NAME OF PROJECT
Limits
Lurugan
Location
Apprn/Contract Cost
Php3,551,144.68
Source
Lantapan
Bukidnon
2014 DepEd
A. Tests to be performed
ITEM NO.
I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
DESCRIPTION
Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal
Furring)
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate
Sag Rod
UNITS
QTY
NUMBER OF TESTS
REQUIRED
1 lot
1 lot
1,200 md
10 md
4 set
36
28.35
37.91
202.97
cum
cum
cum
cum
363.14 sqm
9.14
611.97
11.89
2,114.39
9.7
2,768.59
17.3
3,060.79
35.32
1,486.04
cum
kg
cum
kg
cum
kg
cum
kg
cum
kg
207.16 sqm
19.2
14.4
30
1
4
sqm
sqm
sqm
lot
set
232.4
54
11.56
557.2
1
sqm
sqm
sqm
sqm
lot
344.84 sqm
395.34
3,163.59
4,579.49
203.02
85.24
sqm
kg
kg
kg
kg
PE Cert
PE Cert
CCS-5
PE Cert
PE Cert
PE Cert
Q-1
Q-1 per size
Q-1 per size
Q-1 / PE Cert
Item 404(g)
SPL 905
XII.
Cross-Bracing
Turn Buckle
Painting Works
341.08 kg
32 each
Q-1 / PE Cert
Q-1 / PE Cert
Q-1 / PE Cert
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets
a
b
c
d
e
839.16 sqm
81.22 sqm
46.31 sqm
1
1
1
1
Cement
Fine Aggregates
Coarse Aggregates
RSB (10,12, 16, 20 mm)
Water
Prepared by:
1,240
119
42
9,011
lot
lot
lot
lot
PE Cert
bags
cum
cum
kg
lit
Q-1
G-1, Q-1
GQ-1
Q-4 per size
PE Certificate
Checked by:
Submitted by:
PE Cert
MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section
Recommending Approval:
DAGARANAO C. CASAN
Project Engineer
Approved by:
NOEL R. OCLARIT
District Engineer
PROGRESS REPORT
August 2014
(Month & Year)
Project
Php 3,551,144.68
Contractor
A.
B.
C.
Inspection
Continuous quality control inspection on all Items of Work were undertaken as
construction progresses particularly on critical activities.
Prepared by:
26%
(Total to Date)
Checked by:
MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section
Submitted by:
DAGARANAO C. CASAN
Project Engineer
STATUS REPORT
October 2014
Date
Project:
Our record indicates thet the status of test of the above-named project for this month is as follows:
ITEM
I.
SPL-5
II.
A.1.1
III.
SPL-1
SPL-2
SPL-3
IV.
803
804(a)
804(b)
804(c)
V.
1000(a)
VI.
900(a)
404(a)
900(b)
404(b)
900(c)
404(c)
900(d)
404(d)
900(e)
404(e)
VII.
506(1)A
VIII.
1010(b)
1005
1010(1)
1010(a)
SPL-4
IX.
1021(c)
1021(c-1)
1021(c-2)
1027(a)
SPL-5
X.
1003
Total Estimated
Quantities
Minimum Number
of Test Required
Number of
Test On File
Test
Balance
% of Test
Accomp
Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Exc. of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling w/ Insulation
(Use Fiber Cement Board & Metal Furring)
XI.
Roof Framing Works
1013
Pre-Painted Metal Sheets
403(a)
Steel Trusses
403(b)
Purlins and Channel Beam
403(c)
Angular Base Plate
404(f)
Sag Rod
404(g)
Cross-Bracing
SPL 905 Turn Buckle
XII.
Painting Works
1032(a-1) Masonry Painting
1032(a-2) Wooden Painting
1032(a-3) Steel Painting
1 lot
1 lot
720
6
2
156.85
20.16
14.85
19.49
102.35
md
md
set
cum
cum
cum
cum
183.74 sqm
5.06
339.98
6.3
1,123.24
5.56
1,574.69
8.68
1,466.08
17.96
756.16
cum
kg
cum
kg
cum
kg
cum
kg
cum
kg
111.52 sqm
sqm
sqm
9.6 sqm
7.2 sqm
15 lot
1 set
2
sqm
116.2 sqm
27 sqm
5.78 sqm
293.96 lot
1
sqm
172.42
PE Cert
PE Cert
PE Cert
CCS-5
CCS-1
PE Cert
1%
PE Cert
0%
CCS-4
20%
100%
PE Cert
PE Cert
0%
PE Cert
PE Cert
0%
PE Cert
PE Cert
0%
Q-1
Q-1
Q-1 / PE Cert
Q-1 / PE Cert
PE Cert
PE Cert
0%
203.84
1,351.55
2,681.63
203.02
42.62
170.54
16
sqm
kg
kg
kg
kg
kg
each
451.94 sqm
41.46 sqm
29.03 sqm
0%
XIII.
1100
1101
1102(a)
1102
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets
a Cement
b Fine Aggregates
c Coarse Aggregates
d RSB (10,12, 16, 20 mm)
e Water
Prepared by:
1
1
1
1
lot
lot
lot
lot
450 bags
50 cum
25 cum
5,525 kg
lit
PE Cert
PE Cert
Q-1
GQ-1
Q-1
GQ-1
GQ-1
Q-4 per size
GQ-1
PE Cert
PE Cert
Q-1
0%
100%
100%
Checked by:
ALDWIN JOHN M. BAYAMBAN
Materials Engineer I
0%
MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section
Submitted by:
DAGARANAO C. CASAN
Project Engineer
0%
100%
SUMMARY OF REPORT
Name of Project and Location
August 2014
For the month of
1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY
(School ID: 126847)
Implementing Office
Project Duration
3,551,144.68
a) Date Started
Number
BCSBifa-1
BCSBica-1
BCSBiq-1
BCSBichb-1
Kind of Test
of Materials
Fine Aggregates
Coarse Aggregates
Quality Tests, Agg
#6CHB
75 cum
75 cum
1500 cum
10,000 pcs
Pulangi River
Pulangi River
Pulangi River
Jobsite
Spec's
Sampled
Item No.
Sieve Analysis
Sieve Analysis
Quality Test
Strength Test
405
405
405
704
By
J.
J.
J.
J.
Gargar
Gargar
Gargar
Gargar
Tested
Date
By
07/29/14
07/29/14
07/29/14
07/29/14
J.
J.
J.
J.
Gargar
Gargar
Gargar
Gargar
Date
07/30/14
07/30/14
07/30/14
07/30/14
900SBiccs- CCS
3.02 cum
Column Footing & WF Compressive
405
J. Gargar 08/06/14 J. Gargar 09/03/14
Notes 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to column (4)
2. Indicate the name of testing laboratories on the sample tested to Column (11)
Prepared by:
Checked by:
Attested by:
JERSON H. LIMOCON
Brillantes Construction, ME
MELCHOR A. BALQUEDRA
Engineer II
ME I # 0558
Submitted by:
DAGARANAO C. CASAN
Project Engineer
3,551,144.68
Tested
REMARKS
at
Jobsite
Jobsite
Jobsite
DPWH, Mly
Passed
Passed
Passed
Passed
Jobsite Passed
DAGARANAO C. CASAN
Project Engineer
September 7, 2014
(Date)
CERTIFICATION OF QUALITY CONTROL ASSURANCE
Project
Contractor
ITEM NO.
Item SPL-1
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
Item 1000(a)
Item 900(a)
Item 404(a)
DESCRIPTION
NOTE:
To be submitted every quarter of the month.
1st report
2nd report
3rd report
4th report
QUANTITY
ACCOMPLISHED
300
36
28.35
37.91
121.78
363.14
9.14
611.97
DAGARANAO C. CASAN
Project Engineer
md
cum
cum
cum
cum
sqm
cum
kg
Contractor
ITEM NO.
Item SPL-1
Item 900(b)
Item 404(b)
Item 506(1)A
DESCRIPTION
NOTE:
To be submitted every quarter of the month.
1st report
2nd report
3rd report
4th report
QUANTITY
ACCOMPLISHED
300
11.89
2114.39
33.22
DAGARANAO C. CASAN
Project Engineer
md
cum
kg
sqm
Contractor
ITEM NO.
Item SPL-1
Item 900(c)
Item 404(c)
Item 506(1)A
Item 1021(c)
Item 1021(c-1)
Item 1027(a)
Item 403(a)
DESCRIPTION
NOTE:
To be submitted every quarter of the month.
1st report
2nd report
3rd report
4th report
QUANTITY
ACCOMPLISHED
300
3.88
1107.44
60
92.96
21.6
250.74
885.81
DAGARANAO C. CASAN
Project Engineer
md
cum
kg
sqm
sqm
sqm
sqm
kg
Contractor
ITEM NO.
Item SPL-6
Item SPL-1
Item SPL-2
Item SPL-3
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
DESCRIPTION
Mobilization/Demobilization
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
NOTE:
To be submitted every quarter of the month.
1st report
2nd report
3rd report
4th report
QUANTITY
ACCOMPLISHED
0.50
300
10
4
14.71
2,601.67
14.13
594.42
DAGARANAO C. CASAN
Project Engineer
lot
md
md
set
cum
kg
cum
kg
Kind of Materials
Sampled at
Original Source
Sampled by
Tested by
Computed by
Laboratory No.
Dry Unit Weight
LESifag-1
Loose
Rodded
Weight
Retained
g.
Percentage
Retained
3"
2 1/2"
2"
1 1/2"
1"
3/4"
1/2"
3/8"
1/4"
#4
27
#8
97
# 10
# 16
86
# 30
76
# 40
# 50
157
# 60
# 100
70
# 200
22
Pan
2
Wash
Passing
3
# 200
TOTAL
540
RECOMMENDATION
Prepared by:
ALDWIN JOHN M. BAYAMBAN
Materials Engineer I
07/29/14
07/30/14
(Date)
-do(Date)
Moisture Content %
Fineness Modulus
Sieve
Size
405
75 cum
CUMULATIVE
Wt. Passing
Percent
g.
Passing
586
543
540
Percent
Retained
Governing
Spec's
Passing
540
100
100
513
416
95
77
5
23
95 - 100
329
254
61
47
39
53
45 - 80
97
18
82
5 - 30
27
5
5
1
95
0 - 10
3 max
FM
2.97
Satisfactory
Checked by:
MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section
Remarks
Kind of Materials
Sampled at
Original Source
Sampled by
Tested by
Computed by
Laboratory No.
Dry Unit Weight
LESfa-g
Loose
Rodded
Moisture Content %
Fineness Modulus
Sieve
Size
Weight
Retained
g.
3"
2 1/2"
2"
1 1/2"
1"
3/4"
1/2"
3/8"
1/4"
#4
#8
# 10
# 16
# 30
# 40
# 50
# 60
# 100
# 200
Pan
Wash
Passing
# 200
TOTAL
RECOMMENDATION
Percentage
Retained
CUMULATIVE
Wt. Passing
Percent
g.
Passing
Percent
Retained
5124
5104
5086
Governing
Spec's
Passing
102
5098
4996
100
98
100
95 - 100
2090
2906
57
35 - 70
1427
1478
29
10 - 30
1275
204
0-5
102
102
76
7
25
0.5
1 max
18
5098
Prepared by:
Satisfactory
Checked by:
MELCHOR A. BALQUEDRA
Engineer II
Remarks
07/29/14
(Date)
07/30/14
(Date)
Lab. No.
LESq-1
A. SPECIFIC GRAVITY & ABSORPTION
COARSE AGGREGATES
1 Weight in air of saturated surface dry sample, kg.
2 Weight in air of oven dried sample, kg.
3 Weight of sample in water, kg.
Absorption
(1) - (2) / (2) x 100
Specific Gravity, bulk, SSD,
(1) / (1) - (3)
8.865
8.709
5.581
1.791
2.699
FINE AGGREGATES
1
2
3
4
0.5000
0.4881
0.6674
0.9781
2.4380
2.6413
B. UNIT WEIGHT
LOOSE
RODDED
COARSE AGGREGATES:
1
2
3
4
26.765
5.810
20.955
0.015
1397.0
28.331
5.810
22.521
0.015
1501.4
7.179
2.625
4.554
0.003250
1401.2
7.515
2.631
4.884
0.003250
1502.8
FINE AGGREGATES:
1
2
3
4
REMARKS/RECOMMENDATIONS:
Prepared by:
Checked by:
ALDWIN JOHN M. BAYAMBAN
Materials Engineer I
MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section
Coarse Aggregate
Manufactured
Fineness Modulus
Specific Gravity (SSD)
Moisture Content, %
Absorption, %
Unit wt., Kg./cu.m. (loose)
Sp. Gravity of Cement
Admixture brand
Type & Brand of Cement
Natural
/
2.970
2.641
6.0
2.438
1401.2
3.09
None
Rounded
/
Maximum size, mm
Abrasion loose, %
Specific Gravity (SSD)
Absorption, %
Unit wt., Kg./cu.m. (loose)
Water Source
Moisture Content %
A
3000 psi
1 1/2"
2.699
1.791
1397.0
4.0
9.1
3"
Total Aggregate
1
CF
40
3.13 x 1000
166
CF x 1000
Cement
Fine Aggregates
Coarse Aggregates
Water
Angular
Specific
Gravity
3.090
2.641
2.699
1.000
0.110
0.013
(From Table V)
0.018
0.031
0.079
(From Table V)
(From Table of Adjustments)
0.028
0.051
Unit Wt.
of water
kg/m3
1000
1000
1000
1000
Uncorrected
Weights *
kg.
39
74.909
136.564
18.242
Corrected
Weights ***
kg.
39
77.576
139.582
12.472
REMARKS/RECOMMENDATIONS:
Tested by:
Submitted by:
ALDWIN JOHN M. BAYAMBAN
Materials Engineer I
Checked by:
DAGARANAO C. CASAN
Project Engineer
Approved by:
MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section
:
:
:
:
:
:
:
:
:
:
Submitted by
LAB.
NO.
SAMPLE
IDENTIFICATION
BRILLANTES CONSTRUCTION
7/29/2014
(Office)
(Date)
BRILLANTES CONSTRUCTION
7/30/2014
(Office)
(Date) (Rec'd)
TESTS
REQUIREMENTS
Dimension Measurement, mm
Width
Length
Weight
101.6
406.4
A
B
C
26,800
26,200
26,200
Pounds
59,094.00
57,771.00
57,771.00
RESULTS
101.5
406.5
600 615.56
600 601.78
600 601.78
PSI
615.56
601.78
601.78
REMARKS: Passed
Tested by:
Certified Correct:
LITO C. COLLADO
LT II
Quality Assurance Section
Witnessed by:
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section
NOEL R. OCLARIT
District Engineer
Report
Type of Specimen
Spec's Item. No.
Class
Source of mixture
Sampled by
:
:
:
:
:
:
:
Submitted by
LAB.
NO.
SAMPLE
IDENTIFICATION
1 900Bccs-1
2 900Bccs-2
3 900Bccs-3
Reading
1
2
3
41,200
40,000
40,800
BRILLANTES CONSTRUCTION
08/06/14
(Office)
(Office)
(Date)
A.R. & MARK BUILDERS
09/03/14
(Office)
(Date) (Rec'd)
PART OF STRUCTURE
OR
STATION REPRESENTED
DATE
SAMPLED
AGE
IN
DAYS
8/6/2014
8/6/2014
8/6/2014
28
28
28
Pounds
90,640
88,000
89,760
Average
PSI
3,202.83
3,109.54
3,171.73
3,161.37
STRENGTH, Mpa
FLEXURAL
COMPRESSIVE
22.09
21.45
21.87
Mpa
22.09
21.45
21.87
21.80
REMARKS: Passed
Tested by:
Certified Correct:
LITO C. COLLADO
LT II
Quality Assurance Section
Checked by:
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section
NOEL R. OCLARIT
District Engineer
Project
Kind of Materials
Sampled at
Original Source
Sampled by
Tested by
Computed by
Laboratory No.
Dry Unit Weight
Moisture Content %
Fineness Modulus
Sieve
Weight
Size
Retained
g.
3"
2 1/2"
2"
1 1/2"
600
1"
325
3/4"
1/2"
400
3/8"
1/4"
# 4
625
# 8
# 10
150
# 16
# 30
# 40
150
# 50
# 60
# 100
# 200
50
Pan
8
Wash
Passing
# 200
192
TOTAL
2498
RECOMMENDATION
Percentage CUMULATIVE
Retained Wt. Passing
g.
Percent
Passing
2498
1898
1574
100
76
63
1174
47
550
22
400
16
250
10
200
Percent
Retained
Governing
Spec's
Passing
2542
2512
2320
Remarks
Satisfactory
Prepared by:
Checked
JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
by:
LALENE G. FERNANDEZ
Engineer II
BRILLANTES CONSTRUCTION
Laboratory No.
Dry Unit Weight
Moisture Content %
Fineness Modulus
Sieve
Weight
Size
Retained
g.
3"
2 1/2"
2"
1 1/2"
1172
1"
713
3/4"
1/2"
3/8"
611
1/4"
# 4
1070
# 8
# 10
611
# 16
# 30
# 40
408
# 50
# 60
# 100
# 200
51
Pan
9
Wash
Passing
# 200
450
TOTAL
5095
RECOMMENDATION
Percentage CUMULATIVE
Retained Wt. Passing
g.
Percent
Passing
Percent
Retained
5112
5106
4656
Governing
Spec's
Passing
5095
3923
3210
100
77
63
55 - 85
2598
51
40 - 75
1529
30
917
18
510
10
459
Satisfactory
100
0 - 12
Remarks
Prepared by:
Checked
JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION
by:
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section
Sampled at
Original Source
Proposed Use
Sampled by
Tested by
Computed by
Laboratory No.
104p-1
Determination Number
Container Number
Container & Wet Soil, g.
Container & Dry Soil, g.
Moisture Loss, g
Container, g.
Dry Soil, g.
Moisture Content, %
Number of Blows
1
B - 11
97.6
90.8
6.8
67.3
23.5
29.1
35.0
LIQUID LIMIT
2
3
B - 12
A - 26
98.5
101.9
91.2
93.7
7.3
8.2
66.4
66.9
24.8
26.8
29.6
30.5
28.0
18.0
4
A - 24
103.9
95.0
8.9
67.1
27.9
31.9
10.0
PLASTIC LIMIT
1
B -12
77.2
75.4
1.8
66.1
9.3
19.1
Average
FLOW CURVE
SIEVE ANALYSIS
Sieve Size % Passing
# 10
# 40
# 200
35
33
31.9
31
30.5
29
29.6
29.1
27
25
10
100
NUM BER OF BLOWS
Liquid Limit
Plastic Limit
Plasticity Index
Group Index
Group Classification
RECOMMENDATION
Prepared by:
Checked
by:
JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section
(Name)
(City/Province)
Jobsite
Qnty. Represented
(Giver accurate location possible)
-doSubgrade preparation
Spec's Item No.
(Pit, Quarry, River ,etc. & Location)
Sampled at
Original Source
Proposed Use
Sampled by
J. Gargar
Foreman
(Name & Designation)
J. Gargar Foreman
(Name & Designation)
J. Limocon ME I
Tested by
Computed by
Brillantes Construction
(Office)
-do(Office)
-do-
510BCg-1
Determination Number
Container Number
Container & Wet Soil, g.
Container & Dry Soil, g.
Moisture Loss, g
Container, g.
Dry Soil, g.
Moisture Content, %
Number of Blows
% M OIST URE C ONT ENT
(Office)
LIQUID LIMIT
2
3
A - 26
B - 11
50.1
50.6
42.9
42.9
7.2
7.7
18.0
17.5
24.9
25.4
29.0
30.4
31.0
19.0
1
0.0
31.4
24.5
6.9
0.0
24.5
28.3
38.0
4
0.0
36.9
27.9
9.0
0.0
27.9
32.1
10.0
PLASTIC LIMIT
1
A - 27
28.2
26.6
1.6
17.3
9.3
17.4
Average
FLOW CURVE
SIEVE ANALYSIS
Sieve Size % Passing
# 10
# 40
# 200
35
32.3
30
30.7
29.6
29.1
25
20
10
100
NUM BER OF BLOWS
Liquid Limit
Plastic Limit
Plasticity Index
Group Index
Group Classification
20
10
100
NUM BER OF BLOWS
RECOMMENDATION
Prepared by:
JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION
Checked
by:
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section
ity/Province)
77 cum
104
02/15/14
(Date)
02/16/14
(Date)
-do(Date)
PLASTIC LIMIT
2
A - 27
79.3
77.4
1.9
67.7
9.7
19.5
19.3
16
10
8
30
19
11
0
A-2-4
35
12
-27
0.15
-4.05
-0.07
-4.12
ity/Province)
44 cum
200
02/15/14
(Date)
02/16/14
(Date)
-do-
(Date)
PLASTIC LIMIT
2
B -12
28.5
26.9
1.6
17.7
9.2
17.2
17.3
17
9
7
30
19
11
0
A-2-4
35
12
-28
0.15
-4.2
-0.08
-4.28
Laboratory No.
A
B
METHOD
/
C
/
D
104
77 cum
02/15/14
(Date)
02/16/14
(Date)
02/16/14
(Date)
104BCc-1
/
/
RAMMER
2.5
/
4.5
/
/
x /
TRIAL NUMBER
WATER ADDED in ml.
Weight MOLD + WET SOIL
in
MOLD
kg
WET SOIL
WET DENSITY, kg/cum
CONTAINER #
CONT. + WET SOIL
Weight
CONT. + DRY SOIL
in
WATER
gram
CONTAINER
DRY SOIL
% MOISTURE CONTENT
DRY DENSITY,kg/cum
LAYER NO.
3
/
5
/ x
1
140
6.324
4.339
1.985
2106.7
BH-4
647.1
614.3
32.8
102.3
512.0
6.4
1980
2000
NO. OF BLOWS
25
/
/
56
/ x
2
VOLUME OF MOLD
0.000942
/
/
0.002125
/ x /
3
4
140
140
140
6.340
6.365
6.406
4.339
4.339
4.339
2.001
2.026
2.067
2124.6
2150.6
2194.0
C
B2
A
669.2
651.9
702.4
632.8
611.0
649.8
36.4
40.9
52.6
112.5
100.1
123.5
520.3
510.9
526.3
7.0
8.0
10.0
1985.6
1991.3
1994.5
MAXIMUM DRY DENSITY
OPTIMUM MOISTURE CONTENT
REMARKS
Satisfactory
5
140
6.423
4.339
2.084
2212.6
B9
704.6
644.5
60.1
112.2
532.3
11.3
1988
Prepared by:
1995
JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION
1990
1985
Checked
by:
1980
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section
1975
1970
5.0
10.0
15.0
1980
1975
1970
5.0
10.0
15.0
/
/
/ x /
58, 6/3/16)
6
140
7.439
5.339
2.100
2229.8
B4
717.6
650.6
67.0
114.5
536.1
12.5
1982
1994
9.5
BH-4
102.3
Laboratory No.
104
10 cm
0
(Layer No.)
(Depth)
(Station to Station)
J. Gargar
Foreman
Brillantes Construction
(Name & Designation)
(Office)
J. Limocon
Materials Engineer
-do(Name & Designation)
(Office)
104d-6
11
12
13
14
15
16
17
7.7
6.142
1.558
FIELD DENSITY
Material taken from hole, kg
Mass of Jar + Sand, kg
Mass of Jar + Sand, kg (after pouring)
Sand to Fill Hole,kg (19-20-10)
Volume of Hole, cum (21/7)
Wet Unit + Weight, kg/cum (18/22)
Dry Unit Weight, kg/cum [23/(17/100 + 1)]
Laboratory Compaction Test Data
a. MDD, kg/cum
b. OMC, %
26 Degree of Compaction,% (24/25a x 100)
18
19
20
21
22
23
24
25
RECOMMENDATION
Satisfactory
1994
9.5
Prepared by:
Checked
JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION
by:
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section
(Width)
3/8/2013
(Date)
3/8/2013
(Date)
tent
627.2
581.4
45.8
67.0
514.4
8.9
9.0
4.447
7.241
2.694
2.989
0.002067
2152
1974
99
I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
as of
24-Sep
1 lot
0.5
1 lot
1,200 md
10 md
4 set
1200
10
4
cum
cum
cum
cum
36
28.35
37.91
121.78
363.14 sqm
363.14
36
28.35
37.91
202.97
9.14
611.97
11.89
2,114.39
9.7
2,768.59
17.3
3,060.79
35.32
1,486.04
cum
kg
cum
kg
cum
kg
cum
kg
cum
kg
9.14
611.97
11.89
2,114.39
3.88
1,107.44
14.71
2,601.67
207.16 sqm
93.22
19.2
14.4
30
1
4
sqm
sqm
sqm
lot
set
232.4
54
11.56
557.2
1
sqm
sqm
sqm
sqm
lot
14.13
594.42
92.96
21.6
250.74
344.84 sqm
395.34
3,163.59
4,579.49
203.02
sqm
kg
kg
kg
885.81
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Subtotal 1
2
Sag Rod
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets
I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
85.24 kg
341.08 kg
32 each
839.16 sqm
81.22 sqm
46.31 sqm
1
1
1
1
lot
lot
lot
lot
1 lot
0.5
1 lot
1,200 md
10 md
4 set
1200
10
4
cum
cum
cum
cum
36
28.35
37.91
101.49
363.14 sqm
363.14
36
28.35
37.91
202.97
9.14
611.97
11.89
2,114.39
9.7
2,768.59
17.3
3,060.79
35.32
1,486.04
cum
kg
cum
kg
cum
kg
cum
kg
cum
kg
8.23
550.77
10.7
1,902.95
3.88
1,107.44
12.11
2,142.55
207.16 sqm
93.22
19.2
14.4
30
1
4
sqm
sqm
sqm
lot
set
232.4
54
11.56
557.2
1
sqm
sqm
sqm
sqm
lot
12.36
520.11
69.72
16.2
222.88
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Subtotal 2
3
Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal Fu
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate
Sag Rod
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets
I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
344.84 sqm
395.34
3,163.59
4,579.49
203.02
85.24
341.08
32
sqm
kg
kg
kg
kg
kg
each
888.97
839.16 sqm
81.22 sqm
46.31 sqm
1
1
1
1
lot
lot
lot
lot
1 lot
1 lot
0.5
480 md
4 md
1 set
12.24
8.1
10.28
52.04
cum
cum
cum
cum
94.04 sqm
3.02
203.99
3.5
627.67
3.49
977.74
4.69
736.74
8.68
391.22
cum
kg
cum
kg
cum
kg
cum
kg
cum
kg
240
2
1
12.24
8.1
10.28
26.02
3.02
203.99
3.5
627.67
3.49
977.74
63.7 sqm
4.8
3.6
7.5
1
1
sqm
sqm
sqm
lot
set
47.8
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Subtotal 3
4
I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
58.1
13.5
5.78
162.34
1
sqm
sqm
sqm
sqm
lot
86.21 sqm
106.92
445.53
1,732.7
203.02
21.31
85.27
8
sqm
kg
kg
kg
kg
kg
each
258.33 sqm
21.58 sqm
20.39 sqm
1
1
1
1
lot
lot
lot
lot
1 lot
1 lot
720 md
6 md
2 set
20.16
14.85
19.49
102.35
cum
cum
cum
cum
183.74 sqm
5.06
339.98
6.3
1,123.24
5.56
1,574.69
8.68
1,466.08
17.96
756.16
cum
kg
cum
kg
cum
kg
cum
kg
cum
kg
111.52 sqm
0.5
1
240
2
1
12.24
8.1
10.28
26.02
3.02
203.99
3.5
627.67
3.49
977.74
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Subtotal 4
5
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal Fu
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate
Sag Rod
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets
I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
9.6
7.2
15
1
2
sqm
sqm
sqm
lot
set
116.2
27
5.78
293.96
1
sqm
sqm
sqm
sqm
lot
47.8
172.42 sqm
203.84
1,351.55
2,681.63
203.02
42.62
170.54
16
sqm
kg
kg
kg
kg
kg
each
451.94 sqm
41.46 sqm
29.03 sqm
1
1
1
1
lot
lot
lot
lot
1 lot
1 lot
960 md
8 md
3 set
0.5
1
28.08
21.6
28.7
152.66
cum
cum
cum
cum
273.44 sqm
7.1
475.97
9.09
1,618.81
7.63
2,171.64
12.67
cum
kg
cum
kg
cum
kg
cum
480
4
2
28.08
21.6
28.7
76.33
7.1
475.97
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
2,195.42 kg
26.64 cum
1,121.1 kg
9.09
1618.81
7.63
2171.64
159.34 sqm
14.4
10.8
22.5
1
3
sqm
sqm
sqm
lot
set
174.3
40.5
5.78
425.58
1
sqm
sqm
sqm
sqm
lot
119.505
258.63 sqm
299.98
2,257.57
3,630.56
203.02
63.93
255.81
24
sqm
kg
kg
kg
kg
kg
each
106.4
2257.57
645.55 sqm
61.34 sqm
37.67 sqm
255.81 kg
24 each
645.55
61.34
37.67
sqm
sqm
sqm
1
1
1
1
lot
lot
lot
lot
10
from
July 28 - October 25
from
October 25-Dec31
300
300
300
300
10
4
as of
31-Dec
0.5
1200
10
4
36
28.35
37.91
121.78
36
28.35
37.91
121.78
363.14
363.14
9.14
611.97
9.14
611.97
11.89
2114.39
3.88
1107.44
14.71
2601.67
14.13
594.42
11.9
2,114.39
3.88
1,107.44
14.71
2,601.67
14.13
594.42
33.22
60
93.22
October
1 - 7
October
8 - 15
October
16 - 21
October
22 - 30
0
0.7
0.7
0
0
0
0
0
0
0
81.19
40.19
0
0
0
0
0
0.0
5.82
1,661.15
2.59
459.12
41
5.82
1,661.15
2.59
459.12
20.37
885.58
113.94
20.37
885.58
40
30
23.94
5
7
15
0.4
0
92.96
21.6
92.96
21.6
250.74
250.74
139.44
32.4
0
306.46
0
39.44
15
344.84
885.81
395.34
885.81 2277.78
4579.49
203.02
500
579.49
85.24
341.08
32
839.16
81.22
46.31
0.4
0.4
0.4
0.4
0.5
1200
10
4
36
28.35
37.91
101.49
363.14
8.23
550.77
10.7
1,902.95
3.88
1,107.44
12.11
2,142.55
12.36
520.11
93.22
69.72
16.2
222.88
888.97
0.5
1
240
2
1
12.24
8.1
10.28
26.02
3.02
203.99
3.5
627.67
3.49
977.74
47.8
0.5
1
240
2
1
12.24
8.1
10.28
26.02
3.02
203.99
3.5
627.67
3.49
977.74
47.8
0.5
240
0.5
1
240
4
2
480
4
2
0.5
1
240
28.08
21.6
28.7
76.33
28.08
21.6
28.7
76.33
28.08
21.6
28.7
76.33
7.1
475.97
7.1
475.97
7.1
475.97
240
4
2
9.09
1618.81
25.505
7.63
2171.64
9.09
1618.81
7.63
2171.64
9.09
1618.81
47
47
119.505
56.4
50
106.4
2257.57
2257.57
2257.57
10
10
10
7.63
2171.64
25.505
47
47
56.4
50
November
1 - 7
November
8 - 15
November
16 - 21
November
22 - 30
December
1 - 7
December
8 - 15
December
16 - 21
December
22 - 30
0
0
0.7
0
0
0
0
0
0
0
0
81.19
0
0
0
0
0
0
0
5.82
1661.15
2.59
459.12
20.37
885.58
20
113.94
5
7
15
0.4
50
17.4
50
106.46
100
100
100
500
600
500
400
500
500
103.02
277.78
700
825
100
144.84
150
150
400
575
95.34
100
5
7
15
0.4
0
139.44
32.4
0
306.46
0
0
344.84
0
395.34
2277.78
4579.49
203.02
45.2
60
40
131.08
32
150
400
439.16
41.22
40
46.31
0.4
0.4
0.4
0.4
85.2
341.08
32
0
839.16
81.22
46.31
0
0.4
0.4
0.4
0.4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.5
0.5
1
240
240
4
2
240
28.08
21.6
28.7
76.33
28.08
21.6
28.7
76.33
7.1
475.97
7.1
475.97
240
4
2
9.09
1618.81
9.09
1618.81
7.63
2171.64
25.505
47
47
56.4
50
7.63
2171.64
25.505
47
47
56.4
50
2257.57
2257.57
10
10