Boundary Conditions
1 Soil Conditions
Difficult soil conditions (stratigraphy,
obstructions, existing slopes
etc.) require careful design and
planning and an appropriate
selection of the solution.
5
6
2 Ground water
6
7
4 Existing Buildings
Adjacent buildings must not be
damaged by the works. Particularly the
serviceability of the existing building
foundations must not be compromised,
which often requires additional support
and underpinning to secure them.
5 Underground services
Underground services such as sewage
and water pipes, power lines and
communication cables must remain
in service, especially in densely
populated areas such as city centers.
6 Traffic
Traffic flow should be hampered
as little as possible and existing
traffic infrastructure needs to be
protected against damage.
7 Varying excavation depths
Some projects require excavation
depths to vary across the site for a
range of solutions may be required.
Requirements
minimal impact on existing structures
no disturbance to running operations
optimum use of plot space
integration of the foundation system into the overall structure
minimal deflections even for deep excavation pits
conformity to environmental standards
efficient construction with optimum material utilization and minimal waste
monitoring with detailed records
close cooperation between owner, designer and foundation specialist
Excavation pits including protection of existing structures Excavation pits for infrastructure works
Solutions
Methods
1 Excavation
support systems
Diaphragm walls
King post walls
Bored pile walls
Shotcrete
Combined walls
(e.g. bored piles and Soilcrete)
Anchors
Soil nails
Internal steel struts
3 Base Slabs
Jet Grouting (Soilcrete)
Construction
Underwater concrete
One stop service for excavation pit, including in-house design and equipment
4 Uplift Tension
Bored piles
Micro piles
5 Protection of
existing facilities
Soilcrete-Underpinning
Continuous monitoring
Jet grouting
Soilfrac-Fan
6 Measurements
Monitoring
Control
Documentation
Reference Projects:
Excavation pits for residential buildings
2012 ESI Integrated Steel Plant, Phase 2B, Abu Dhabi, UAE
2012 Residence Wlassakstrae, Vienna, Austria
2012 Accommodation Block, Featherstone Prison, UK
2011 Nass Centre, Zubara Ave, Manama, Bahrain
2011 Ministry of Finance, 6 storey building, Manama, Bahrain
2011 Sheet piling excavation pit Goldenes Haus (residence), Berlin, Germany
2011 Villa Lieta, Verona, Italy
2011 Residence in Libesky Pivovar, Czech Republic
2010 ESI Heavy Section Mill, Abu Dhabi, UAE
2010 Department store Aupark, Koice, Slovakia
2009 Difaaf Development, Reef Island, Manama, Bahrain
2009 Residence Dunajska 4250, Bratislava, Slovakia
2009 Residence in Podkoz, Czech Republic
2008 TSM-shoring, Pergamon Palais Am Kupfergraben
(Residential and commercial building), Berlin, Germany
2008 Donauzentrum BT7, Vienna, Austria
2008 Residenza La Scala, Ponte Tresa (VA), Italy