You are on page 1of 48

Soil description Soil particles passing through 0.

063mm sieve - Fine grained soil (MH / CH)


Hydrometer serial number
Hydrometer calibration equation
Total dry mass of soil (g)
Mass of dry soil passing 0.063mm sieve (g)
Per cent passing 0.063mm sieve (%)

874811/A
HR=218-4.08Rh
101.817
40.082
39.367

Meniscus correction

0.5

Clock Time

Date
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Wednesday, December 03, 2014
Thursday, December 04, 2014
Friday, December 05, 2014
Saturday, December 06, 2014

50

45
Percentage Passing (%)
40

39.397

35

30

28
25

20
0.001

10:32:30 AM
10:33:00 AM
10:34:00 AM
10:36:00 AM
10:40:00 AM
10:47:00 AM
11:00:00 AM
11:32:00 AM
12:32:00 PM
2:32:00 PM
6:02:30 PM
10:32:00 AM
10:32:00 AM
10:32:00 AM

30

25

20
0.001

0.002

Particle siz
Silt-size range
Silt fraction (%)

(0.002-0.063)mm
11.397

Clay-size range
Clay fraction (%)

<0.002mm
28

eve - Fine grained soil (MH / CH)

Elapsed time,
t (min)

0.5
1.0
2.0
4.0
8.0
15.0
30.0
60.0
120.0
240.0
448.0
1440.0
2880.0
4320.0

Temp.T
(0C)

28.0
28.0
28.0
28.0
28.0
28.0
28.0
29.0
30.0
30.0
29.0
27.0
28.0
29.0

Rh'+ Cm=

Reading Rh'
Rh
(mPa.s)

0.835
0.835
0.835
0.835
0.835
0.835
0.835
0.817
0.798
0.798
0.817
0.854
0.835
0.817

23.00
22.50
22.00
21.50
21.00
20.50
20.50
20.00
19.00
18.00
17.50
17.00
16.50
16.00

23.50
23.00
22.50
22.00
21.50
21.00
21.00
20.50
19.50
18.50
18.00
17.50
17.00
16.50

HR (mm) D (mm)

R'0

121.933
123.966
125.999
128.033
130.066
132.099
132.099
134.133
138.199
142.266
144.299
146.333
148.366
150.399

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-0.50
-0.50
-0.50
0.00
0.00
0.00

0.0581
0.0414
0.0295
0.0211
0.0150
0.0110
0.0078
0.0055
0.0039
0.0028
0.0021
0.0012
0.0008
0.0007

0.063

0.01

0.1

R'h - R'0 = Rd

23.00
22.50
22.00
21.50
21.00
20.50
20.50
20.00
19.50
18.50
18.00
17.00
16.50
16.00

K (%)

35.878
35.098
34.318
33.538
32.758
31.978
31.978
31.198
30.418
28.858
28.078
26.518
25.738
24.958

39.367

0.01
Particle size (mm)

0.063

0.1

Soil description Poorly graded gravel soil sample (GP). Particles sizes between 2mm to 60m
Mass of container (g)
Mass of soil + container (g)
Mass of soil @ beginning of test (g)

236.40
659.40
423.00

Total mass @ end of test (g)


Per cent error (%)

422.80
0.05

Sieve No.

Cumulative
Cumulative
Sieve size
mass Retained
percent
(mm)
(g)
retained (%)
20
14
10
6.3
4.75
3.35
2
1.18
0.6
0.425
0.3
0.212
0.15
0.063
Pan

Category
D10
D30
D60
Cu
Cc

0
106
211.9
269.1
305.4
339.1
363.3
386.7
410.7
422.7
422.8

Size (mm)
0.240
0.700
2.550
10.625
0.801

0.00
25.07
50.12
63.65
72.23
80.20
85.93
91.46
97.14
99.98
100.00

Type
Gravel
Coarse Sand
Medium Sand
Fine Sand
Silt+Clay

Range
(2-60)mm
(0.6-2)mm
(0.2-.6)mm
(0.063-0.2)m
<0.063mm

% fraction
50.12
22.11
19.23
8.51
0.02

sizes between 2mm to 60mm (gravel), 0.063mm to 2mm (sand) and <0.063mm (silt+clay)

100
90
80
Percentage
Passing (%)
% passing
100.00
74.93
49.88
36.35
27.77
19.80
14.07
8.54
2.86
0.02
0.00

70
60
50
40
30
20
10
0
0.001

0.01

0.1

0.240

0.700

Particle size (mm)

2.550

10

m)

2.550

10

100

Soil description Air dried powdered soli sample passing 0.425mm sieve (ML)
Liquid Limit Test
Can number
Mass of wet soil + can (g)
Mass of dry soil + can (g)
Mass of can (g)
Mass of dry soil (g)
Mass of water (g)
Moisture content, w (%)
Numbre of blows , N

1
19.692
18.480
16.310
2.170
1.212
55.853
11

Can number
Mass of wet soil + can (g)
Mass of dry soil + can (g)
Mass of can (g)
Mass of dry soil (g)
Mass of water (g)
Water content, w (%)

1-PL
19.994
19.072
16.334
2.738
0.922
33.674

2
20.453
19.118
16.460
2.658
1.335
50.226
20

3
21.321
19.706
16.380
3.326
1.615
48.557
23

4
20.641
19.220
16.363
2.857
1.421
49.737
28

Plastic Limit Test

Liquid Limit
49.0
Plastic Limit
33.674
Plasticity Index
15.326
Group symbol
ML
Soil description Silts, silty or clayey fine sand, with slightly plasticity
Compute Liquidity Index if w = 50%; LI = (w - PL) / PI
Compute Flow Index FI = w/(log [N2 / N1])

1.065
15.62

425mm sieve (ML)

5
19.409
18.457
16.464
1.993
0.952
47.767
36

60
58
56
54
52

50.5

50
Moisture
content, w (%)
49
48
47.75

46
44
42
40
10

20

25

Numbre of blows , N

30

Soil description Air dried soil passing 20mm sieve


Number of blows per layer
Number of layers
Weight of Hammer (kg)
Average mould diameter (cm)
Average mould height (cm)
Average Volume (cm3)
Gs (Assumed)
Specimen No.
Moisture can no.
Mass of can + wet soil (g)
Mass of can + dry soil (g)
Mass of water (g)
Mass of can (g)
Mass of dry soil (g)
Moisture content, w (%)

25
3
2.5
10.15
11.63
940.98
2.65
1
T
28.305
26.942
1.363
16.304
10.638
12.813

2
T
35.303
33.028
2.275
16.356
16.672
13.646

B
34.960
33.225
1.735
16.480
16.745
10.361

B
45.892
42.172
3.720
16.518
25.654
14.501

3
T
38.799
35.401
3.398
16.418
18.983
17.900

w% (assumed)
w% (measured)
Mass of soil + mould (g)
Mass of mould (g)
Mass of soil in mould (g)
Wet unit weight kN/m3
Dry unit weight kN/m3

8
11.59
3501
1757
1744
18.182
16.294

10
14.07
3598
1757
1841
19.193
16.825

12
16.64
3690
1757
1933
20.152
17.278

Dry density kN/m3 corresponding to S=1.0

19.889

18.935

18.042

Dry 22
unit weight (kN/m3)
21
20
19
18

17.2
17
16
15
10

12

14

16

Optimum moisture content (%)


Maximum dry unit weight kN/m3

16.8%
17.2

3
B
38.896
35.892
3.004
16.354
19.538
15.375

4
T
24.458
23.131
1.327
16.274
6.857
19.352

B
30.556
28.410
2.146
16.321
12.089
17.752

5
T
30.311
27.984
2.327
16.373
11.611
20.041

12
16.64
3690
1757
1933
20.152
17.278

14
18.55
3685
1757
1928
20.100
16.955

16
20.99
3625
1757
1868
19.474
16.095

18.042

17.428

16.704

B
32.582
29.675
2.907
16.429
13.246
21.946

3)

14

16

16.8 18

20

22

Moisture Content (%)

Soil description Soft clay soil sample


Mass of container (g)
Mass of total specimen + container (g) at beginning of test
Mass of total specimen + container (g) at end of test
Mass of oven dried specimen + container (g)
Mass of water (g)
Mass of solids (g)
Moisture Content (g)

16.157
247.637
246.695
190.064
57.573
173.907
33.106

Average diameter (mm)


Average initial height (mm)

37.5
110

Least count of vertical dial


Least count of force dial

0.01
0.001

Calibration constant k, P=k

0.048

Bulk density (kg/m3)


Dry density (kg/m3)
qu (kPa)
cu (kPa)
Theoretical angle of failure plane with respect to the horiz. (deg.)

1904.6
1430.9
222.771
111.386
450
Deformation
dial reading
0
50
100
150
200
250
300
350
400
450
500
550
600
650
700
750
800
850
900
950
1000
1050
1100
1150
1200
1250

Load dial
reading
0
82
140
175
210
243
270
295
320
343
362
378
395
413
423
440
455
470
480
494
505
520
530
544
555
564

Sample
deformation
L (mm)
0.000
0.500
1.000
1.500
2.000
2.500
3.000
3.500
4.000
4.500
5.000
5.500
6.000
6.500
7.000
7.500
8.000
8.500
9.000
9.500
10.000
10.500
11.000
11.500
12.000
12.500

Vertical
Strain, 1=
L/Lo
0.000
0.005
0.009
0.014
0.018
0.023
0.027
0.032
0.036
0.041
0.045
0.050
0.055
0.059
0.064
0.068
0.073
0.077
0.082
0.086
0.091
0.095
0.100
0.105
0.109
0.114

1300
1350
1400
1450
1500
1550
1600
1650
1700
1750
1800
1850
1900
1950

568
575
580
590
592
605
610
612
615
620
625
627
628
630

13.000
13.500
14.000
14.500
15.000
15.500
16.000
16.500
17.000
17.500
18.000
18.500
19.000
19.500

0.118
0.123
0.127
0.132
0.136
0.141
0.145
0.150
0.155
0.159
0.164
0.168
0.173
0.177

Axial250
Stress (kPa)
222.771

200

150

100

50

0
0

0.02

0.04

0.06

0.08

0.1

0.12

Calibration of Proving Ring

1
2
3
4
5
6

(mm)
0.000
50.000
100.000
150.000
200.000
250.000

14
P (kgf)

P (kgf)
0.000
2.400
4.800
7.200
9.600
11.950

12
10
8
6
4
2
0
0

Area
Corrected
Total Axial
Correction
2
area
A
(mm
)
Load (kN)
Factor, 1 - 1
1.000
0.995
0.991
0.986
0.982
0.977
0.973
0.968
0.964
0.959
0.955
0.950
0.945
0.941
0.936
0.932
0.927
0.923
0.918
0.914
0.909
0.905
0.900
0.895
0.891
0.886

1104.911
1109.956
1115.048
1120.186
1125.372
1130.606
1135.890
1141.222
1146.605
1152.040
1157.526
1163.064
1168.656
1174.301
1180.002
1185.758
1191.570
1197.440
1203.368
1209.355
1215.402
1221.509
1227.679
1233.910
1240.206
1246.566

0.000
0.039
0.066
0.082
0.099
0.114
0.127
0.139
0.151
0.162
0.170
0.178
0.186
0.194
0.199
0.207
0.214
0.221
0.226
0.233
0.238
0.245
0.250
0.256
0.261
0.266

Compressive
Stress (kPa)
0.000
34.787
59.121
73.563
87.869
101.206
111.928
121.720
131.415
140.196
147.261
153.038
159.155
165.608
168.798
174.730
179.805
184.822
187.825
192.346
195.651
200.455
203.283
207.599
210.722
213.046

50

100

150

200

250 300
(mm)

0.06

0.882
0.877
0.873
0.868
0.864
0.859
0.855
0.850
0.845
0.841
0.836
0.832
0.827
0.823

0.08

0.1

1252.992
1259.484
1266.044
1272.672
1279.370
1286.139
1292.981
1299.895
1306.884
1313.948
1321.089
1328.308
1335.606
1342.985

0.12

0.14

0.267
0.271
0.273
0.278
0.279
0.285
0.287
0.288
0.290
0.292
0.294
0.295
0.296
0.297

0.16

213.457
214.974
215.720
218.296
217.889
221.502
222.151
221.694
221.589
222.190
222.771
222.269
221.407
220.892

0.18

0.2

Vertical Strain (%)

Insert a sketch showing the failure plane here.

45
0

Soil description Fine sand

Test No
1
2
3

Internal diameter of the permeameter, D (mm)


Length of sample between the nipple points, L (mm)
Weight of container + soil used + soil remaining (g)
Weight of container + soil remaining (g)
Weight of soil used, W s (assumed Gs = 2.65) (g)
20 (mPa.s)
Volume of solids, Vs (cm3)
Total head difference at critical value
Critical hydraulic gradient (theoretical) for this test
Cretical hydraulic gradient (measured)

76.500
75.000
3295.00
1522.00
1773.00
1.002
669.057
24.5
1.067
1.089

Sample
Height
(cm)
23.5
23.0
22.5

Time (s)
30
30
30

Temp. (C) T (mPa.s)


30
30
30

0.798
0.798
0.798

0.05 of Permea
Coefficient

0.04

0.03

0.02

0.01

0
0

h1 (mm)
387
388
387

h2 (mm)

Q (ml/s)

456
457
457

1.77
1.43
1.20

Volume of
Volume of voids Void Ratio
Sample V = L A V = VV (cm3)
e=Vv/Vs
V
s
3
(cm )
1080.576
1057.585
1034.594

411.520
388.529
365.538

0.615
0.581
0.546

e3
0.233
0.196
0.163

Hydraulic
Gradient I=(h1 KT = q/Ai
(cm/s)
h2)/L
0.920
0.920
0.933

0.05 of Permeability (cm/s)


Coefficient

0.04

0.03

0.02

0.01

0
0

0.05

0.1

0.15

0.2

0.25
e3

0.042
0.034
0.028

K20 = KTT/20
(cm/s)
0.033
0.027
0.022

Soil description Silt,sandy silts clayey sands


Internal diameter of the permeameter, D (mm)
Length of sample between the nipple points, L (mm)
Cross sectional area of standpipe = 0.01875 cm2
Height, h1 (cm)
Height, h2 (cm)
T (mPa.s)
20 (mPa.s)

100.0
125.0
80.0
70.0
0.872
1.002

Test
Number
1
2
3
4
Average

Time, t Temperature ( K (cm/sec)


T
0
(min)
C)
1.62
1.35
2.05
1.7
1.68

28
28
28
28
28

4.098E-006
4.918E-006
3.238E-006
3.905E-006
4.040E-06

K20=
KTT/20
(cm/sec)
3.566E-006
4.280E-006
2.818E-006
3.398E-006
3.516E-006

Test
Colour
Dry strength
Dilantancy
Toughness
Plasticity
Classification
Soil type/description

Soil 1

Soil 2

Observations
White
High
None
High
High
inorganic fine-grained soil
Clay

Observations
Brown
High
Slow
High
Medium
inorganic fine-grained soil
Silt Clay

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

Soil description
To detemine the initial water content of borehold sample
Mass of can + wet soil (g)
Mass of can + dry soil (g)
Mass of can (g)
Initial water content (%)
To determine the initial dimensions of specimen
Average height of ring (mm)
Average diameter of ring (mm)
Loaded area (cm2)
To determine the height of solids - Hs
Mass of consolidation ring (g)
Mass of container (g)
Mass of ring + specimen without filter paper + container @ beginning of test (g)
Mass of ring + specimen without filter paper + container @ end of test (g)
Mass of container + oven dried specimen without filer paper (g)
Total change in dial reading dH (mm)
Height of water at end of test (mm)
Height of solids (mm)
Hence, initial void ratio, e0
Height of water at beginning of test (mm)
Degree of saturation at beginning of test (%)

Mass of top pressure pad + top porous plate (g)


Additional stress on specimen due to top pressure pad + top porous plate (kPa)
Load (kg)
Date

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

Load (kg)
Date

Load (kg)
Date

Load (kg)
Date

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

UnLoad (kg)
Date

UnLoad (kg)
Date

UnLoad (kg)
Date

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

1.400E-03
Coeffieient
of Consolidation cv (cm2/s)

1.200E-03

1.000E-03

8.000E-04

6.000E-04

4.000E-04

2.000E-04

0.000E+00

10.0

100.0
Effective vertical consolidation

Compression Index
Re-compression Index
Pre-consolidation Pressure (kPa)

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

An Undisturbed ,saturated fine grained soil sample

53.330
40.328
16.250
54.000

19.960
75.000
44.198

115.700
16.399
272.500
260.888
106.497
3.010
8.754
8.196
1.435
11.381
96.746

519.6
1.153
1.0
Tuesday, December 02, 2014

0.1 (mm)
Settlement

Elapsed time
(min.)

Clock time
9:20 AM
9:20 AM
9:20 AM
9:20 AM
9:21 AM
9:22 AM
9:24 AM
9:28 AM
9:35 AM
9:50 AM
10:20 AM
11:20 AM
1:20 PM
5:20 PM
9:07 AM

0
0.1
0.25
0.5
1
2
4
8
15
30
60
120
240
480
1440

Dial reading
(mm)

t (min)1/2

0.000
0.640
0.830
0.900
0.990
1.098
1.236
1.408
1.606
1.740
1.804
1.834
1.850
1.866
1.882

0.000
0.316
0.500
0.707
1.000
1.414
2.000
2.828
3.873
5.477
7.746
10.954
15.492
21.909
37.947

0.000
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
1.800
2.000

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

1.0

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

2.0
Wednesday, December 03, 2014

0.1

Settlement (mm)
Elapsed time
(min.)

Clock time
9:07 AM
9:07 AM
9:07 AM
9:07 AM
9:08 AM
9:09 AM
9:11 AM
9:15 AM
9:22 AM
9:37 AM
10:07 AM
11:07 AM
1:07 PM
5:07 PM
9:10 AM

0
0.1
0.25
0.5
1
2
4
8
15
30
60
120
240
480
1440

Dial reading
(mm)

t (min)1/2

1.882
1.980
2.000
2.020
2.050
2.096
2.160
2.238
2.314
2.382
2.424
2.452
2.472
2.484
2.502

0.000
0.316
0.500
0.707
1.000
1.414
2.000
2.828
3.873
5.477
7.746
10.954
15.492
21.909
37.947

4.0
Thursday, December 04, 2014

9:10 AM
9:10 AM
9:10 AM
9:10 AM
9:11 AM
9:12 AM
9:14 AM
9:18 AM
9:25 AM
9:40 AM
10:10 AM
11:10 AM
1:10 PM
5:10 PM
9:02 AM

2.500

3.000

0.1

1.0

Settlement (mm)

0
0.1
0.25
0.5
1
2
4
8
15
30
60
120
240
480
1440

Dial reading
(mm)

t (min)1/2

2.502
2.646
2.676
2.706
2.754
2.820
2.914
3.022
3.108
3.172
3.210
3.238
3.258
3.274
3.290

0.000
0.316
0.500
0.707
1.000
1.414
2.000
2.828
3.873
5.477
7.746
10.954
15.492
21.909
37.947

8.0
Friday, December 05, 2014

Clock time

2.000

2.500

Elapsed time
(min.)

Clock time

1.0

1.500

3.000

3.500

0.1

Settlement (mm)
Elapsed time
(min.)

Dial reading
(mm)

3.400

t (min)1/2
3.600

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda


3.800

0.1

Settlement (mm)

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

3.400

3.600

9:02 AM
9:02 AM
9:02 AM
9:02 AM
9:03 AM
9:04 AM
9:06 AM
9:10 AM
9:17 AM
9:32 AM
10:02 AM
11:02 AM
1:02 PM
5:02 PM
9:02 AM

0
0.1
0.25
0.5
1
2
4
8
15
30
60
120
240
480
1440

3.290
3.468
3.512
3.556
3.620
3.704
3.810
3.910
3.976
4.018
4.052
4.076
4.100
4.118
4.136

0.000
0.316
0.500
0.707
1.000
1.414
2.000
2.828
3.873
5.477
7.746
10.954
15.492
21.909
37.947

3.800

4.000

4.200

4.400

4.0
Saturday, December 06, 2014
Elapsed time
(min.)

Clock time
9:10 AM
9:10 AM

0
1440

Dial reading
(mm)
4.136
3.868

1.0
Sunday, December 07, 2014
Elapsed time
(min.)

Clock time
9:15 AM
9:06 AM

0
1431

Dial reading
(mm)
3.868
3.614

0.0
Monday, December 08, 2014
Elapsed time
(min.)

Clock time
9:10 AM
9:15 AM

0
1445

Dial reading
(mm)
3.614
3.010

Load (kg)

vo kPa

dH

t90 s

0
1
2

1.153
23.349
45.544

1.882
2.502

1.206
1.130

1353.75
1297.35

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

4
8
4
1
0

89.935
178.716
89.935
23.349
1.153

3.290
4.136
3.868
3.614
3.010

1.034
0.931
0.963
0.994
1.068

960
735

1.250
Void Ratio

1.200

1.150

1.100

Log
Root

1.050

1.000

0.950

0.930
0.900

100.0

1.0

Effective vertical consolidation stress (kPa)

0.349
0.126
47.5

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

0.1 (mm)
Settlement
0.000

1.0

2.4
5

10.0

100.0

1000.0

Time (min)

10000.0

0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
1.800
2.000

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

0.1

1.0

6.
5

1.500

Settlement (mm)

10.0

100.0

1000.0

10000.0

10.0

100.0

1000.0

10000.0

Time (min)

2.000

2.500

3.000

0.1

1.0

2.500

ttlement (mm)

4.
3

Time (min)

3.000

3.500

Settlement (mm)

0.1

1.0

3.400

10.0

100.0

1000.0

Time (min)

10000.0

3.
0

3.600

3.800

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Settlement (mm)

0.1

1.0

10.0

3.400

100.0

1000.0

Time (min)

10000.0

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

3.600

3.800

4.000

4.200

4.400

d mm

cv Root(t)
(cm)

t50 s

cv log(t)
(cm)

9.510
8.884

5.665E-04
5.159E-04

144
390

1.237E-03
3.987E-04

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

9.158
8.124

7.408E-04
7.614E-04

258
180

6.403E-04
7.222E-04

load
Polyn
omial
(load)
unloa
d

10.0

19.
9

47.
5

58.0

100.0

178.0

Effective vertical consolidation stress (kPa)

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

e (min)

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

4.7
54

0
10000.0

12

16

20

24

28

32

36

40

44

48

0.000

Settlement (mm)
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
1.800
2.000

Time (min)1/2

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

10000.0

Time (min)

4.6
5

12

16

20

24

28

32

36

40

44

48

1.800

Settlement (mm)
1.900
2.000
2.100
2.200
2.300
2.400
2.500
2.600

Time (min)1/2

4.0

10000.0

Time (min)

12

16

20

24

28

32

36

40

44

48

2.400

Settlement (mm)
2.500
2.600
2.700
2.800
2.900
3.000
3.100
3.200
3.300
3.400

Time (min)1/2

Time (min)

10000.0

3.5
04

12

16

20

24

28

32

36

40

44

48

3.200

Settlement (mm)
3.300
3.400
3.500
3.600
3.700

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Time (min)

10000.0

12

16

20

24

28

32

36

40

44

48

3.200

Settlement
Project: Soil Investigation
at Bridge(mm)
No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m
3.300
3.400
3.500
3.600
3.700
3.800
3.900
4.000
4.100
4.200

Time (min)1/2

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

load
Polyn
omial
(load)
unloa
d

.0

ss (kPa)

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

36

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

40

44

48

Time (min)1/2

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

36

36

36

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

40

44

48

Time (min)1/2

40

44

48

Time (min)1/2

40

44

48

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

36

40

44

48

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

Time (min)1/2

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

Project: Soil Investigation at Bridge No. 70.Borehole No. 1, Sample No.: 1Depth: 3.00-3.50 m

Geotechnical LaboratoryDepartment of Civil EngineeringOpen University, Nawala, Nugegoda

You might also like