NAME OF PROJECT: HO FUME ROAD PROJECT (KM 0 7) & (KM 28.7 40.1)
VARIATION ORDER N.O.4 (LIKPE-TODOME CAVE ROAD).
SECTION: KM 0+00-3+KM 3+895
CONTRACTOR: ROLIDER
DATE: 21/07/2016
SUBJECT: Re: Construct the road according to the working drawing provided by the
Engineer.
You are instructed to Construct the road using the vertical and horizontal alignments in the
drawing. For any future minor changes, the ER must be informed with the center line set out
for the ER to inspect and approve or disapprove.
ISSUED BY THE RE
Name: C. K. Baah
Name:
Signature: CKBaah
Signature:
Date: 21/07/2016
Date: