Quiz No. 1
1. A new pressure vessel should be inspected to which of the following codes?
a. API 510
b. API 572
c.ASME Sec. VIII Div. 1
d. All of the above
2. For repairs as per API 510, the welders and welding procedures shall be qualified to the
requirement of:
a. API 1104 code
b. ASME Section V
c.ASME Section IX
d. AWS D 1.1
3. For all repairs and alterations under API 510, the ultimate responsibility rests with:
a. Owner user
b. API Committee
c.API-510 Inspector
d. Jurisdiction authority
4. Repair Organization is__________ and carries out repairs as per API 510
a. Holder of ASME certificate & appropriate code symbol stamp
b. Owner-user
c.Contractor under contract with owner-user
d.Any of above
5. In API-510, the term RBI means:
a. Repairing Before Inspection
b. Report Based Inspection
c. Repair Based Inspection
d.Risk Based Inspection
6. Repair on pressure vessels will:
a. Restore the vessels to intended (original)design conditions
b. Not change the rating of vessel.
c.
a and b above
d.Restore the vessels to some other usable conditions
7. According to API 510, authorized inspection agency is:
a. Jurisdiction organization
b. Insurance company which under writes insurance of pressure vessels
c.
Inspection organization of owner-user
d.Any of above

El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161

E
(

C
C

T
I

I
C

O
)

8. As per API 510 .. is responsible for design, engineering review, analysis, or


evaluation of pressure vessels and pressure-relieving devices .
a. The Inspector
b. The Owner /User
c.
Repair organization
d. The examiner
9. Define the following :
a.
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
m.
n.

Alteration
corrosion rate
corrosion specialist
major repair
defect
hold point
imperfections
indications
inspector
pressure vessel engineer
repair
rerating
temporary repairs
risk-based inspection (RBI)

10.What is the temper embrittlement?


11.What is the transition temperature?
12.Who can act as Repair Organization?
13.Who can act as authorized inspection agency?
14.Who is the pressure vessel engineer, the inspector, owner/user?
15.Who is responsible to execute the inspection plan
a. The Inspector
b. The Engineer
c. The Owner/user
d. The AIA
16.Who is responsible for engineering review, analysis, or evaluation of pressure vessels
and pressure-relieving devices
a. The Inspector
b. The Engineer
c. The Owner/user
d. The repair organization

El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161

E
(

17.Who is responsible to provide


workmanship
a. The jurisdiction
b. The Engineer
c. The Owner/user
d. The repair organization

C
C
the

T
I

I
C

O
)

materials,

equipment,

quality

control,

and

18.Who is responsible for the inspection, NDE, and pressure testing activities meet API 510
requirements
a. The Inspector
b. The Engineer
c. The Owner/user
d. The Examiner
19.Who is responsible for the development of the inspection plan? And when shall the
corrosion specialist be consulted?
20.What are the Contents of an Inspection Plan?

El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161

You might also like