QUALITY CONTROL PROGRAM

NAME OF PROJECT

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)

Limits

Lurugan

Location

Apprn/Contract Cost

Php3,551,144.68

Source

Lantapan
Bukidnon
2014 DepEd

A. Tests to be performed
ITEM NO.

I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)

DESCRIPTION

Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal
Furring)
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate
Sag Rod

UNITS

QTY

NUMBER OF TESTS
REQUIRED

1 lot
1 lot
1,200 md
10 md
4 set
36
28.35
37.91
202.97

cum
cum
cum
cum

363.14 sqm
9.14
611.97
11.89
2,114.39
9.7
2,768.59
17.3
3,060.79
35.32
1,486.04

cum
kg
cum
kg
cum
kg
cum
kg
cum
kg

207.16 sqm
19.2
14.4
30
1
4

sqm
sqm
sqm
lot
set

232.4
54
11.56
557.2
1

sqm
sqm
sqm
sqm
lot

344.84 sqm
395.34
3,163.59
4,579.49
203.02
85.24

sqm
kg
kg
kg
kg

PE Cert

PE Cert

CCS-5

Q-1 for #6 CHB

PE Cert

PE Cert

PE Cert

Q-1
Q-1 per size
Q-1 per size
Q-1 / PE Cert

Item 404(g)
SPL 905
XII.

Cross-Bracing
Turn Buckle
Painting Works

341.08 kg
32 each

Q-1 / PE Cert
Q-1 / PE Cert
Q-1 / PE Cert

Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102

Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets
a
b
c
d
e

839.16 sqm
81.22 sqm
46.31 sqm
1
1
1
1

Cement
Fine Aggregates
Coarse Aggregates
RSB (10,12, 16, 20 mm)
Water

Prepared by:

1,240
119
42
9,011

lot
lot
lot
lot

PE Cert

bags
cum
cum
kg
lit

Q-1
G-1, Q-1
GQ-1
Q-4 per size
PE Certificate

Checked by:

ALDWIN JOHN M. BAYAMBAN


Materials Engineer I

Submitted by:

PE Cert

MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section

Recommending Approval:

DAGARANAO C. CASAN
Project Engineer

RAMON B. MONTEMAYOR, JR.


Engineer II
Acting Chief, Quality Assurance Section

Approved by:
NOEL R. OCLARIT
District Engineer

PROGRESS REPORT
August 2014
(Month & Year)

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)
(Name)
(Location)

Project

Php 3,551,144.68

A.R. & MARK BUILDERS

Contract Amount & Source of Fund

Contractor

Quality Control Activity

A.

Sampling (Number & Kind) to Central/Regional Laboratory

B.

Tests done in Regional or Project Laboratory (Kind & Item No.)


Q-1, 10mm RSB
Q-1, 12mm RSB
Q-1, 16mm RSB
Q-1, 20mm RSB
Q-1, Cement

C.

Inspection
Continuous quality control inspection on all Items of Work were undertaken as
construction progresses particularly on critical activities.

Quality Control Work accomplishment (%)


0%
(Current Month)

Prepared by:

26%
(Total to Date)

Checked by:

ALDWIN JOHN M. BAYAMBAN


Materials Engineer I

MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section
Submitted by:

DAGARANAO C. CASAN
Project Engineer

STATUS REPORT
October 2014
Date
Project:

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)

Our record indicates thet the status of test of the above-named project for this month is as follows:
ITEM

I.
SPL-5
II.
A.1.1
III.
SPL-1
SPL-2
SPL-3
IV.
803
804(a)
804(b)
804(c)
V.
1000(a)
VI.
900(a)
404(a)
900(b)
404(b)
900(c)
404(c)
900(d)
404(d)
900(e)
404(e)
VII.
506(1)A
VIII.
1010(b)
1005
1010(1)
1010(a)
SPL-4
IX.
1021(c)
1021(c-1)
1021(c-2)
1027(a)
SPL-5
X.
1003

Total Estimated
Quantities

Minimum Number
of Test Required

Number of
Test On File

Test
Balance

% of Test
Accomp

Mobilization/Demobilization

Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Exc. of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling w/ Insulation
(Use Fiber Cement Board & Metal Furring)
XI.
Roof Framing Works
1013
Pre-Painted Metal Sheets
403(a)
Steel Trusses
403(b)
Purlins and Channel Beam
403(c)
Angular Base Plate
404(f)
Sag Rod
404(g)
Cross-Bracing
SPL 905 Turn Buckle
XII.
Painting Works
1032(a-1) Masonry Painting
1032(a-2) Wooden Painting
1032(a-3) Steel Painting

1 lot
1 lot
720
6
2
156.85
20.16
14.85
19.49
102.35

md
md
set
cum
cum
cum
cum

183.74 sqm
5.06
339.98
6.3
1,123.24
5.56
1,574.69
8.68
1,466.08
17.96
756.16

cum
kg
cum
kg
cum
kg
cum
kg
cum
kg

111.52 sqm
sqm
sqm
9.6 sqm
7.2 sqm
15 lot
1 set
2
sqm
116.2 sqm
27 sqm
5.78 sqm
293.96 lot
1
sqm
172.42

PE Cert

PE Cert

PE Cert

CCS-5

CCS-1

Q-1 for #6CHB

Q-1 for #6CHB

PE Cert

1%

PE Cert

0%

CCS-4

20%

100%

PE Cert

PE Cert

0%

PE Cert

PE Cert

0%

PE Cert

PE Cert

0%

Q-1

Q-1

Q-1 per size

Q-1 per size

Q-1 per size

Q-1 per size

Q-1 / PE Cert

Q-1 / PE Cert

PE Cert

PE Cert

0%

203.84
1,351.55
2,681.63
203.02
42.62
170.54
16

sqm
kg
kg
kg
kg
kg
each

451.94 sqm
41.46 sqm
29.03 sqm

0%

XIII.
1100
1101
1102(a)
1102

Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets
a Cement
b Fine Aggregates
c Coarse Aggregates
d RSB (10,12, 16, 20 mm)
e Water

Prepared by:

1
1
1
1

lot
lot
lot
lot

450 bags
50 cum
25 cum
5,525 kg
lit

PE Cert

PE Cert

Q-1
GQ-1

Q-1
GQ-1

GQ-1
Q-4 per size

GQ-1

PE Cert

PE Cert

Q-1

0%
100%
100%

Q-4 per size

Checked by:
ALDWIN JOHN M. BAYAMBAN
Materials Engineer I

0%

MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section

Submitted by:

DAGARANAO C. CASAN
Project Engineer

0%
100%

SUMMARY OF REPORT
Name of Project and Location

August 2014
For the month of
1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY
(School ID: 126847)

Name of Contractor A.R. & MARK BUILD


DPWH Project Inspector
Project Accomplishment 26%
Project Cost

Implementing Office
Project Duration

3,551,144.68

Bukidnon 1st Engineering District

a) Date Started

July 28, 2014

b) Target Completion D October 26, 2014


Laboratory

Kind of MaterialsQuantity Represented Original Source

Number
BCSBifa-1
BCSBica-1
BCSBiq-1
BCSBichb-1

Kind of Test

of Materials
Fine Aggregates
Coarse Aggregates
Quality Tests, Agg
#6CHB

75 cum
75 cum
1500 cum
10,000 pcs

Pulangi River
Pulangi River
Pulangi River
Jobsite

Spec's

Sampled

Item No.
Sieve Analysis
Sieve Analysis
Quality Test
Strength Test

405
405
405
704

By
J.
J.
J.
J.

Gargar
Gargar
Gargar
Gargar

Tested

Date

By

07/29/14
07/29/14
07/29/14
07/29/14

J.
J.
J.
J.

Gargar
Gargar
Gargar
Gargar

Date
07/30/14
07/30/14
07/30/14
07/30/14

900SBiccs- CCS
3.02 cum
Column Footing & WF Compressive
405
J. Gargar 08/06/14 J. Gargar 09/03/14
Notes 1. Indicate the name of batching plant as source of ready-mix concrete and hot-bituminous mix to column (4)
2. Indicate the name of testing laboratories on the sample tested to Column (11)
Prepared by:

Checked by:

Attested by:

JERSON H. LIMOCON
Brillantes Construction, ME

MELCHOR A. BALQUEDRA
Engineer II

RAMON B. MONTEMAYOR, JR.


Engineer II

ME I # 0558

Quality Assurance Section

Acting Chief, Quality Assurance Section

Submitted by:

DAGARANAO C. CASAN
Project Engineer

A.R. & MARK BUILDERS

3,551,144.68

Tested

REMARKS

at
Jobsite
Jobsite
Jobsite
DPWH, Mly

Passed
Passed
Passed
Passed

Jobsite Passed

DAGARANAO C. CASAN
Project Engineer

Republic of the Philippines


Department of Public Works and Highways
Region X
Bukidnon 1st District Engineering District
Malaybalay City

September 7, 2014
(Date)
CERTIFICATION OF QUALITY CONTROL ASSURANCE
Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)

Contractor

: A.R. & MARK BUILDERS

We hereby certify that we have conducted an inspection and verification on work


accomplished on the above-mentioned project for the period
September
1 - 7, 2014
We further certify that we have found that the quality of materials in the following items of work
corresponding to the quantity accomplished conforms with the Standard Specifications and
Special Provisions of the Contract, viz:

ITEM NO.

Item SPL-1
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
Item 1000(a)
Item 900(a)
Item 404(a)

DESCRIPTION

Personal Protective Equipment (PPE)


Excavation of Column Footing, Wall Footing & SW Footi
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Soil Poisoning
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF

RAMON B. MONTEMAYOR, JR.


Acting Chief, Quality Assurance Section

NOTE:
To be submitted every quarter of the month.
1st report
2nd report
3rd report
4th report

QUANTITY
ACCOMPLISHED

300
36
28.35
37.91
121.78
363.14
9.14
611.97

DAGARANAO C. CASAN
Project Engineer

md
cum
cum
cum
cum
sqm
cum
kg

Republic of the Philippines


Department of Public Works and Highways
Region X
Bukidnon 1st District Engineering District
Malaybalay City

September 15, 2014


(Date)
CERTIFICATION OF QUALITY CONTROL ASSURANCE
Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)

Contractor

: A.R. & MARK BUILDERS

We hereby certify that we have conducted an inspection and verification on work


accomplished on the above-mentioned project for the period
September
8 - 15, 2014
We further certify that we have found that the quality of materials in the following items of work
corresponding to the quantity accomplished conforms with the Standard Specifications and
Special Provisions of the Contract, viz:

ITEM NO.

Item SPL-1
Item 900(b)
Item 404(b)
Item 506(1)A

DESCRIPTION

Personal Protective Equipment (PPE)


R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
Masonry Units

RAMON B. MONTEMAYOR, JR.


Acting Chief, Quality Assurance Section

NOTE:
To be submitted every quarter of the month.
1st report
2nd report
3rd report
4th report

QUANTITY
ACCOMPLISHED
300
11.89
2114.39
33.22

DAGARANAO C. CASAN
Project Engineer

md
cum
kg
sqm

Republic of the Philippines


Department of Public Works and Highways
Region X
Bukidnon 1st District Engineering District
Malaybalay City

September 22, 2014


(Date)
CERTIFICATION OF QUALITY CONTROL ASSURANCE
Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)

Contractor

: A.R. & MARK BUILDERS

We hereby certify that we have conducted an inspection and verification on work


accomplished on the above-mentioned project for the period
September
16 - 22, 2014
We further certify that we have found that the quality of materials in the following items of work
corresponding to the quantity accomplished conforms with the Standard Specifications and
Special Provisions of the Contract, viz:

ITEM NO.

Item SPL-1
Item 900(c)
Item 404(c)
Item 506(1)A
Item 1021(c)
Item 1021(c-1)
Item 1027(a)
Item 403(a)

DESCRIPTION

Personal Protective Equipment (PPE)


R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
Masonry Units
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Plain Cement Plaster Finish
Steel Trusses

RAMON B. MONTEMAYOR, JR.


Acting Chief, Quality Assurance Section

NOTE:
To be submitted every quarter of the month.
1st report
2nd report
3rd report
4th report

QUANTITY
ACCOMPLISHED

300
3.88
1107.44
60
92.96
21.6
250.74
885.81

DAGARANAO C. CASAN
Project Engineer

md
cum
kg
sqm
sqm
sqm
sqm
kg

Republic of the Philippines


Department of Public Works and Highways
Region X
Bukidnon 1st District Engineering District
Malaybalay City

September 30, 2014


(Date)
CERTIFICATION OF QUALITY CONTROL ASSURANCE
Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)

Contractor

: A.R. & MARK BUILDERS

We hereby certify that we have conducted an inspection and verification on work


accomplished on the above-mentioned project for the period
September
23-31, 2014
We further certify that we have found that the quality of materials in the following items of work
corresponding to the quantity accomplished conforms with the Standard Specifications and
Special Provisions of the Contract, viz:

ITEM NO.

Item SPL-6
Item SPL-1
Item SPL-2
Item SPL-3
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)

DESCRIPTION

Mobilization/Demobilization
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp

RAMON B. MONTEMAYOR, JR.


Acting Chief, Quality Assurance Section

NOTE:
To be submitted every quarter of the month.
1st report
2nd report
3rd report
4th report

QUANTITY
ACCOMPLISHED
0.50
300
10
4
14.71
2,601.67
14.13
594.42

DAGARANAO C. CASAN
Project Engineer

lot
md
md
set
cum
kg
cum
kg

WORKSHEET FOR SIEVE ANALYSIS


Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
Fine Aggregates
Spec's Item No.
Jobsite
Qnty. Represented
Pulangi River, Valencia City
(Pit, Quarry, River ,etc. & Location)
A. Bayanban
ME I
AR&MARK BUILDERS
(Name & Designation)
A. Bayanban
ME I
-do(Name & Designation)
A. Bayanban
ME I
-do(Name & Designation)
(Office)

Kind of Materials
Sampled at
Original Source
Sampled by
Tested by
Computed by

Laboratory No.
Dry Unit Weight

LESifag-1
Loose
Rodded

Weight
Retained
g.

Percentage
Retained

3"
2 1/2"
2"
1 1/2"
1"
3/4"
1/2"
3/8"
1/4"
#4
27
#8
97
# 10
# 16
86
# 30
76
# 40
# 50
157
# 60
# 100
70
# 200
22
Pan
2
Wash
Passing
3
# 200
TOTAL
540
RECOMMENDATION
Prepared by:
ALDWIN JOHN M. BAYAMBAN
Materials Engineer I

07/29/14
07/30/14
(Date)
-do(Date)

Weight of Sample in Grams


Original Weight
Oven Dry Weight
Wash Oven Dry Weight

Moisture Content %
Fineness Modulus
Sieve
Size

405
75 cum

CUMULATIVE
Wt. Passing
Percent
g.
Passing

586
543
540

Percent
Retained

Governing
Spec's
Passing

540

100

100

513
416

95
77

5
23

95 - 100

329
254

61
47

39
53

45 - 80

97

18

82

5 - 30

27
5

5
1

95

0 - 10
3 max

FM

2.97

Satisfactory
Checked by:
MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section

Remarks

WORKSHEET FOR SIEVE ANALYSIS


Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
Coarse Aggregates
Spec's Item No.
405 A
Jobsite
Qnty. Represented
75 cum
Pulangi River, Valencia City
(Pit, Quarry, River ,etc. & Location)
A. Bayanban
ME I
AR&MARK BUILDERS
07/29/14
(Name & Designation)
A. Bayanban
ME I
-do07/30/14
(Name & Designation)
(Date)
A. Bayanban
ME I
-do-do(Name & Designation)
(Office)
(Date)

Kind of Materials
Sampled at
Original Source
Sampled by
Tested by
Computed by

Laboratory No.
Dry Unit Weight

LESfa-g
Loose
Rodded

Weight of Sample in Grams


Original Weight
Oven Dry Weight
Wash Oven Dry Weight

Moisture Content %
Fineness Modulus
Sieve
Size

Weight
Retained
g.

3"
2 1/2"
2"
1 1/2"
1"
3/4"
1/2"
3/8"
1/4"
#4
#8
# 10
# 16
# 30
# 40
# 50
# 60
# 100
# 200
Pan
Wash
Passing
# 200
TOTAL
RECOMMENDATION

Percentage
Retained

CUMULATIVE
Wt. Passing
Percent
g.
Passing

Percent
Retained

5124
5104
5086

Governing
Spec's
Passing

102

5098
4996

100
98

100
95 - 100

2090

2906

57

35 - 70

1427

1478

29

10 - 30

1275

204

0-5

102

102

76
7

25

0.5

1 max

18
5098

Prepared by:

Satisfactory
Checked by:

ALDWIN JOHN M. BAYAMBAN


Materials Engineer I

MELCHOR A. BALQUEDRA
Engineer II

Remarks

Quality Assurance Section

WORKSHEET FOR SPECIFIED GRAVITY ABSORPTION & UNIT WEIGHT


Project
Tested by
Computed by

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
A. Bayanban
ME I
AR&MARK BUILDERS
(Name & Designation)
(Office)
A. Bayanban
ME I
-do(Name & Designation)
(Office)

07/29/14
(Date)
07/30/14
(Date)

Lab. No.
LESq-1
A. SPECIFIC GRAVITY & ABSORPTION
COARSE AGGREGATES
1 Weight in air of saturated surface dry sample, kg.
2 Weight in air of oven dried sample, kg.
3 Weight of sample in water, kg.
Absorption
(1) - (2) / (2) x 100
Specific Gravity, bulk, SSD,
(1) / (1) - (3)

8.865
8.709
5.581
1.791
2.699

FINE AGGREGATES
1
2
3
4

Weight in air of saturated surface dry sample, kg.


Weight in air of oven dried sample, kg.
Weight of pychometer bottle filled with water, kg.
Pychnometer bottle + water + sample in bottle, kg.
Absorption
(1) - (2) / (2) x 100
Specific Gravity, bulk, SSD
(1) / (1) + (3) - (4)

0.5000
0.4881
0.6674
0.9781
2.4380
2.6413

B. UNIT WEIGHT
LOOSE

RODDED

COARSE AGGREGATES:
1
2
3
4

Container + Sample, kg.


Container, kg.
Sample, kg. (1) - (2)
Volume of Container, m3
Unit Weight/Mass (kg/m3) (3)/(4)

26.765
5.810
20.955
0.015
1397.0

28.331
5.810
22.521
0.015
1501.4

7.179
2.625
4.554
0.003250
1401.2

7.515
2.631
4.884
0.003250
1502.8

FINE AGGREGATES:
1
2
3
4

Container + Sample, kg.


Container, kg.
Sample, kg. (1) - (2)
Volume of Container, m3
Unit Weight/Mass (kg/m3) (3)/(4)

REMARKS/RECOMMENDATIONS:
Prepared by:

Checked by:
ALDWIN JOHN M. BAYAMBAN
Materials Engineer I

MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section

WORKSHEET FOR CONCRETE DESIGN MIX


Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
Prepared by
A. Bayanban
ME
AR&MARK BUILDERS
(Name & Designation)
(Office)
(Date)
Data from Preliminary Tests
Fine Aggregate

July 30, 2014

Coarse Aggregate

Manufactured
Fineness Modulus
Specific Gravity (SSD)
Moisture Content, %
Absorption, %
Unit wt., Kg./cu.m. (loose)
Sp. Gravity of Cement
Admixture brand
Type & Brand of Cement

Natural

Design Specification Requirements


Class of Concrete
Compressive Strength, MPa
Proportion of Cement to
Total Aggregate, parts by weight:
Cement

/
2.970
2.641
6.0
2.438
1401.2
3.09
None

Rounded
/
Maximum size, mm
Abrasion loose, %
Specific Gravity (SSD)
Absorption, %
Unit wt., Kg./cu.m. (loose)
Water Source
Moisture Content %

A
3000 psi

Cement Factor, bags/cu.m.


Slump, mm

1 1/2"
2.699
1.791
1397.0
4.0

9.1
3"

Total Aggregate

Design Mix per Bag of Cement:


1) Absolute Volume of Concrete, cu.m

1
CF
40
3.13 x 1000
166
CF x 1000

2) Absolute Volume of 40.0 kg/bag of


cement,cu.m.
3) Absolute Volume of Water, cu.m.
4) Absolute Volume of Water and Cement, cu.m., (2) + (3)
5) Absolute Volume of fine and coarse aggregates, cu.m., (1) - (4)
5a) Correction of fine aggregate, % of total agg. by absolute volume
Fine Aggregate
37
Total Correction
-1.08
Corr. Fine Aggregates
35.92
6) Absolute Volume of Fine Aggregates, cu.m., (5) x (5a)
7) Absolute Volume of Coarse Aggregate, cu.m., (5) - (6)
Absolute
Volume
m3
0.013
0.028
0.051
0.018

Cement
Fine Aggregates
Coarse Aggregates
Water

Angular

Specific
Gravity
3.090
2.641
2.699
1.000

0.110
0.013
(From Table V)

0.018
0.031
0.079

(From Table V)
(From Table of Adjustments)
0.028
0.051
Unit Wt.
of water
kg/m3
1000
1000
1000
1000

Uncorrected
Weights *
kg.
39
74.909
136.564
18.242

Corrected
Weights ***
kg.
39
77.576
139.582
12.472

REMARKS/RECOMMENDATIONS:
Tested by:

Submitted by:
ALDWIN JOHN M. BAYAMBAN
Materials Engineer I

Checked by:

DAGARANAO C. CASAN
Project Engineer
Approved by:

MELCHOR A. BALQUEDRA
Engineer II
Quality Assurance Section

RAMON B. MONTEMAYOR, JR.


Engineer II
Acting Chief, Quality Assurance Section

Republic of the Philippines


Department of Public Works and Highways
SOILS & MATERIALS QUALITY CONTROL SECTION
Region X
City of Malaybalay
TEST REPORT ON CONCRETE MASONRY PRODUCT
Report
Type of Unit
Quantity Represented
Sampled at
Original Source
Supplied by
Proposed Use
Spec's Item No.
Sampled by

:
:
:
:
:
:
:
:
:
:

Submitted by

LAB.
NO.

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)
Concrete Hollow Blocks #6
Malaybalay City
Jobsite
Jobsite
Walling
704
J. Gargar
(Name & Designation)
J. Gargar
(Name & Designation)

SAMPLE
IDENTIFICATION

BRILLANTES CONSTRUCTION
7/29/2014
(Office)
(Date)
BRILLANTES CONSTRUCTION
7/30/2014
(Office)
(Date) (Rec'd)

TESTS

REQUIREMENTS

Dimension Measurement, mm
Width
Length
Weight

101.6
406.4

Compressive Strength, psi


Individual Unit
1
2
3
Reading

A
B
C

26,800
26,200
26,200

Pounds

59,094.00
57,771.00
57,771.00

RESULTS

101.5
406.5

600 615.56
600 601.78
600 601.78
PSI

615.56
601.78
601.78

REMARKS: Passed
Tested by:

Certified Correct:
LITO C. COLLADO
LT II
Quality Assurance Section

Witnessed by:

RAMON B. MONTEMAYOR, JR.


Engineer II
Acting Chief, Quality Assurance Section
Attested by:

LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section

NOEL R. OCLARIT
District Engineer

Republic of the Philippines


Department of Public Works and Highways
SOILS & MATERIALS QUALITY CONTROL SECTION
Region X
City of Malaybalay
TEST REPORT ON CONCRETE SAMPLE

Report
Type of Specimen
Spec's Item. No.
Class
Source of mixture
Sampled by

:
:
:
:
:
:
:

Submitted by

LAB.
NO.

SAMPLE
IDENTIFICATION

1 900Bccs-1
2 900Bccs-2
3 900Bccs-3

Reading

1
2
3

41,200
40,000
40,800

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)
Concrete Cylinder Sample
405
A
Column Footing & WF
J. Gargar
(Name & Designation)
J. Gargar
(Name & Designation)

BRILLANTES CONSTRUCTION
08/06/14
(Office)
(Office)
(Date)
A.R. & MARK BUILDERS
09/03/14
(Office)
(Date) (Rec'd)

PART OF STRUCTURE
OR
STATION REPRESENTED

DATE
SAMPLED

AGE
IN
DAYS

Column Footing & WF


-do-do-

8/6/2014
8/6/2014
8/6/2014

28
28
28

Pounds

90,640
88,000
89,760
Average

PSI

3,202.83
3,109.54
3,171.73
3,161.37

STRENGTH, Mpa
FLEXURAL
COMPRESSIVE
22.09
21.45
21.87

Mpa

22.09
21.45
21.87
21.80

REMARKS: Passed
Tested by:

Certified Correct:

LITO C. COLLADO
LT II
Quality Assurance Section
Checked by:

RAMON B. MONTEMAYOR, JR.


Engineer II
Acting Chief, Quality Assurance Section
Attested by:

LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section

NOEL R. OCLARIT
District Engineer

WORKSHEET FOR SIEVE ANALYSIS

Project
Kind of Materials
Sampled at
Original Source
Sampled by
Tested by
Computed by

Laboratory No.
Dry Unit Weight
Moisture Content %
Fineness Modulus
Sieve
Weight
Size
Retained
g.
3"
2 1/2"
2"
1 1/2"
600
1"
325
3/4"
1/2"
400
3/8"
1/4"
# 4
625
# 8
# 10
150
# 16
# 30
# 40
150
# 50
# 60
# 100
# 200
50
Pan
8
Wash
Passing
# 200
192
TOTAL
2498
RECOMMENDATION

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
Brown Soil
Spec's Item No.
104
Jobsite
Qnty. Represented
77 cum
Pulangi River, Valencia City
(Pit, Quarry, River ,etc. & Location)
J. Gargar
Foreman
Brillantes Construction 02/15/14
(Name & Designation)
(Date)
J. Gargar
Foreman
-do02/16/14
(Name & Designation)
(Date)
J. Limocon
ME I
-do-do(Name & Designation)
(Office)
(Date)
104BCg-1
Loose
Rodded

Weight of Sample in Grams


Original Weight
Oven Dry Weight
Wash Oven Dry Weight

Percentage CUMULATIVE
Retained Wt. Passing
g.

Percent
Passing

2498
1898
1574

100
76
63

1174

47

550

22

400

16

250

10

200

Percent
Retained

Governing
Spec's
Passing

2542
2512
2320
Remarks

Satisfactory

Prepared by:

Checked
JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)

by:
LALENE G. FERNANDEZ
Engineer II

BRILLANTES CONSTRUCTION

Quality Assurance Section

WORKSHEET FOR SIEVE ANALYSIS


Project
Kind of Materials
Sampled at
Original Source
Sampled by
Tested by
Computed by

Laboratory No.
Dry Unit Weight
Moisture Content %
Fineness Modulus
Sieve
Weight
Size
Retained
g.
3"
2 1/2"
2"
1 1/2"
1172
1"
713
3/4"
1/2"
3/8"
611
1/4"
# 4
1070
# 8
# 10
611
# 16
# 30
# 40
408
# 50
# 60
# 100
# 200
51
Pan
9
Wash
Passing
# 200
450
TOTAL
5095
RECOMMENDATION

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
Sand & Gravel
Spec's Item No.
200
Jobsite
Qnty. Represented
44 cum
Pulangi River, Valencia City
(Pit, Quarry, River ,etc. & Location)
J. Gargar
Foreman
Brillantes Construction 01/28/14
(Name & Designation)
(Date)
J. Gargar
Foreman
-do01/29/14
(Name & Designation)
(Date)
J. Limocon
ME I
-do-do(Name & Designation)
(Office)
(Date)
510BCg-6
Loose
Rodded

Weight of Sample in Grams


Original Weight
Oven Dry Weight
Wash Oven Dry Weight

Percentage CUMULATIVE
Retained Wt. Passing
g.

Percent
Passing

Percent
Retained

5112
5106
4656

Governing
Spec's
Passing

5095
3923
3210

100
77
63

55 - 85

2598

51

40 - 75

1529

30

917

18

510

10

459

Satisfactory

100

0 - 12

Remarks

Prepared by:

Checked

JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION

by:
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section

WORKSHEET FOR LIQUID AND PLASTIC LIMIT TEST


Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
Jobsite
Qnty. Represented
(Giver accurate location possible)
Jobsite
Embankment
Spec's Item No.
(Pit, Quarry, River ,etc. & Location)
J. Gargar Foreman
Brillantes Construction
(Name & Designation)
(Office)
J. Gargar Foreman
-do(Name & Designation)
(Office)
J. Limocon ME I
-do(Name & Designation)
(Office)

Sampled at
Original Source
Proposed Use
Sampled by
Tested by
Computed by

Laboratory No.

104p-1

% M OIST URE C ONT ENT

Determination Number
Container Number
Container & Wet Soil, g.
Container & Dry Soil, g.
Moisture Loss, g
Container, g.
Dry Soil, g.
Moisture Content, %
Number of Blows

1
B - 11
97.6
90.8
6.8
67.3
23.5
29.1
35.0

LIQUID LIMIT
2
3
B - 12
A - 26
98.5
101.9
91.2
93.7
7.3
8.2
66.4
66.9
24.8
26.8
29.6
30.5
28.0
18.0

4
A - 24
103.9
95.0
8.9
67.1
27.9
31.9
10.0

PLASTIC LIMIT
1
B -12
77.2
75.4
1.8
66.1
9.3
19.1
Average

FLOW CURVE

SIEVE ANALYSIS
Sieve Size % Passing
# 10
# 40
# 200

35
33

31.9

31

30.5

29

29.6

29.1

27
25
10

100
NUM BER OF BLOWS

Liquid Limit
Plastic Limit
Plasticity Index
Group Index
Group Classification

RECOMMENDATION
Prepared by:

Checked

by:

JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION

LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section

WORKSHEET FOR LIQUID AND PLASTIC LIMIT TEST


Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY

(Name)
(City/Province)
Jobsite
Qnty. Represented
(Giver accurate location possible)
-doSubgrade preparation
Spec's Item No.
(Pit, Quarry, River ,etc. & Location)

Sampled at
Original Source
Proposed Use
Sampled by

J. Gargar

Foreman
(Name & Designation)
J. Gargar Foreman
(Name & Designation)
J. Limocon ME I

Tested by
Computed by

Brillantes Construction
(Office)
-do(Office)
-do-

(Name & Designation)


Laboratory No.

510BCg-1

Determination Number
Container Number
Container & Wet Soil, g.
Container & Dry Soil, g.
Moisture Loss, g
Container, g.
Dry Soil, g.
Moisture Content, %
Number of Blows
% M OIST URE C ONT ENT

(Office)

LIQUID LIMIT
2
3
A - 26
B - 11
50.1
50.6
42.9
42.9
7.2
7.7
18.0
17.5
24.9
25.4
29.0
30.4
31.0
19.0

1
0.0
31.4
24.5
6.9
0.0
24.5
28.3
38.0

4
0.0
36.9
27.9
9.0
0.0
27.9
32.1
10.0

PLASTIC LIMIT
1
A - 27
28.2
26.6
1.6
17.3
9.3
17.4
Average

FLOW CURVE

SIEVE ANALYSIS
Sieve Size % Passing
# 10
# 40
# 200

35
32.3
30

30.7

29.6

29.1

25
20
10

100
NUM BER OF BLOWS

Liquid Limit
Plastic Limit
Plasticity Index
Group Index
Group Classification

20
10

100
NUM BER OF BLOWS

RECOMMENDATION
Prepared by:
JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION

Checked

by:

LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section

ity/Province)
77 cum

104
02/15/14
(Date)
02/16/14
(Date)
-do(Date)

PLASTIC LIMIT
2
A - 27
79.3
77.4
1.9
67.7
9.7
19.5
19.3

16
10
8
30
19
11
0
A-2-4

35
12
-27

0.15
-4.05

-0.07
-4.12

ity/Province)
44 cum

200
02/15/14
(Date)
02/16/14
(Date)
-do-

(Date)

PLASTIC LIMIT
2
B -12
28.5
26.9
1.6
17.7
9.2
17.2
17.3

17
9
7
30
19
11
0
A-2-4

35
12
-28

0.15
-4.2

-0.08
-4.28

WORKSHEET FOR TEST OF MOISTURE DENSITY RELATIONS OF SOIL


Project
Kind of Materials
Sampled at
Original Source
Sampled by
Tested by
Computed by

Laboratory No.

A
B

METHOD
/
C
/
D

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
Brown Soil
Spec's Item No.
Jobsite
Qnty. Represented
Jobsite
(Pit, Quarry, River ,etc. & Location)
J. Gargar
Foreman
Brillantes Construction
(Name & Designation)
(Office)
J. Gargar
Foreman
-do(Name & Designation)
(Office)
J. Limocon
ME I
-do(Name & Designation)
(Office)

104
77 cum

02/15/14
(Date)
02/16/14
(Date)
02/16/14
(Date)

104BCc-1

/
/

RAMMER
2.5
/
4.5
/

/
x /

TRIAL NUMBER
WATER ADDED in ml.
Weight MOLD + WET SOIL
in
MOLD
kg
WET SOIL
WET DENSITY, kg/cum
CONTAINER #
CONT. + WET SOIL
Weight
CONT. + DRY SOIL
in
WATER
gram
CONTAINER
DRY SOIL
% MOISTURE CONTENT
DRY DENSITY,kg/cum

LAYER NO.
3
/
5
/ x
1
140
6.324
4.339
1.985
2106.7
BH-4
647.1
614.3
32.8
102.3
512.0
6.4
1980

2000

NO. OF BLOWS
25
/
/
56
/ x
2

VOLUME OF MOLD
0.000942
/
/
0.002125
/ x /

3
4
140
140
140
6.340
6.365
6.406
4.339
4.339
4.339
2.001
2.026
2.067
2124.6
2150.6
2194.0
C
B2
A
669.2
651.9
702.4
632.8
611.0
649.8
36.4
40.9
52.6
112.5
100.1
123.5
520.3
510.9
526.3
7.0
8.0
10.0
1985.6
1991.3
1994.5
MAXIMUM DRY DENSITY
OPTIMUM MOISTURE CONTENT
REMARKS
Satisfactory

5
140
6.423
4.339
2.084
2212.6
B9
704.6
644.5
60.1
112.2
532.3
11.3
1988

Prepared by:

1995

JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION

1990
1985
Checked

by:

1980
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section

1975
1970
5.0

10.0

15.0

1980
1975
1970
5.0

10.0

15.0

/
/
/ x /

58, 6/3/16)

6
140
7.439
5.339
2.100
2229.8
B4
717.6
650.6
67.0
114.5
536.1
12.5
1982
1994
9.5

BH-4
102.3

WORKSHEET FOR FIELD DENSITY TEST


Project

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(Name)
(City/Province)
Kind of Materials
Brown Soil
Spec's Item No.
Test Hole Depth
10 cm
Location
0
Representing
Tested by
Computed by

Laboratory No.

104

10 cm
0
(Layer No.)
(Depth)
(Station to Station)
J. Gargar
Foreman
Brillantes Construction
(Name & Designation)
(Office)
J. Limocon
Materials Engineer
-do(Name & Designation)
(Office)
104d-6

Unit Weight of Air-Dry Sand


Container full of water, kg
5.922
Container , kg
1.938
Water, kg (1-2)
3.984
Container, kg/cum (3/1000)
0.003984
Container filled with
Air-Dry Sand, kg
7.7
6 Air-Dry Sand, kg(5-2)
5.762
7 Unit Weight of
Air-Dry Sand, kg/cum (6/4)
1446.3
1
2
3
4
5

Mass of Sand to Fill Funnel


8 Mass of Jar + Sand, kg
9 Mass of Jar + Sand, kg
(after pouring)
10 Sand in Funnel, kg (8-9)

11
12
13
14
15
16
17

Actual Moisture Content


Container + Wet Soil, g
635.7
Container + Dry Soil, g
588.2
Moisture, g (11-12)
47.5
Container, g
66.0
###
Dry Soil, g (12-14)
522.2
% Moisture Content
9.1
Average % MC

7.7
6.142
1.558

FIELD DENSITY
Material taken from hole, kg
Mass of Jar + Sand, kg
Mass of Jar + Sand, kg (after pouring)
Sand to Fill Hole,kg (19-20-10)
Volume of Hole, cum (21/7)
Wet Unit + Weight, kg/cum (18/22)
Dry Unit Weight, kg/cum [23/(17/100 + 1)]
Laboratory Compaction Test Data
a. MDD, kg/cum
b. OMC, %
26 Degree of Compaction,% (24/25a x 100)
18
19
20
21
22
23
24
25

RECOMMENDATION

Satisfactory

1994
9.5

Prepared by:

Checked

JERSON H. LIMOCON
Materials Engineer I (#558, 6/3/16)
BRILLANTES CONSTRUCTION

by:
LALENE G. FERNANDEZ
Engineer II
Quality Assurance Section

(Width)
3/8/2013
(Date)
3/8/2013
(Date)

tent
627.2
581.4
45.8
67.0
514.4
8.9
9.0

4.447
7.241
2.694
2.989
0.002067
2152
1974

99

I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)

1-STOREY 4-CLASSROOM @ LURUGAN ES, VALENCIA CITY


(School ID: 126847)
Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal Fu
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate

as of
24-Sep

1 lot

0.5

1 lot
1,200 md
10 md
4 set

1200
10
4

cum
cum
cum
cum

36
28.35
37.91
121.78

363.14 sqm

363.14

36
28.35
37.91
202.97

9.14
611.97
11.89
2,114.39
9.7
2,768.59
17.3
3,060.79
35.32
1,486.04

cum
kg
cum
kg
cum
kg
cum
kg
cum
kg

9.14
611.97
11.89
2,114.39
3.88
1,107.44
14.71
2,601.67

207.16 sqm

93.22

19.2
14.4
30
1
4

sqm
sqm
sqm
lot
set

232.4
54
11.56
557.2
1

sqm
sqm
sqm
sqm
lot

14.13
594.42

92.96
21.6
250.74

344.84 sqm
395.34
3,163.59
4,579.49
203.02

sqm
kg
kg
kg

885.81

Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Subtotal 1
2

Sag Rod
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets

I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.

Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works

85.24 kg
341.08 kg
32 each
839.16 sqm
81.22 sqm
46.31 sqm
1
1
1
1

lot
lot
lot
lot

1-STOREY 4-CLASSROOM @ LURUGAN NHS, VALENCIA CITY


(School ID: 303970)

1 lot

0.5

1 lot
1,200 md
10 md
4 set

1200
10
4

cum
cum
cum
cum

36
28.35
37.91
101.49

363.14 sqm

363.14

36
28.35
37.91
202.97

9.14
611.97
11.89
2,114.39
9.7
2,768.59
17.3
3,060.79
35.32
1,486.04

cum
kg
cum
kg
cum
kg
cum
kg
cum
kg

8.23
550.77
10.7
1,902.95
3.88
1,107.44
12.11
2,142.55

207.16 sqm

93.22

19.2
14.4
30
1
4

sqm
sqm
sqm
lot
set

232.4
54
11.56
557.2
1

sqm
sqm
sqm
sqm
lot

12.36
520.11

69.72
16.2
222.88

Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Subtotal 2
3

Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal Fu
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate
Sag Rod
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets

I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.

Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works

344.84 sqm
395.34
3,163.59
4,579.49
203.02
85.24
341.08
32

sqm
kg
kg
kg
kg
kg
each

888.97

839.16 sqm
81.22 sqm
46.31 sqm
1
1
1
1

lot
lot
lot
lot

1-STOREY 1-CLASSROOM @ ULALIGAN ES, VALENCIA CITY


(School ID: 126862)

1 lot
1 lot

0.5

480 md
4 md
1 set

12.24
8.1
10.28
52.04

cum
cum
cum
cum

94.04 sqm
3.02
203.99
3.5
627.67
3.49
977.74
4.69
736.74
8.68
391.22

cum
kg
cum
kg
cum
kg
cum
kg
cum
kg

240
2
1
12.24
8.1
10.28
26.02

3.02
203.99
3.5
627.67
3.49
977.74

63.7 sqm
4.8
3.6
7.5
1
1

sqm
sqm
sqm
lot
set

47.8

Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Subtotal 3
4

Plain Cement Finish with floor hardener


Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal Fu
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate
Sag Rod
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets

I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)
Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.

Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB
Rein. Steel for RB & LRB
R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares

58.1
13.5
5.78
162.34
1

sqm
sqm
sqm
sqm
lot

86.21 sqm
106.92
445.53
1,732.7
203.02
21.31
85.27
8

sqm
kg
kg
kg
kg
kg
each

258.33 sqm
21.58 sqm
20.39 sqm
1
1
1
1

lot
lot
lot
lot

1-STOREY 2-CLASSROOM @ NEW VISAYAS ES, VALENCIA CITY


(School ID: 126853)

1 lot
1 lot
720 md
6 md
2 set
20.16
14.85
19.49
102.35

cum
cum
cum
cum

183.74 sqm
5.06
339.98
6.3
1,123.24
5.56
1,574.69
8.68
1,466.08
17.96
756.16

cum
kg
cum
kg
cum
kg
cum
kg
cum
kg

111.52 sqm

0.5
1
240
2
1
12.24
8.1
10.28
26.02

3.02
203.99
3.5
627.67
3.49
977.74

Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102
Subtotal 4
5

Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal Fu
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate
Sag Rod
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets

I.
Item SPL-6
II.
Item A.1.1
III.
Item SPL-1
Item SPL-2
Item SPL-3
IV.
Item 803
Item 804(a)
Item 804(b)
Item 804(c)
V.
Item 1000(a)
VI.
Item 900(a)
Item 404(a)
Item 900(b)
Item 404(b)
Item 900(c)
Item 404(c)
Item 900(d)

Mobilization/Demobilization
Mobilization/Demobilization
Temporary Facilities and Billboard
Temporary Facilities and Billboard
Safety and Health
Personal Protective Equipment (PPE)
Safety and Health Personnel
Signages and Barricades
Earthworks
Excavation of Column Footing, Wall Footing & SW Footing
Backfilling of Excavated Materials
Gravel Bedding @ CF, SW, WF, FTB, SOF, Trench
Embankment
Termite Control Works
Soil Poisoning
Concrete Works
R.C. for Column Footing & WF
Rein. Steel for Column Footing & WF
R.C. for Footing Tie Beam
Rein. Steel for Footing Tie Beam
R.C. for Column, PC & Stiffener
Rein. Steel for Column, PC & Stiffener
R.C. for RB & LRB

9.6
7.2
15
1
2

sqm
sqm
sqm
lot
set

116.2
27
5.78
293.96
1

sqm
sqm
sqm
sqm
lot

47.8

172.42 sqm
203.84
1,351.55
2,681.63
203.02
42.62
170.54
16

sqm
kg
kg
kg
kg
kg
each

451.94 sqm
41.46 sqm
29.03 sqm
1
1
1
1

lot
lot
lot
lot

1-STOREY 3-CLASSROOM @ TAGALAWA ES, VALENCIA CITY


(School ID: 126859)

1 lot
1 lot
960 md
8 md
3 set

0.5
1

28.08
21.6
28.7
152.66

cum
cum
cum
cum

273.44 sqm
7.1
475.97
9.09
1,618.81
7.63
2,171.64
12.67

cum
kg
cum
kg
cum
kg
cum

480
4
2
28.08
21.6
28.7
76.33

7.1
475.97

Item 404(d)
Item 900(e)
Item 404(e)
VII.
Item 506(1)A
VIII.
Item 1010(b)
Item 1005
Item 1010(1)
Item 1010(a)
Item SPL-4
IX.
Item 1021(c)
Item 1021(c-1)
Item 1021(c-2)
Item 1027(a)
Item SPL-5
X.
Item 1003
XI.
Item 1013
Item 403(a)
Item 403(b)
Item 403(c)
Item 404(f)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
Item 404(g)
SPL 905
XII.
Item 1032(a-1)
Item 1032(a-2)
Item 1032(a-3)
XIII.
Item 1100
Item 1101
Item 1102(a)
Item 1102

Rein. Steel for RB & LRB


R.C. for SOF, Corridor and Ramp
Rein. Steel for SOF, Corridor and Ramp
Masonry Works
Masonry Units
Fabricated Materials and Hardwares
Panel Door
Jalousie Window (W-2)
Jalousie Window (W-1)
Door Frames and Accessories
Blackboard
Finishing Works
Plain Cement Finish with floor hardener
Plain Cement Finish with floor hardener non-skid
Non-skid Cement Floor Finish w/ 6mm groove lines
Plain Cement Plaster Finish
Rail Guard
Carpentry Works
Carpentry for Ceiling with Insulation (Use Fiber Cement Board and Metal Fu
Roof Framing Works
Pre-Painted Metal Sheets
Steel Trusses
Purlins and Channel Beam
Angular Base Plate
Sag Rod
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Cross-Bracing
Turn Buckle
Painting Works
Masonry Painting
Wooden Painting
Steel Painting
Electrical Works
Conduits, Boxes and Fitting
Wires and Wiring Devices
Lighting Fixtures
Panel Board and Cabinets

2,195.42 kg
26.64 cum
1,121.1 kg

9.09
1618.81
7.63
2171.64

159.34 sqm
14.4
10.8
22.5
1
3

sqm
sqm
sqm
lot
set

174.3
40.5
5.78
425.58
1

sqm
sqm
sqm
sqm
lot

119.505

258.63 sqm
299.98
2,257.57
3,630.56
203.02
63.93
255.81
24

sqm
kg
kg
kg
kg
kg
each

106.4

2257.57

645.55 sqm
61.34 sqm
37.67 sqm
255.81 kg
24 each
645.55
61.34
37.67

sqm
sqm
sqm

1
1
1
1

lot
lot
lot
lot

10

from
July 28 - October 25

from
October 25-Dec31

September September September September


1 - 7
8 - 15
16 - 21
22 - 30
0.5

300

300

300

300
10
4

as of
31-Dec
0.5

1200
10
4

36
28.35
37.91
121.78

36
28.35
37.91
121.78

363.14

363.14

9.14
611.97

9.14
611.97
11.89
2114.39
3.88
1107.44
14.71
2601.67
14.13
594.42

11.9
2,114.39
3.88
1,107.44
14.71
2,601.67
14.13
594.42
33.22

60

93.22

October
1 - 7

October
8 - 15

October
16 - 21

October
22 - 30

0
0.7

0.7

0
0
0
0
0
0
0
81.19

40.19

0
0
0
0
0
0.0
5.82
1,661.15
2.59
459.12

41

5.82
1,661.15
2.59
459.12

20.37
885.58
113.94

20.37
885.58
40

30

23.94

5
7
15
0.4
0
92.96
21.6

92.96
21.6

250.74

250.74

139.44
32.4
0
306.46
0

39.44
15

344.84

885.81

395.34
885.81 2277.78
4579.49
203.02

500
579.49

85.24
341.08
32
839.16
81.22
46.31
0.4
0.4
0.4
0.4

0.5

1200
10
4
36
28.35
37.91
101.49

363.14
8.23
550.77
10.7
1,902.95
3.88
1,107.44
12.11
2,142.55
12.36
520.11
93.22

69.72
16.2
222.88

888.97

0.5
1
240
2
1
12.24
8.1
10.28
26.02

3.02
203.99
3.5
627.67
3.49
977.74

47.8

0.5
1
240
2
1
12.24
8.1
10.28
26.02

3.02
203.99
3.5
627.67
3.49
977.74

47.8

0.5

240

0.5
1

240
4
2

480
4
2

0.5
1
240

28.08
21.6
28.7
76.33

28.08
21.6
28.7
76.33

28.08
21.6
28.7
76.33

7.1
475.97

7.1
475.97

7.1
475.97

240
4
2

9.09
1618.81

25.505

7.63
2171.64

9.09
1618.81
7.63
2171.64

9.09
1618.81

47

47

119.505

56.4

50

106.4

2257.57

2257.57

2257.57

10

10

10

7.63
2171.64

25.505

47

47

56.4

50

November
1 - 7

November
8 - 15

November
16 - 21

November
22 - 30

December
1 - 7

December
8 - 15

December
16 - 21

December
22 - 30
0
0
0.7
0
0
0
0
0
0
0
0
81.19
0
0
0
0
0
0
0
5.82
1661.15
2.59
459.12
20.37
885.58

20

113.94
5
7
15
0.4

50
17.4

50

106.46

100

100

100

500
600

500
400

500
500
103.02

277.78
700

825

100

144.84

150

150

400

575

95.34

100

5
7
15
0.4
0
139.44
32.4
0
306.46
0
0
344.84
0
395.34
2277.78
4579.49
203.02

45.2
60

40
131.08
32

150

400

439.16
41.22

40
46.31
0.4
0.4
0.4
0.4

85.2
341.08
32
0
839.16
81.22
46.31
0
0.4
0.4
0.4
0.4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.5

0.5
1

240

240
4
2

240

28.08
21.6
28.7
76.33

28.08
21.6
28.7
76.33

7.1
475.97

7.1
475.97

240
4
2

9.09
1618.81

9.09
1618.81
7.63
2171.64

25.505

47

47

56.4

50

7.63
2171.64

25.505

47

47

56.4

50

2257.57

2257.57

10

10

You might also like