,5

Standard Pipe Support Drawings

PD-C24

CHK-PD-028

CHK-PD-124

3,5

Special Pipe Support Drawings

PD-C25

CHK-PD-029

CHK-PD-121

3,4,5

Stress Analysis Reports

PD-C26

CHK-PD-030

CHK-PD-127

3,5

Piping Requisitions

PD-C27

CHK-PD-031

CHK-PD-131

Piping Technical Bid Evaluations

PD-C28

CHK-PD-053

CHK-PD-153

Piping Special Item List and Drawings

PD-C29

CHK-PD-038

CHK-PD-122

Expansion Joint Datasheet

PD-C30

CHK-PD-041

CHK-PD-141

Spring Support Datasheet

PD-C31

CHK-PD-042

CHK-PD-125

Support MTO

PD-C32

CHK-PD-043

CHK-PD-143

3,5

Insulation MTO

PD-C33

CHK-PD-044

CHK-PD-144

3,5

Paint MTO

PD-C34

CHK-PD-045

CHK-PD-145

3,5

Piping MTO

PD-C35

CHK-PD-046

CHK-PD-146

3,5

Piping Assembly

PD-C36

CHK-PD-048

CHK-PD-148

3,4,5

Line List

PD-C37

CHK-PD-024

CHK-PD-138

3,5

PL SA PEM PR CM

Piping & Plant Design

R R

I
R R

I
R

I
R

I
R

Refer To P&ID Mechanization Procedure

3
R

R
R

Electrical Design
Electrical Design Criteria

EE-C10

Page 9 of 13

3/4

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Detailed Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design Input
Design Output
Review
Review
QC Checklist

By Dept.
By Dept.
QC Check List
Manager
Manager

Design
Output
Verification
Method

By Other Disciplines
Design Output
Review
Meeting RoutingPS FE RE PD EE IN SE CE BL SF

PL SA PEM PR CM

Electrical equipment Specification

EE-C11

Data Sheet for EDG (Generator)

EE-C12

Material Requistion

EE-C13

Technical Bid Evaluation

EE-C14

3/4

Electrical Load List

EE-C15

Power System Analysis

EE-C16

Electrical Load/Motor Schedule and Control List

EE-C17

3/4

Relay Setting Schedule

EE-C18

Diesel Generator Sizing

EE-C19

Single Line Diagram

EE-C20

Metering & Protection Diagram

EE-C21

3/4

Schematics/Logic and Control Diagrams

EE-C22

3/4

Cable Sizing

EE-C23

CHK-EE-261

Cable Routing Layout (U/G)

EE-C24

CHK-EE-262

CHK-EE-280

Cable Tray/Ladder Layout

EE-C25

CHK-EE-263

Indoor (Building) Lighting System Layout

EE-C26

Outdoor (Area) Lighting and small power System Layout

CHK-EE-252

CHK-EE-283

4
R

CHK-EE-274

CHK-EE-254

CHK-EE-273

3/4

EE-C27

CHK-EE-255

CHK-EE-271

3/4

Cathodic Protection Layout

EE-C28

CHK-EE-257

CHK-EE-281

3/4

R* R

Grounding System Layout

EE-C29

CHK-EE-259

CHK-EE-277

3/4

Substation Equipment Layout

EE-C30

CHK-EE-260

CHK-EE-279

3/4

DC System Sizing

EE-C31

3/4

UPS System Sizing

EE-C32

3/4

Heat Tracing Design

EE-C33

CHK-EE-xxx

CHK-EE-yyy

3/4

Instrument Data Sheet

IN-C10

CHK-IN-331

CHK-IN-341

Main Cable Way Layout - AG

IN-C11

CHK-IN-332

CHK-IN-342

Main Cable Way Layout - UG

IN-C12

CHK-IN-332

CHK-IN-342

Hook-up Drawing

IN-C13

CHK-IN-333

CHK-IN-343

Bulk Material MTO

IN-C14

CHK-IN-344

Technical Bid Evaluation

IN-C15

CHK-IN-345

3/4

Instrument Layout

IN-C16

CHK-IN-346

Grounding Layout

IN-C17

CHK-IN-346

Specification (preparing and developing)

IN-C18

CHK-IN-347

Construction Specification

IN-C19

CHK-IN-347

CHK-EE-253

CHK-EE-278

3/4

R
R

R
R

R*
I
R

Control & Instrumentation Design

CHK-IN-334

Page 10 of 13

R
R*

I
R

R
R

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Detailed Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design Input
Design Output
Review
Review
QC Checklist

By Dept.
By Dept.
QC Check List
Manager
Manager

Design
Output
Verification
Method

By Other Disciplines
Design Output
Review
Meeting RoutingPS FE RE PD EE IN SE CE BL SF

Control/Rack/Analyzer Room Layout and Equipment


Arrangement

IN-C20

CHK-IN-335

CHK-IN-348

3/4

Logic Diagram

IN-C21

CHK-IN-336

CHK-IN-349

Lists: Main Database, I/O, Cable Schedule, Wiring


Connection List,

IN-C22

CHK-IN-350

Material Requisition

IN-C23

CHK-IN-354

3/4

Telecommunication (Telephone, PA/GA, Intercom) System


Layout

IN-C24

CHK-TL-001

CHK-TL-011

3/4

Equipment Foundation Drawing

SE-C10

CHK-SE-411
CHK-SE-412

CHK-SE-421

Foundation Drawing

SE-C11

CHK-SE-411
CHK-SE-412

CHK-SE-422

Concrete Building Drawing

SE-C12

CHK-SE-413
CHK-SE-414

CHK-SE-423

Concrete substation & Control room Drawing

SE-C13

CHK-SE-413
CHK-SE-414

Concrete Pipe Rack Drawing

SE-C14

Concrete Equipment Supporting Drawing

SE-C15

Concrete Pit & pond Drawing

SE-C16

Steel Building Drawing

SE-C17

Steel Pipe rack Drawing

SE-C18

Steel Equipment Supporting Drawing

SE-C19

Steel Platform & Pipe Support Drawing

SE-C20

PDMS Modeling
Shop Drawing
Steel Structure Requisition and Technical Bid Evaluation

SE-C21
SE-C22
SE-C23

PL SA PEM PR CM

I
I

Structural Design

CHK-SE-413
CHK-SE-413
CHK-SE-413
CHK-SE-413
CHK-SE-414
CHK-SE-413
CHK-SE-413
CHK-SE-413

R*

R*

CHK-SE-423

CHK-SE-423

CHK-SE-423

CHK-SE-423

CHK-SE-424

CHK-SE-424

CHK-SE-424

CHK-SE-424

CHK-SE-425
CHK-SE-426
CHK-SE-427

3
-

R
R

Civil Design
Rough Grading

CE-C10

CHK-CE-461
CHK-CE-465

CHK-CE-471

3,5

Finish Grading and Geometric Plan

CE-C11

CHK-CE-461
CHK-CE-466

CHK-CE-472

Surface Water System

CE-C12

CHK-CE-461
CHK-CE-467

CHK-CE-473

Page 11 of 13

I
I

R*

R
I

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Detailed Design)
Activity / Document Type

Category
Code

By Originating Discipline
Design Input
Design Output
Review
Review
QC Checklist

By Dept.
By Dept.
QC Check List
Manager
Manager

Design
Output
Verification
Method

By Other Disciplines
Design Output
Review
Meeting RoutingPS FE RE PD EE IN SE CE BL SF

Sanitary System

CE-C13

CHK-CE-462

CHK-CE-474

Oily Water System

CE-C14

CHK-CE-461

CHK-CE-475

Underground System

CE-C15

CHK-CE-461
CHK-CE-462
CHK-CE-463
CHK-CE-464

CHK-CE-476

Foundation Location Plan

CE-C16

CHK-CE-463

CHK-CE-477

Paving and Landscape

CE-C17

CHK-CE-461

CHK-CE-478

Main Plant Access Road Plan and Profile

CE-C18

CHK-CE-461
CHK-CE-465

CHK-CE-479

3,5

Well Pad Plan and Profile

CE-C19

CHK-CE-461
CHK-CE-465

CHK-CE-480

3,5

Off Plot Access Roads - plan and profile

CE-C20

CHK-CE-461
CHK-CE-466

CHK-CE-481

PDMS Modeling

CE-C21

CHK-CE-482

PL SA PEM PR CM

R*

R*

R*
R*

Building Design
Detail DWG - Non Industrial Buildings

BL-C10

CHK-BL-104

CHK-BL-154

Detail DWG - Industrial Buildings

BL-C11

CHK-BL-104

CHK-BL-154

R* R* R

Site Plan Detail Design (Non-Industrial)

BL-C12

CHK-BL-109

3,4

Architectural MTO/BOQ

BL-C13

CHK-BL-108

Architectural General Details

BL-C14

Requisition

BL-C15

CHK-BL-105

CHK-BL-155

Technical Bid Evaluation

BL-C16

CHK-BL-105

CHK-BL-155

HVAC Calculation Note

BL-C17

CHK-BL-202

CHK-BL-252

Mechanical Flow Diagram for Buildings

BL-C18

CHK-BL-204

HVAC & Plumbing General Details

BL-C19

HVAC Ducting Layout

BL-C20

CHK-BL-203

CHK-BL-253

HVAC Plumbing & Sanitary Layout

BL-C21

CHK-BL-203

CHK-BL-253

HVAC Equipment Layout

BL-C22

CHK-BL-203

CHK-BL-253

R*

HVAC Equipment Schedule

BL-C23

CHK-BL-207

HVAC Equipment Data Sheet

BL-C24

CHK-BL-207

BOQ/MTO of HVAC & Plumbing System

BL-C25

CHK-BL-206

CHK-BL-157

4
4

Page 12 of 13

R
R

R*

PDC-ED-451; Rev.6; Attachment 02

Design Control Guideline Table


(Detailed Design)
Activity / Document Type

By Originating Discipline
Design Input
Design Output
Review
Review

Category
Code

QC Checklist

By Dept.
By Dept.
QC Check List
Manager
Manager

Design
Output
Verification
Method

By Other Disciplines
Design Output
Review
Meeting RoutingPS FE RE PD EE IN SE CE BL SF

PL SA PEM PR CM

HVAC Material Requisition

BL-C26

CHK-BL-208

Technical Bid Evaluation

BL-C27

CHK-BL-208

Material Requisition For pipeline components

PL-C10

CHK-PL-040

3/4

Technical Bid Evaluation For pipeline component

PL-C11

3/4

3,4

Pipeline Design
CHK-PL-140

Safety Design
Safety & Fire Fighting Equipement layout

SF-C10

CHK-SF-003

CHK-SF-103

Hazardous Equipment Table / Hazard Source List

SF-C11

CHK-SF-004

CHK-SF-104

3,4

Hazardous area classification drawing

SF-C12

CHK-SF-005

CHK-SF-105

3,4

Fire proofing zone plan

SF-C13

CHK-SF-007

CHK-SF-107

3,4

Fire & Gas detector layout

SF-C14

CHK-SF-011

CHK-SF-111

Flare Disperssion & Radiation Study

SF-C15

Safety equipment data sheet

SF-C16

Fire Water Demand Calculation

SF-C17

3,4

Fire Water Network Calculation

SF-C18

3,4

Water Spray System Hydraulic Calculation

SF-C19

3,4

Water Spray System P&ID

SF-C20

3,4

Automatic Gas Extinguishing System P&ID

SF-C21

CHK-SF-017

CHK-SF-117

3,4

Safety material requisition

SF-C22

CHK-SF-013

CHK-SF-113

3,4

Technical BID Evaluation

SF-C23

CHK-SF-013

CHK-SF-113

3,4

F&G Cause & Effect Matrix

SF-C24

CHK-SF-015

CHK-SF-115

3,4

CHK-SF-112

3,4
3,4

CHK-SF-012

3,4

R
R
I

= Optional or where applicable ; Decision by Originator based on contract

Codings Legend :
3=
4=
5=
6=

Independent Review (by an Expert outside of Project Team)


Comparing with similar designs in other projects
Simulation
Alternative Calculation

(For Information & Input) ( For Review & Comment) 2


. issue ( For Information & Input) .

Page 13 of 13

PDC-ED-451; Rev.6; Attachment 02