Equipment V-2210
The demister pad at the bottom layer was installed and the inspection was
carried out and found intact
Cleared for installing the plates and the spiral flow box
Equipment EJ-2201 ejector
Rust colorings noted at the entrance of the nozzles in east side and top side.
Inside top side nozzle noted with loose deposits
Insulation removed and the external of the surface found satisfactory
Gasket face found satisfactory
Ut thickness measurement completed and found satisfactory
Equipment EJ-2201-s1 silencer
Wet rust deposit noted inside the silencer ,when viewed through nozzle
Silencer pipe noted with minor scales and loose deposits
Gasket face found satisfactory
Equipment E-3205A
East side
The 105 tubes were de-plugged for inspection randomly in v pattern
and the following observations noted
No plugging noted ,tube sheets found satisfactory
Minor thinning noted in the entrance of the most of the tubes
In the bottom of the header water found for 2mm height for the entire length
of the header.
External of the tube fins found satisfactory.
External of the draft and guard found satisfactory
During de-plugging the threads of the header found damage ,it shall
be filled and rethreaded.
Counting from left
3rd row 16th plug
West side
Equipment E-3205 B
East side
The 98 tubes were de-plugged for inspection randomly in v pattern
and the following observations noted
No plugging noted ,tube sheets found satisfactory
Minor thinning noted in the entrance of the most of the tubes
In the left side of the header water found for 2mm height in0.5meter length
of the header.
External of the tube fins found satisfactory.
External of the draft and guard found satisfactory
West side
Equipment C-2201-V
Inspection was carried out after draining and cleaning and following
observation s noted
Heaters five sets found clean and intact
Suction pumps 2nos with strainers found clean and intact
Thermocouple 2nos found intact
Weld and joints found clean and intact
Ut thickness measurement found satisfactory
Equipment ME-2101-V1
UTG Thickness measurement completed and found satisfactory
Equipment ME-2101-V2
UTG Thickness measurement completed and found satisfactory
Fabrication
Sr
n
o
WO No
Descripti
on (of
WO)
cm73923
116Condensat
e outlet
line elbow
clamped
portion to
be
replaced
Cm7138
8
Inspecti
ons
carried
out
Remarks
Dpi
,visual
satisfacto
ry
Dpi
,visual
satisfacto
ry