SATIP No.
APPROVED DATE
SATIP-L-350-08
PROJECT TITLE:
ITEM
NO.
1.0
PROJECT PHASE
& Activity Code
DISCIPLINE:
25-May-05
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
TASK / ACTIVITY
QUALITY
PROCEDURE
QUALITY
RECORD
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
SAUDI
ARAMCO
H1
H1
REMARKS
DOCUMENT REVIEW
SAIC-L-2031
(HOLD)
1.1
1.2
NDE Procedure
1.3
SAIC-L-2004
HR1
R1
1.4
SAIC-L-2033
H1
R1
2.1
SAIC-L-2005
SAIC-L-2005
W1
W2
2.2
SAIC-M-2003
SAIC-M-2003
W1
W2
2.3
SAIC-L-2034
SAIC-L-2034
W1
2.4
SAIC-L-2010
SAIC-L-2010
SATR-A-2012
SATR-A-2013
H1
W2
3.1
SAIC-L-2035
SAIC-L-2035
W1
3.2
Welding Inspection
2.0
3.0
Refer to the applicable SATIP for NDE; SATIP-NDELPT-01, NDE-MPT-01, NDE-RT-01, NDE-UT-01
MATERIAL RECEIVING
FABRICATION
NOTE: Depending on the QC Organization, this is
usually assigned to the Piping Inspector, should there
be a division of responsibility between a Piping
inspector and a Welding inspector.
Refer to the applicable SATIP for welding: SATIP-W011-01, W-012-01, W-016-01, W-014-01, & M-00104
Page 1 of 2
APPROVED DATE
SATIP No.
SATIP-L-350-08
PROJECT TITLE:
ITEM
NO.
DISCIPLINE:
25-May-05
MECHANICAL
CONTRACTOR/SUBCONTRACTOR
PROJECT PHASE
& Activity Code
TASK / ACTIVITY
QUALITY
PROCEDURE
QUALITY
RECORD
INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR
SAUDI
ARAMCO
REMARKS
3.3
Cold Bending
SAIC-L-2036
SAIC-L-2036
H1
W1
3.4
Hot bending
SAIC-L-2037
SAIC-L-2037
H1
W1
3.5
Refer to the applicable SATIP for NDE; SATIP-NDELPT-01, NDE-MPI-01, NDE-RT-01, NDE-UT-01.
3.6
3.7
4.0
RELEASE FOR
SHIPMENT
4.1
SAIC-L-2038
SAIC-L-2038
H1
W1
4.2
SAIC-M-2021
SAIC-M-2021
H1
GENERAL NOTES
1
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
levels of Saudi Aramco participation based upon the Contractors performance.
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative
is not present.
Hold:
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
LEGEND
W1
H2
W2
R1
H1
R2
Page 2 of 2
Surveillance