You are on page 1of 6

1.

52
3.00

PROPOSED DIMENSION
FOR THE SHELTER
RENNOVATION
EXISTING
TRANSFORMER

T&B

ELECTRICAL
ROOM

PROPOSED
250 KVA
GENSET
FOR COB
ANNEX
BLDG.

5.00

2.77

TO BE RESIZE OR FOR
RENNOVATION
PROPOSED
GENERATOR LOCATION

PROPOSED
DIESEL
TANK

3.35

EXISTING
SHELTER

0.90

PROPOSED
CONCRETE
BASE
PAD

PROPOSED
MANUAL
TRANSFER
SWITCH (MTS)

Remove
Existing
Pipe

PROPOSED
AUTOMATIC
TRANSFER
SWITCH (ATS)

HE

BAC
MANAGER
OFFICE

BAC STAFF

4.60

OFFICE

OFFICE

SHE

fire exit

HALL WAY

1.20

fire exit

HALL WAY
HALL WAY

INFO.

ACU PANEL

PPGS

RECEPTION AREA

RECORDS

acu

up

STORAGE

PASS CONTROL
& ID OFFICE

LOUNGE AREA

SUPERVISOR

PC &ID
RECORDS

EXISTING
CONCRETE
PAD

2.36

MAIN DISTRIBUTION
PANEL (MDP)

COB ANNEX
ELECTRICAL ROOM

2.50

TOP ELEVATION
1:100

MTS

SCALE

1.40

GROUND FLOOR BUILDING PLAN LAYOUT


NTS

2.88

0.72

SCALE

PROPOSE
GENERATOR

3.00

CORPORATE OFFICE BUILDING (COB) - ANNEX

RECOMMENDING APPROVAL

DESIGN STAFF

PROJECT TITLE

LEFT SIDE ELEVATION


SCALE

1:100

MTS

DISCIPLINE

APPROVED BY

ARCHITECTURAL
JASD

CLARK
INTERNATIONAL AIRPORT

PROPOSED DIESEL ENGINE GENERATOR


AT CORPORATE OFFICE BUILDING - ANNEX

SHEET NO:

AOP

checked:
JOVITO M. SUNGA
AED - ASST. MANAGER

verified:
RUEL T. ANGELES
AED - MANAGER

REYNALDO L. CATACUTAN
VP - AIRPORT OPERATIONS MGMT. GRP.

FLOOR PLAN

BIENVENIDO O. MANGA
EVP / COO - DMIA

DATE :

A
1-1

T&B

T&B
AED
MGR./ASST.MGR.

AED-SEC.

OCC OFFICE

A = 21.85 SQM.

A = 53.97 SQM.

VP - CBDG
SEC.

VP - CBDG
A = 30.13 SQM.

A = 20.13 SQM.

A = 14.26 SQM.

VP - AFG SEC.

ATO-SEC.

ATO
A = 25.41 SQM.

RMO

A = 15.65 SQM.

T&B

A = 14.95 SQM.

T&B

A = 14.15 SQM.

CORSEC / MGR EVP & COO


- SEC

STAFF
A = 14.72 SQM.

A = 14.72 SQM.

A = 14.72 SQM.

A = 14.72 SQM.

T&B

CIVIL

A = 30.13 SQM.

A = 26.24 SQM.

STORAGE
ROOM

VP FINANCE
STAFF

VIP. LOUNGE

BOARD ROOM

RADAR ROOM
PROCUREMENT

DIRECTOR
LOUNGE

BILLING SECTION
EXISTING
ACCESS

SHE
PAYROLL

TREASURY
STAFF

TREASURY
MGR.OFFICE

VAULT AREA

AREA =
16.00 SQM.

AREA =
10.00 SQM.

STORAGE

SHE

AREA =
13.00 SQM.

PLANNING SECTION
A = 83.90 SQM.
PLANNING
HEAD

A = 42.21 SQM.

PROVIDENT

STO.

FINANCE
MANAGER

LEGAL
MANAGER

TREASURY

TREASURY
RECORDS

COA
record room

HE

WAITING
AREA

VP CATACUTAN

H A L L W A Y

PANTRY
ROOM

STAFF

SHE

HE

CORP. CLINIC
A = 21.73 SQM.

HE

H A L L W A Y

MIS DEPT.
AREA =
8.62 SQM.

PABX

PGS
MGR.

A = 45.66 SQM.

DR.RM.

A = 16.68 SQM.

A = 13.69 SQM.

PABX
AREA =
12.53 SQM.

CANTEEN

PRAYER
ROOM
A = 16.56 SQM.

ENTRANCE

KITCHEN

INTERNAL
AUDIT

COA

ELECTRICAL ROOM

SHE

AREA =
11.00 SQM.

AREA =
8.45 SQM.

GARRAGE

BOOKEEPING

A = 19.21 SQM.

T&B

LOW PARTITION

PLN'G.
FILES

RECEIVING
AREA

ENTRANCE

PROCCESSING AREA

existing shelves

HDR FILE STORAGE

A = 30.13 SQM.

VP FINANCE

HE
CORPORATE
PLANNING

A = 9.97 SQM.

COMPUTER AREA

HEA
OFFICE

A = 14.14 SQM.

A = 14.72 SQM.

LOUNGE AREA

LOW PARTITION

MARKETING
DEPT.

MAIN LOBBY

A = 13.05 SQM.

HALL WAY

HALLWAY

HRD STAFF

PRESIDENT/CEO

BUDGET

A = 40.95 SQM.

MGR.OFFICE

A = 72.45 SQM.

EVP & COO

H A L L W A Y

H A L L W A Y

HR MANAGER'S
OFFICE

CONFERENCE
ROOM

EVP & COO


- EA

foyer

H A L L W A Y

RECEPTION
AREA

EXECUTIVE
SEC.

CORPLAN OFFICE

ENTRANCE

VP - AFG
A = 24.49 SQM.

A = 36.11 SQM.

AREA =
16.80 SQM.

STORAGE

T&B

GENERATOR
LOCATION

BUILDING PLAN LAYOUT


SCALE

NTS

CORPORATE OFFICE BUILDING (COB)


PROPOSED MTS
PANELBOARD
PROPOSED ATS
PANELBOARD

CH-1

CH-2

EXISTING COB GENSET 2 MANUAL


TRANSFER SWITCH (MTS)
EXISTING COB GENSET 2 AUTOMATIC
TRANSFER SWITCH (ATS)

CH-3

PAD
MOUNTED

CORPORATE OFFICE BUILDING


ELECTRICAL ROOM

MOTOR CONTROL CENTER


PULL
BOX

AUXILIARY
PANEL
BOARD

EXISTING
CONCRETE
BASE
PAD

EXISTING
CABLE
TRENCH

EXISTING
CABLE
TRENCH
STEP-UP
TRANSFORMER
220V/440V, 3
FOR MIS UPS

MAIN SWITCH GEAR

BY-PASS MANUAL
TRANSFER
SWITCH (MTS)

COB
GENSET 1

COB GENSET 1
AUTOMATIC SWITCH
TRANSFER (ATS)

2.77

EXISTING
CABLE
TRENCH

PROPOSED
250 KVA
GENSET
FOR
RADAR
COB

PROPOSED
NEW
LOCATION
OF
RESEVRE
DIESEL
TANK

EXISTING
COB
GENSET 2

0.90

TOP ELEVATION
SCALE

1:100

MTS

RECOMMENDING APPROVAL

DESIGN STAFF

PROJECT TITLE

DISCIPLINE

APPROVED BY

ARCHITECTURAL
JASD

CLARK
INTERNATIONAL AIRPORT

PROPOSED DIESEL ENGINE GENERATOR


AT CORPORATE OFFICE BUILDING

SHEET NO:

AOP

checked:
JOVITO M. SUNGA
AED - ASST. MANAGER

verified:
RUEL T. ANGELES
AED - MANAGER

REYNALDO L. CATACUTAN
VP - AIRPORT OPERATIONS MGMT. GRP.

FLOOR PLAN

BIENVENIDO O. MANGA
EVP / COO - DMIA

DATE :

A
1-1

OPEN
SHELTER

EXISTING
AUTOMATIC
TRANSFER
SWITCH (ATS)
BOARD

Existing Post

21.47

12.00

3.80

EXISTING GENSET
SHELTER
8.76

5.00

PROPOSE
SPILL
OIL &
FUEL
TRENCH

SPILL OIL &


FUEL TRENCH

8.00

4.35

EXISTING
CONCRETE
BASE
PAD

PROPOSED
DIESEL
TANK

EXISTING
RAPCON
BLDG.
GENSET
ATS

PROPOSED
MTS
PANELBOARD

PROPOSED
125 KVA
GENSET
FOR ESD
BLDG.

6.50

3.35

EXISTING
DIESEL
TANK
FOR
RAPCON
GENSET

ELECTRICAL
ROOM

PROPOSED
ATS
PANELBOARD

1.52

ESD BLDG.
TOP ELEVATION
SCALE

1:100

MTS

EMERGENCY SERVICES DEPARTMENT (ESD) BUILDING

RECOMMENDING APPROVAL

DESIGN STAFF

PROJECT TITLE

DISCIPLINE

APPROVED BY

ARCHITECTURAL
JASD

CLARK
INTERNATIONAL AIRPORT

SHEET NO:

AOP

checked:
PROPOSED DIESEL ENGINE GENERATOR AT
EMERGENCY SERVICES DEPARTMENT BUILDING
JOVITO M. SUNGA
AED - ASST. MANAGER

verified:
RUEL T. ANGELES
AED - MANAGER

REYNALDO L. CATACUTAN
VP - AIRPORT OPERATIONS MGMT. GRP.

FLOOR PLAN

BIENVENIDO O. MANGA
EVP / COO - DMIA

DATE :

A
1-1

PROPOSED
LOCATION OF
MANUAL
TRANSFER
SWITCH (MTS)
PANELBOARD
PROPOSED
LOCATION OF
AUTOMATIC
TRANSFER
SWITCH (ATS)
PANELBOARD

TELEPHONE
TERMINAL
CABINET
(TTC)

REMOVE EXISTING AND


NON - OPERATIONAL
GENERATOR

PROPOSED LOCATION
FOR THE 125 KVA
GENSET

CONTROL
TOWER
ELECTRICAL
ROOM
WATER
PUMP
MDP

DP

PROPOSE
DIESEL
TANK

ELEVATOR

2.30

EXISTING
AUTOMATIC
TRANSFER
SWITCH (ATS)
BOARD

PROPOSED
LOCATION
FOR
125 KVA
GENSET
FOR
CONTROL
TOWER

UP

0.74
MDP

TELEPHONE
TERMINAL
CABINET
(TTC)

WATER
PUMP

DP

UP

ELEVATOR

GROUND FLOOR BUILDING PLAN LAYOUT


SCALE

TOP ELEVATION

NTS

SCALE

1:100

MTS

CONTROL TOWER ELECTRICAL ROOM


RECOMMENDING APPROVAL

DESIGN STAFF

PROJECT TITLE

DISCIPLINE

APPROVED BY

ARCHITECTURAL
JASD

CLARK
INTERNATIONAL AIRPORT

PROPOSED DIESEL ENGINE GENERATOR


AT CONTROL TOWER BUILDING

SHEET NO:

AOP

checked:
JOVITO M. SUNGA
AED - ASST. MANAGER

verified:
RUEL T. ANGELES
AED - MANAGER

REYNALDO L. CATACUTAN
VP - AIRPORT OPERATIONS MGMT. GRP.

FLOOR PLAN

BIENVENIDO O. MANGA
EVP / COO - DMIA

DATE :

A
1-1

PROPOSED
DIESEL
TANK

PROPOSED
MANUAL
TRANSFER
(ATS)

PROPOSED
LOCATION
FOR THE
125 KVA
GENSET
FOR ASD
BLDG.

MDP

DP

PROPOSED
AUTOMATIC
TRANSFER
SWITCH
(ATS)

AVIATION SECURITY
DEPARTMENT (ASD) BUILDING
ELECTRICAL ROOM

PROPOSED
DIESEL
TANK

PROPOSED
AUTOMATIC
SWITCH
TRANSFER
(ATS)

MDP

DP

2.30

PROPOSE
125 KVA
GENSET
FOR ASD
BLDG.

0.74

TOP ELEVATION

BUILDING PLAN LAYOUT


SCALE

PROPOSE
PAD
MOUNTED

SCALE

NTS

1:100

MTS

AVIATION SECURITY DEPARTMENT (ASD) BUILDING


ELECTRICAL ROOM

RECOMMENDING APPROVAL

DESIGN STAFF

PROJECT TITLE

APPROVED BY

DISCIPLINE
ARCHITECTURAL

JASD

CLARK
INTERNATIONAL AIRPORT

SHEET NO:

AOP

checked:
PROPOSED DIESEL ENGINE GENERATOR
AT AVIATION SECURITY DEPARTMENT BUILDING
JOVITO M. SUNGA
AED - ASST. MANAGER

verified:
RUEL T. ANGELES
AED - MANAGER

REYNALDO L. CATACUTAN
VP - AIRPORT OPERATIONS MGMT. GRP.

BIENVENIDO O. MANGA
EVP / COO - DMIA

FLOOR PLAN

A
1-1

CABLE TRENCH

GENERATOR
CONTROL
PANEL
NO. 1
DP-CH

BRANCHES

LVSG

BRANCHES

GENERATOR
CONTROL
PANEL
NO. 2

TIE CB

AUTOMATIC
TRANSFER
SWITCH
(ATS)

BY-PAS
ISOLATION
SWITCH
PANEL

FEEDER
PANEL
NO. 1

SYNCHRONIZING
SWING PANEL

CABLE
TRENCH

CABLE
TRENCH

PP-CH

PROPOSED LOCATION
OF CONCRETE BASE
PAD

OLD POWER HOUSE

GENERATOR LOCATION

PROPOSED
LOCATION
OF 625KVA
GENSET
FOR THE
PTB-EXPANSION

PROPOSED
LOCATION
FREE
STANDING
ATS

SPILL OIL
& FUEL
TRENCH

GENERATOR 2

GENERATOR 1

PROPOSED
LOCATION
FREE
STANDING
MTS

SPILL OIL
& FUEL
TRENCH

SPILL OIL
& FUEL
TRENCH

CABLE TRENCH

GENERATOR
CONTROL
PANEL
NO. 1
DP-CH

NEW POWER HOUSE


EXTENSION

BRANCHES

LVSG

BRANCHES

GENERATOR
CONTROL
PANEL
NO. 2

TIE CB

AUTOMATIC
TRANSFER
SWITCH
(ATS)

BY-PAS
ISOLATION
SWITCH
PANEL

FEEDER
PANEL
NO. 1

SYNCHRONIZING
SWING PANEL

CABLE
TRENCH

PP-CH

3.31

BUILDING PLAN LAYOUT


SCALE

CABLE
TRENCH

PROPOSED
LOCATION
OF
CONRETE
BASE
PAD

NTS

PROPOSED
OF 625 KVA
GENSET FOR
PASSENGER
TERMINAL
BLDG.

GENERATOR 1

GENERATOR 2

PROPOSED
LOCATION
FREE
STANDING
MTS

PROPOSED
LOCATION
FREE
STANDING
ATS

PROPOSE
SPILL OIL
& FUEL
TRENCH

DIESEL TANK

SPILL OIL
& FUEL
TRENCH

SPILL OIL
& FUEL
TRENCH

HIGH
VOLTAGE
MANHOLE

1.25

PASSENGER TERMINAL BUILDING (PTB)


GENSET POWER HOUSE

SCALE

RECOMMENDING APPROVAL

DESIGN STAFF

PROJECT TITLE

TOP ELEVATION
1:100

MTS

DISCIPLINE

APPROVED BY

ARCHITECTURAL

CLARK
INTERNATIONAL AIRPORT

PROPOSED DIESEL ENGINE GENERATOR


AT PASSENGER TERMINAL BUILDING
GENERATOR POWER HOUSE

JASD

SHEET NO:

AOP

checked:
JOVITO M. SUNGA
AED - ASST. MANAGER

verified:
RUEL T. ANGELES
AED - MANAGER

REYNALDO L. CATACUTAN
VP - AIRPORT OPERATIONS MGMT. GRP.

FLOOR PLAN

BIENVENIDO O. MANGA
EVP / COO - DMIA

DATE :

A
1-1