SHIFT NOTE

Definition
A shift note is a comment for a work center on an event that cannot be entered elsewhere in the
system. You can enter the exact point in time (timespot) at or the period during which the event
occurred in the shift note.
Examples of such comments are:
Information relating to a production order
Information relating to a material
In addition, you can use this to create and process shift notes and shift reports for technical
objects within plant maintenance.
You can enter shift notes and create shift reports to document all important information and events
pertinent to or occurring within a shift.
Improved confirmation transactions enable you to monitor and analyze production-related data on a
detailed basis for PP Module only

Use
You must always create a shift note with reference to a work center, a hierarchy, or a PI
resource.
The following functions are available for shift notes:
Create Shift Note
Display and Change Shift Note
Add and Remove Attachments
List Shift Notes
Send Shift Note as E-Mail
Print Shift Notes
Create PDF

Structure
If you have made the appropriate settins in Customizing in the IMG activity Define Shift Note Type,
the shift note comprises the following:
Number of shift note
Data on work center
Event
You can specify whether you want to enter times for an event. In doing so, you can choose whether
you want to enter the exact point in time (timespot) or, in the case of longer-lasting events, the time
period (duration).
Category
You can sudivide your shift notes into categories. In Customizing, you can enter a code group with a
corresponding catalog. In the shift note, the short texts of the codes belonging to the code group are
then offered as input help for the Category field.

Reference object
You can enter shift notes on a targeted basis with reference to certain objects such as
production orders, maintenance notifications etc.
Long text
You enter comments in this area. You can use standard text modules to simplify the entry process. In
doing so, you can specify standard texts with reference to a business object. These standard texts are
then immediately suggested when you enter a shift note.
Attachments
In the Attachments area, you can add various documents such as Word documents or Excel files as
attachments.

Integration
You can include the shift notes you have created for a work center in a shift report. The shift notes
then appear in the Shift Notes section of the shift report. In order for the system to be able to find the
shift notes for the shift report, a shift note typemust be entered in the work center or hierarchy.

SHIFT REPORT/SHIFT NOTES,


CONFIRMATION
Technical Data
Technical name of business function

LOG_PP_SRN_CONF

Type of business function

Enterprise Business Function

Available as of

SAP ERP 6.0 Enhancement Package


3

Technical usage

Central applications

Application component

Confirmations PP-SFC-EXE-CON
Order realization PP-PI-POR-OPC

Dependent business function that you must additionally


activate

Not relevant

This business function enables you to create and process shift notes and shift reports for work centers
and hierarchies and utilize enhancements in the area of production and process order confirmations
The business function is suitable for customers in discrete manufacturing and process industries.
Integration
You create shift notes and shift reports with reference to a work center, a hierarchy, or a resource.
The following existing confirmation transactions for process and production orders have been
enhanced:
Enter time ticket for production order (CO11N9

Enter time ticket for process order (COR6N)

Enter confirmation for production order (CO15)

Enter confirmation for process order (CORK)

Display confirmation (CO14/ CORT)

Cancel confirmation (CO13/CORS)

Prerequisites
You have installed the following components as of the named version:
Type of component

Component

Software component

SAP_APPL 603, EA_APPL


603

Technical component or business


content, e.g. Portal Content

Java stack for Adobe


document services

Needed for the following


functions only

Only for shift report and


printing of shift notes

You make the necessary settings for shift reports and shift notes in Customizing under
Logistics General under Settings for Shift Notes or Settings for Shift Reports.
You make the necessary settings for the new functions for confirmations under Production
Planning Shop Floor Control Operations Confirmation or under Production Planning for
the Process Industry Process Order Operations Confirmation .

Features

Shift Reports and Shift Notes for Work Centers and Hierarchies
In a shift note, you can enter a brief comment on an event that you cannot enter elsewhere (in a
confirmation or maintenance notification, for instance).
In a shift report, you can collect all important information pertaining to a shift for a certain work center.

Shift Reports and Shift Notes for Technical Objects


You can also enter shift notes and shift reports for the technical objects of plant maintenance.
For more information, refer to Shift Reports and Shift Notes for Technical Objects.

Confirmation Enhancements

Shift-related confirmation

You can use the shift-related confirmation to track the quantities produced in a certain shift or
to determine which shift produced the most scrap, for example.
Subdivision of quantity fields

You can subdivide the quantity fields Yield, Scrap, and Rework into further fields in order to
enter and evaluate certain quantities on a targeted basis. Thus, for example, you can
subdivide the Scrap field into several scrap fields (e.g. scrap due to bent parts, scrap due to
scratched parts, etc.)
Customer-specific fields

You can enhance the confirmation transactions by adding further customer-specific fields in
order to collect additional data for your analyses.
Automatic generation of quality notifications
To optimize the evaluations of faulty materials produced, you can specify that the system is to
automatically create quality notifications when the incidence of srap is confirmed. On the
basis of these quality notifications, you can investigate why there has been a higher incidence
of scrap for a certain material for example. You can also specify that the system is to
automatically create a quality notification for the confirmation of good quantities (yield) and
rework.

Shift Reports And Shift Notes For


Technical Objects
Use
You can use shift notes and shift reports to enter and evaluate special events that occur within a shift
for technical objects.
You use a shift note to create comments about a person, machine, or other special points that cannot
be entered elsewhere in the system.
The person responsible for a shift generates a shift report manually at the end of a shift, as a PDF
document, as a way of documenting and subsequently evaluating all the confirmations and shift notes
entered during the shift, for example.
You can also include the following objects in the shift report:
Maintenance orders
Maintenance notifications
WCM objects
Measurement documents
There are two new authorization objects for controlling which activities a user can perform for shift
reports:
C_COCF_SRF
Authorization object for shift reports that are created with reference to functional locations.
C_COCF_SRE
Authorization object for shift reports that are created with reference to equipment.
The following authorization objects are also available for shift notes and shift reports:
C_COCF_SRA
Authorization object for shift reports and shift notes that are created with reference to a work center.
C_COCF_SRH
Authorization object for shift reports and shift notes that are created with reference to a hierarchy.
For more information, see

Shift Reports and Shift Notes.

Prerequisites
You have defined the Customizing settings for shift notes and shift reports for technical objects, under
Plant Maintenance and Customer Service Maintenance and Service Processing Shift Reports
and Shift Notes.

Creation And Processing Of Shift Notes


Use
The following transactions are available for the creation and processing of shift notes:
Transaction Code

Transaction

SHN1

Create shift note

SHN2

Change shift note

SHN3

Display shift note

SHN4

List shift reports

Prerequisites
You have created a shift note type and have specified how this type of shift note is to look. See also:
Settings for the Shift Note Type
To be able to choose a category in the shift note, you must check the category in the IMG activity
Maintain Catalogs or create a new catalog type that you want to use as the category. In the IMG
activity Define Shift Note Type, you must set the Category indicator and assign the desired catalog
type in the Catalog Type field. In the Code Group field, you must choose an appropriatecode group.
You have assigned the reference objects to the shift note type.
You have entered the shift note type in the work center for which you want to enter shift notes.

Features
The following processing functions are available:
Enter Event Time
You can enter the date and time on and at which the event to be reported occurred.
Choose Category (and display information on it)
If you have previously defined a long text for the code in Customizing, you can enter the shift note
with reference to a category and display further information on the category using the Information
function key.
Choose Reference Object (and display information on it)
You can assign a business object to the shift note as a reference objectand display the assigned
object.
You choose the reference objectmaterial and specify the relevant material number. Use the Display
Object function key to access the master record for the material entered.
Track Changes
Create PDF
Send Shift Note as E-Mail
Delete Shift Note
Use Full-Text Search

Customizing for shift note:


SPRO SAP Customizing Implementation GuideLogistics General Make
Settings for Shift Notes (SHN0)

Make Settings for Shift NotesDefine Notification Types

Make Settings for Shift NotesDefine Number Ranges

Make Settings for Shift NotesDefine Screen Templates


Note: Here N1 refers to SN notification type. SN was configured wrongly so
created N1

Shift Note and Shift Note attachment Screen 130and 131 to be


assigned. Very important.

Priorities and Catalog maintained if essential . Configuration Similar to how we do


for any general maintenance notification configuration.

Make Settings for Shift NotesDefine Shifts

Make Settings for Shift NotesMake Settings for Shift Note Type

Customizing Step SHN0


Create SHN1
Change SHN2
Display SHN3

After Save, PDF displayed

Cont.

Additional information about customizing

Settings For The Shift Note Type


Use
To be able to enter shift notes, you must have previously defined a shift note type in Customizing. The
shift note type defines which information is to be displayed in the shift note and which fields and
purshbuttons are to be offered for the entry of data.

Prerequisites
You have created a new notification type for the shift note. More information on creating the
notification type is available in Customizing under Logistics General Make Settings for Shift Notes
Make Settings for Shift Notes.
If you want to choose a category in the shift note, you must check the catalog type and the code
group that you want to use for the shift note in the IMG activity Maintain Catalogs. However, you can
also create new entries.
If you want to use standard texts (text modules) when entering the shift notes, you must perform the
following steps:

Create text IDs for the text object TEXT using transaction SE75 in order
to be able to group together certain text modules.
Create a standard text (text module).To do so, starting from the SAP Easy
Access Menu, choose Tools Form Printout SAPscript Standard Text
and enter a text. Assign this text a text ID.

Procedure
1. Call up the IMG activity Settings for Shift Note Type. Choose New Entries and
choose the previously created notification type using the input help.
1. 2. Specify the details for the shift note type. With these, you define the fields
and information that are to be shown when a shift note is entered.

Number of shift note


Origin
With the Origin indicator, you specify that information on the work center is
to be displayed.

Event
With the Event indicator, you specify that the fields for entering the
timespot or time period at or during which an event occurred are to be
shown. See also: Entering the Event Time

Category
If you set this indicator, theCategory field appears with an input help in the
shift note. You can define the content of the input help using the Catalog
Type and Code Group fields.

Reference object

Here you specify whether theReference Object field is to be offered during


the entry process. You can then enter shift notes with reference to certain
objects such as production orders, maintenance notifications, etc. You
define the reference objects that are to be offered in the input help in the
shift notice in the Reference Objectsarea.

Long text
This indicator must be set before you can enter a long text in the shift note.

Specify that the system is to log changes in the long text by setting the
Track Changes indicator. See also: Change Tracking
In the Number of Characters field, you can limit the long text that is to
be entered to a certain number of characters. This applies to each
invocation of the shift note. If you invoke the note again in change mode,
you can again enter the same number of characters.
If you do not stipulate a value, the user can enter texts of unlimited length.

Text ID
Here you can specify a text ID. You can create one or more text modules for
the text ID, which you can then use in the shift note to minimize the entry
effort.
However, the system offers these text modules for selection in the shift
note only if you enter the latter without a reference object. If you specify a
reference object in the shift note, the system does not suggest any text
modules. If you want to work with text modules, you must specify a
separate text ID for each reference object.

Text name
If you want to use standard texts without assigning a reference object when
entering the shift note, you can specify a standard text in the Text Name
field. The system then suggests this text as the long text when shift notes
are entered.

Attachments
You use this indicator to specify that the Attachments area is to be
displayed in the processing transactions for the shift note. The system then
shows the Attachmentsarea in the lower half of the Shift Note screen. You
can then add documents as attachments to the shift note.
You must also specify adocument type and a storage category. See also:
Adding and Removing Attachments

Show pushbuttons:

Send E-Mail
You use this indicator to specify whether the shift notes can be sent as emails. See also: Send Shift Note as E-Mail

PDF form
In this field, you specify the PDF form that the system is to use for the
shift notes. See also: Create PDF

Generic object services


This indicator enables you to show generic object services in the
processing transactions for the shift note. See also: Use of Generic Object
Services

2. 3. Double-click on Usage.
Here you specify whether or not the shift note type is to be used as an independent shift note. If you
select the Independent Shift Note option, you can no longer process the selected notification type
using the standard transactions for notifications. You must then use the transactions for processing
shift notes (SHN1, SHN2, SHN3).
If you have selected theScreen Area of Notification option, the shift note area is used within the
selected notification type but you must use the standard transactions for notifications to create or
change the notification.
The content of a notification belonging to this notification type can nevertheless be shown in the shift
report.

3. 4. Double-click on Reference Objects.


In this area, you assign business objects as reference objects for the shift note type. With the
reference objects, you define the business objects for which you want to enter shift notes. If you
assign the reference object production order, for example, when entering a shift note you can specify
that it relates to a production order.
You can assign the following reference objects to a shift note type under Reference Objects, for
example:

BUS1001 Material
BUS1001002 Batch
BUS2004 Planned Order
BUS2005 Production Order
BUS0001 Process Order
BUS2116 Production Order Confirmation
BUS2016 Process Order Confirmation
BUS2038 Maintenance Notification
BUS2007 Maintenance Order
EQUI Equipment
BUS0010 Functional Location

For PM Notification type details are:

Settings for Notification Type 'PM Notification'


Use
This procedure describes how to create a new shift note type based on a notification type for the Plant
Maintenance (PM) notification. This has the advantage that you can use the status tracking facility
from the PM notification in addition to the functions of the shift note.

In this case, you must enter and process the shift notes with the transactions for the simple view of
the maintenance notifications (IQS21, IQS22 und IQS23). You cannot use the transactions for the
shift notes (SHN1, SHN2, SHN3).
The procedure described here is only an example of how to create a shift note type based on the
notification type for maintenance notifications for the simple view. However, you can also create a shift
note type for the extended view (transactions IQS1, IQS2, IQS3).

Procedure
1. ...
4. 1. To create the notification type, chooseNotification Notification Creation
Notification Type Define Notification Types in Customizing for the CrossApplication Components.
You create a new entry with the following settings:

1. a. Notification Type: e.g. SP


2. b. Notification Origin: General PM Notification
3. c. Catalog Profile: 000000001GeneralCatalog Profile
5. 2. To define the number range for your notifications, invoke the IMG activity
Define Number Rangesunder Notification Type.
Choose the Maintain Groups function key, then assign the new notification type SPto the number
range of the maintenance notifications.

6. 3. Under Notification Type Define Screen Templates, you must then doubleclick on Define Screen Areas and Tabs. In the list of notification types, select
the entry SP and double-click on Notification Header: Screen Areas. You must
make the following settings for the notification header:
Screen Type Header: H100 Header for Maintenance Notification
Screen Type Object: O100 Functional Location+Equipment+Assembly
Then double-click on Simplified View: Screen Areas.
Make the following settings for the simple view:
Tab Page Allocatn: 3
Screen Area 1: 130 Shift Note(mandatory entry)
Screen Area 2: 010 Responsibilities
Screen Area 3: 045 Actions

7. 4. In this workstep, choose Notification Type Define Transaction Start


Values.
The overview screen for the possible start transactions appears.
Select transaction IQS21 and chooseDetail.
The detail view appears. Here you must set the Proc.Initial Screen indicator.
By setting this indicator, you make it possible to choose the new notification type SP on the initial
screen of transaction IQS21.
If you enter SP in theNotification Type field here, the system will automatically suggest SP when
transaction IQS21 is invoked.

Alternatively, in the IMG activity Allowed Change of Notification Type, you can specify the notification
type previously set up in the IMG activity Define Transaction Start Values and additionally specify SP
as the target notification type. This enables you to simply switch the notification type using the
Change pushbutton when you invoke the notification.

8. 5. In this workstep, you must specify the Priority. To do so, chooseNotification


Notification Processing Response Control Define Priority and then
choose the entry Priority Type for Notification Type. The Change Priority Type
per Notification Type screen appears. You must then select the notification
type SP and choose Detail. On the detail screen, you assign a priority type to
the notification type(such as the priority type PM ICH Order Priorities).
9. 6. In this step, you assign the notification type SP to a catalog if necessary. To
do so, chooseNotification Notification Creation Notification Content
Catalogs and Catalog Profiles for Notification Type. You can then choose a
catalog.
10.7. In Customizing for the Shift Note, you must create a new entry for SP in the
IMG activityDefine Shift Note Type.
You make the settings for theshift note typeSP as described underSettings for the Shift Note Type.
Very Important:
Only in the Usagearea must you make the following settings:
Select theScreen Area of a Notification. In the Origin field, choose the entry Work
Center/Hierarchy.
The reference objects are freely selectable.
If none of the screen areas added under workstep 3 contains a work center, you must set the
Originindicator on the detail screen of the shift note type. Only if you have set the indicator can you
later assign a work center when entering the notification.

11.8. In the last step, you must enterSP in the Shift Note Typefield in the work
center.
Result
You can now enter a shift note with thenotification type SP in transaction IQS21.
The notification entered is displayed as a shift note in a shift report only if you have entered the work
center that you assigned to the shift note type SP in step 8 in the notification.

Shift Report
Shift report

The shift report is a PDF document that the person responsible for the shift can generate manually at
the end of a shift after all confirmations and shift notes etc. have been entered

Shift Report
Definition
A PDF document that is created manually by the production supervisor after completion of data entry
for the preceding shift. You cannot change the shift report manually. Shift Report is not created
manually,it is only generated from shift notes.

Use
The shift report serves to collect all the important information on a work center, a hierarchy, or a PI
resource in a shift. The shift report thus facilitates shift handover.

Structure
The shift report can consist of the following sections:
Cover page
The cover page contains the header data on the shift report (such as plant, work center, shift, and
period of entry).
List of shift notes
This section contains a list of all shift notes that were created during the entry period of the shift
report.
In addition, you can group the shift notes in the shift report according to various criteria, such as plant
and creator. See also: Grouping of Shift Notes in Shift Report.
Confirmations

List of confirmations
This section contains a list of all confirmations that were created during the
entry period of the shift report.

List of aggregated quantities


In this section, the confirmed yields (good quantities), scrap, and rework is
displayed in cumulated form.

List of aggregated activities


In this section, the confirmed production activities are displayed in
cumulated form.

List of goods movements


In this section, all goods movements posted for the confirmations are shown
in cumulated form.

Maintenance notifications
Customer's own data
You can define a separate section in the shift report in which you can display your own texts and
tables. See also: Inserting Customer's Own Texts and Tables
Graphical evaluations

You specify which of this information is to form part of the shift report and which layout is to be used
for the PDF document in Customizing for the Shift Report. See also: Settings for the Shift Report

Integration
You can also invoke the shift report starting from the iView Shift Reports in theBusiness Package for
the Production Supervisor..

Settings for the Shift Report


Use
In the IMG activity Define Shift Report Types, you define how the shift reports are to look after
generation and which data the report is to contain.

Prerequisites
You have defined a signature strategy if the shift reports have to be signed. See also: Digital
Signature in the Shift Report
If the shift report is to contain the section List of Aggregated Activities, you can define the unit in
which the activities are to be displayed in the work center in the costing view. If you do not specify a
unit in the work center, the system uses the unit that you specified in the confirmation.

Activities
12.1. You create the shift report type.
If you need different kinds of shift reports that have to be structured differently due to differing
requirements at the work centers, you must create several report types.

13.2. You make the settings for the shift report type:

Whether the shift reports are to be without gaps


Whether the shift report always has to be checked
If you have set the indicator and invoke an existing shift report, the system
uses an SHA1 check sum to check whether the shift report has been
changed since the last saving.

Whether the shift reports have to be signed


Whether just one active shift report is allowed
If you have set the indictor, the system can only create a new shift report
for a work center or hierarchy if the previous shift reports have been
completed.

Shift reports that have to be signed are not completed until the signature has been provided.
Completion of the preceding shift report is a precondition for the creation of the next one.
Shift reports that do not have to be signed are completed immediately after their generation.

Whether the system is to show the Send E-Mail function key in the
processing transactions for the shift report.

14.3. You define the content of the shift report.

Here you must assign a class and a PDF-based print form. The PDF-based print form predefines the
layout of the shift report. Separate Customizing is predefined for the standard classes. You invoke this
using the Customizing function key. For more information on this Customizing, refer to the IMG
documentation for the IMG activityDefine Shift Report Typesand Classes and Layouts for Shift
Reports.

IMG Settings:
SPRO SAP Customizing Implementation GuideLogistics GeneralMake
Settings for Shift Reports (SHR0)

SPRO SAP Customizing Implementation GuideLogistics GeneralMake


Settings for Shift Reports Define Shift Report Types

Click on Execute under customizing column to go to below screen:

Signature Strategies for Approval should be set


according to customer requirement

Shift Reports Tcode:


SHR0- Customizing step
SHR1- Create
SHR2-Change
SHR3-Display
Shift report is not created individually. It
generates automatically based on inputs like W/C
and time and fetches data from shift notes
entered in this period of time.
Tcode: SHR1

Preview:

Cont..

To generate:

Shift report generated

cont

Shift report status: Not saved.


Save to generate. But content repository need to be
configured to generate this report as save.