You are on page 1of 12

Company:

Yuan Teck Sdn.Bhd.

Conducted By:

Raymond

Sign:

Site Safety Supervisor


Location:

Farlim Square

Reviewed By:

Palanitharan

Sign:

Safety Officer
Approved By: KUNG
WENG
LIANG

Sign:

Date:

Prepared by: PALANITHARAN 0134809027

Date :From
To

March 2015

September 2016

Remarks:

Page 1 of 12

Prepared by: PALANITHARAN 0134809027

Page 2 of 12

Prepared by: PALANITHARAN 0134809027

Page 3 of 12

Prepared by: PALANITHARAN 0134809027

Page 4 of 12

1. Tower Crane Dismantle Work


HAZARD IDENTIFICATION
Which can
cause / effect

RISK ASSESSMENT

Work
Activity

Hazard

Likelihood

Severity

Risk

Install/Disman
tling of tower
crane.

Accidently
knocking
while hoisting

Extensive body
injury

Install/Disman
tling the
counter jib
ballast.
Bring the
trolley to the
jib foot and
remove the
front and rear
ropes.
Disconnect all
the electrical
circuits and
remove
cables.
Dismantle the
main jib
section as per
manufacturers
manual

Falling from
height
human

Extensive body
injury / Fatal

Training
program

20

Falling object
from high
level

Extensive body
injury / Fatal

Full P.P.E
Compliance,
Toolbox
training

12

Electrical
hazard

Injury /Fatal or
death

Fixed period
maintenance

Low Quality/
Damaged

Collapse during
concrete

Inspection
prior usage

Un proper
suspend
method

Fatal or death

Training
2

Prepared by: PALANITHARAN 0134809027

Existing Risk
Control
(if any)
Full P.P.E
Compliance,
Toolbox
training

RISK CONTROL
Recommended control
measure
Make crane having
valid PMA / driver
competent license
valid /critical lift
inspection.
Safety Harness issuing
and hard barricade for
floor opening.

PIC
( Due Date /
Status )
Safety Dept.

Safety Dept.

Working at heights safe


operational procedure
& training.

Safety Dept.

Random checking on
hoisting cable at site
specially new crane
in /inspection check list

Safety Dept.

Inspection of the timber


quality, and use PE
specified timbers

Site Supervisor.

Monitor the method of


suspending form work.

Engineer, Site
Coordinator &
Scaffolder.

Page 5 of 12

2. CONCRETING WORK
HAZARD IDENTIFICATION
Work Activity
Concreting
work

Hazard

Which can
cause / effect

Falling from
height human

Extensive body
injury / Fatal

Falling object
from high
level

Extensive body
injury / Fatal

Hit by
concrete
bucket

Body injury

Hoisting cable
of the crane
snap

Fatal or death

Prepared by: PALANITHARAN 0134809027

RISK ASSESSMENT
Existing Risk
Control
(if any)
Full P.P.E
Compliance,
tool box
training
Full P.P.E
Compliance,
tool box
training
Full P.P.E
Compliance,
tool box
training
Fixed period
maintenance

RISK CONTROL

Likelihood

Severity

Risk

20

Safety Harness issuing


and hard barricade for
floor opening.

12

Working at heights safe


operational procedure
& training.

Safety Dept.

Make crane having


valid PMA & driver
competent license valid
/ critical lift inspection.
Random checking on
hoisting cable at site
especially new crane
in / inspection check
list.

Safety Dept.

Recommended control
measure

PIC
( Due Date /
Status )
Safety Dept.

Safety Dept.

Page 6 of 12

3. BRICK WORK
HAZARD IDENTIFICATION
Work Activity
Brick work
(Future
activity)

Hazard

Which can
cause / effect

RISK ASSESSMENT
Existing Risk
Control
(if any)
Full P.P.E
Compliance,
tool box
training

Falling object
from high
level

Extensive body
injury / Fatal

Accidentally
knocking
while loading
brick

Body injury

Pinch in
between while
loading brick

Body injury

Falling from
height
human

Extensive body
injury / death

Full P.P.E
Compliance,
tool box
training

Sharp edge
object
Pallet, Door or
Window
frame.

Body injury / first


aid type injury

Eliminate,
Full P.P.E
compliance.

Prepared by: PALANITHARAN 0134809027

Full P.P.E
Compliance,
tool box
training
Full P.P.E
Compliance,
tool box
training

Likelihood

Severity

RISK CONTROL

Risk

Recommended control
measure

PIC
( Due Date /
Status )
Site Supervisor.

Carry out barricade at


ground level wear work
on going and warning
signage.

Safety Dept.

Make crane having


valid PMA & driver
competent license valid
/ critical lift inspection.

Safety Dept.

Working at heights safe


operational procedure
& training.

20

Safety Harness issuing


and hard barricade for
floor opening.

Site Supervisor.
Safety Dept.

Random inspection and


worn proper P.P.E.

Safety Dept.

Page 7 of 12

4. EXTERNAL PLASTERING
HAZARD IDENTIFICATION
Work Activity
External
plastering
(Future
activity)

Hazard
Dust pollution

Wallcrete
contact

Which can
cause / effect
Lung disease
(silicosis) / nose
and throat
irritation
Skin / eye illness

Falling object
while
hoisting
cement bags
& sand
Cement
mortar splash

Extensive body
injury / Fatal

Falling from
height
human

Extensive body
injury / Fatal

Eye / skin illness


or irritation

Prepared by: PALANITHARAN 0134809027

RISK ASSESSMENT
Existing Risk
Control
(if any)
Housekeeping,
use disposal
mask, training
Full P.P.E
Compliance,
tool box
training
Full P.P.E
Compliance,
tool box
training
Full PPE
Compliance,
tool box
training
Full P.P.E
Compliance,
tool box
training

RISK CONTROL

Likelihood

Severity

Risk

Recommended control
measure

PIC
( Due Date /
Status )
Safety Dept.
Site Supervisor.

Refer to MSDS and


keep a copy for site
personnel reference.

Refer to MSDS and


keep a copy for site
personnel reference.

Safety Dept
Site Supervisor.

12

Working at heights safe


operational procedure
& training.

Safety Dept
Site Supervisor.

Refer to MSDS and


keep a copy for site
personnel reference.

Safety Dept
Site Supervisor.

12

Working at heights safe


operational procedure
& training.

Safety Dept
Site Supervisor.

Page 8 of 12

5. SCAFFOLDING ERECTION AND DISMANTLING


HAZARD IDENTIFICATION
Work Activity

Scaffolding
erection and
dismantling

Hazard

Which can
cause / effect

RISK ASSESSMENT
Existing Risk
Control
(if any)

Falling from
height
human

Extensive body
injury / Fatal

Training
program

Slippery
rainy season
or un proper
P.P.E
Falling object
from high
level

Body injury

Scaffolding
collapse due
to un proper
method
Platform
broken

Extensive body
injury / Fatal

Full P.P.E
Compliance,
tool box
training
Full PPE
Compliance,
tool box
training
Weekly
inspection

Extensive body
injury / Fatal

Weekly
inspection

Body injury /
Fatal

Prepared by: PALANITHARAN 0134809027

RISK CONTROL

Likelihood

Severity

Risk

Recommended control
measure

PIC
( Due Date /
Status )

12

Working at heights safe


operational procedure
& training.

Safety Dept.

Working at heights safe


operational procedure
& training.

Safety Dept.

Safety Dept.

16

Working at heights safe


operational procedure
& training.

10

To carry out weekly


inspection by
competent scaffolder.

Scaffolder.

2
1

To carry out weekly


inspection by
competent scaffolder.

Scaffolder.

Page 9 of 12

6. EXTERNAL PAINTING WORK


HAZARD IDENTIFICATION
Work Activity

External
Painting work
(Future
activity)

Hazard

Which can
cause / effect

Falling from
height
human

Extensive body
injury / Fatal

Falling object
from high
level

Extensive body
injury / Fatal

Slippery
rainy season
or un proper
PPE
Contact with
paint /
kerosene

Body injury

Paint
splashing

Skin / eye illness


or irritation

Skin / eye illness


or irritation

Prepared by: PALANITHARAN 0134809027

RISK ASSESSMENT
Existing Risk
Control
(if any)
Full P.P.E
Compliance,
tool box
training
Full PPE
Compliance,
tool box
training
Housekeeping

Full P.P.E
Compliance,
tool box
training
Full P.P.E
Compliance,
tool box
training

RISK CONTROL

Likelihood

Severity

Risk

Recommended control
measure

PIC
( Due Date /
Status )

12

Working at heights safe


operational procedure
& training.

Safety Dept

16

Working at heights safe


operational procedure
& training.

Safety Dept

Safety Dept

Working at heights safe


operational procedure
& training.

Refer to MSDS and


keep a copy for site
personnel reference.

Safety Dept

Refer to MSDS and


keep a copy for site
personnel reference.

Safety Dept

Page 10 of 12

7. ROOF TRUSS WORK


HAZARD IDENTIFICATION
Work Activity

Roof truss
work
(Future
activity)

Hazard

Which can
cause / effect

Falling from
height
human

Extensive body
injury / Fatal

Sharp edges

Body injury

Knocking by
swinging
object while
hoisting
Falling object
from height

Body injury

Extensive body
injury / Fatal

Prepared by: PALANITHARAN 0134809027

RISK ASSESSMENT
Existing Risk
Control
(if any)
Full P.P.E
Compliance,
tool box
training
Eliminate
Full P.P.E
Compliance,
tool box
training
Full P.P.E
Compliance,
tool box
training

RISK CONTROL

Likelihood

Severity

Risk

12

12

12

Recommended control
measure

PIC
( Due Date /
Status )

Working at heights safe


operational procedure
& training.

Safety Dept

Random inspection and


worn proper PPE.
Make crane having
valid PMA & driver
competent license valid
/ critical lift inspection.
Working at heights safe
operational procedure
& training.

Safety Dept
Safety Dept

Safety Dept

Page 11 of 12

8. HOT WORK
HAZARD IDENTIFICATION
Work Activity

Hot work

Hazard

Spark / Fire Contact with


flammable
material

Which can
cause / effect
Burn injury to
body and property
damage

Prepared by: PALANITHARAN 0134809027

RISK ASSESSMENT
Existing Risk
Control
(if any)
Remove
flammable
material, wear
goggles

RISK CONTROL

Likelihood

Severity

Risk

Recommended control
measure
Wear leather hand
gloves and goggles,
place fire extinguisher
at work place

PIC
( Due Date /
Status )
Site Supervisor

Page 12 of 12

You might also like