DECLARATION
I hereby declare that the seminar report which is being presented in the entitled, CONTROL
Date:
ii
ABSTRACT
NTPC was set up in 7th November 1975, the MAHARATNA power giant today generates more
than one fourth of the total power in the country, Ranked 5th largest power generating utility in
the world.
NTPC is the second most efficient in capacity utilization among the top ten thermal generating
companies according to a survey conducted by Data Monitor, United kingdom. NTPC ranked
341st in the 2010, Forbes Global 2000 ranking of the Worlds biggest companies.
With a current generating capacity of 34,854 MW, NTPC has embarked on plans to become a
75,000 MW company by 2017.
The control and instrumentation department is the brain of the
plant because from the
relays to transmitters followed by the electronic computation chipsets and recorders and lastly
the controlling circuitry, all fall under this.
This division also calibrates various instruments and takes care of any faults occurring in any of
the auxiliaries in the plant provided for all the equipments. Tripping can be considered as the
series of instructions connected through OR GATE. The main equipments of this laboratories are
relay and circuit breakers.
iii
ACKNOWLEDGEMENT
I have taken efforts in this Industrial Training . However, it would not have been possible without
the kind support and help of many individuals and organizations. I am grateful to the staff and
management for letting me pursue my four weeks industrial training at the department of control
and instrumentation.
I am grateful for the explanation given to me by the staff of NTPC-SINGRAULI and helping me
become aware of the technology in the real world .The training I had received here has helped
me immensely in understanding the practical concepts of communication. I would like to extend
my sincere thanks to all of them.
I am highly indebted to Mr. Ashutosh Kumar Singh and Mr. Prabhakar Agarwal for their
guidance and constant supervision as well as for providing necessary information regarding the
Industrial Training Report.
iv
TABLE OF CONTENT
Page No.
Declaration
ii
Abstract
iii
Certificate
iv
Acknowledgement
Table of content
vi-vii
List of figures
viii
2-7
3
4
6
7
8
2.1 Introduction
2.2 Classification
2.3 Functioning
2.4 Process of Power Generation
2.5 Elements of thermal power station
CONTROL AND INSTRUMENTATION:3.1 Introduction
3.2 Objective of Control and instrumentation.
CONTROL AND MONITERING MECHANISM:4.1 Pressure monitoring
4.2 Control valves
4.3 Temperature Monitoring
4.4 Electrical method of temperature monitoring
LABS IN CONTROL AND INSTRUMENTATION DEPARTMENT:5.1 Manometry Lab
5.2 Protection and interlocking lab.
5.3 Automation Lab
POLLUTION CONTROL SYSTEM:CONCLUSION
BIBLIOGRAPHY
2
3
4
5
6-7
8-9
8
9
10-14
10-11
11-13
13
14
15-17
15
15-16
17
18
19
20
List of figure
FIGURE
Page no.
1
3
5
8
12
13
13
14
16
17
vi