You are on page 1of 5

Residence at Addis Bill of quantities

SUMMARY
A. SUB STRUCTURE
1. Excavation and Earth Work

ETB

3. Concrete work

ETB

2. Masonry work

ETB

Sub Total A

97,758.

00
3.50

45,450.

00

ETB

145,31

288,521
.50

B. SUPER STRUCTURE
1. Concrete work

ETB

171,36
4.60

Sub Total B.

ETB

Total A + B

ETB

171,36

4.60
459,886
.10

Item No

Description

Unit

Qty.

1.1

A. SUBSTRUCTURE
1. Excavation & Earth work
Clear of the site to remove top soil to an average depth
of 20cm from NGL

m2

250.0
0

1.2

Bulk excavation in an ordinary soil to an average depth


of 20cm from NGL

m3

1.3
1.4

Excavation for isolated footing in an ordinary soil to a


depth not exceeding 2000mm from reduced ground level
Ditto but in soft rock

1.5
1.6

Trench excavation for masonry foundation wall to a depth


not exceeding 1000mm from reduced ground level.
Ditto but in soft rock

1.7

1.8

Fill around isolated footing & foundation with selected


granular material from outside of the site and well
compact in layer not exceeding 200mm.
Fill around masonry foundation wall with selected
material from the site well compact in layers not
exceeding 200mm.

1.9

Ditto but under hard core

1.1

Cart away and spread surplus excavation materials to a


distance not exceeding 2kms.

Rate

Amount

14.

3,500.0
0

350.0
0

70.0
0

24,500.0
0

m3

25.0
0

80.0
0

2,000.0
0
-

m3

23.2
5

80.0
0

1,860.
00
-

m3

15.
00

250.
00

3,750.0
0

m3

44.0
0
30.0
0

250.
00
250.
00

11,000.
00
7,500.0
0

m3

350.0
0

100.
00

35,000.0
0

m3

00

1.11

2.1

2.2

250mm thick sound stone hard core well rolled and


blinded with crushed stone.
Total Carried to Summary .....ETB
2. Concrete Works
50mm thick lean concrete in C-5 with minimum cement
content of 150kg/m3

m3

75.2
0

115.
00

8,648.0
0
97,758.0
0

m2

30.0
0

130.
00

3,900.0
0

2,600.
00
2,600.
00
2,600.
00
260.
00

22,750.0
0
3,952.0
0
17,550.
00
19,552.
00

185.
00
185.
00
185.
00

2,849.0
0
4,662.0
0
6,752.5
0

38.0

1,140.

Reinforced concrete in C-25 with minimum cement


content of 360kg/m3 cast into form work and well
vibrated around reinforcement bars in:
8.7
a. In isolated footings
b. In foundation column

2.3

m3

m3

1.5

c. In grade beam

m3

d. In 100mmthick ground floor slab


Supply cut in size and fix in position sawn zigba form
work to:

m2

a. To isolate footings
m2
b. To foundation column
m2
c. Grade beam
m2

2.4

6.7
5
75.2
0

15.
40
25.2
0
36.5
0

Reinforcement steel bars according to structural


drawings. Price includes cutting bending and placing
them in position.
a. Dia 6mm plain bar

kg

30.0

b. Dia 8mm deformed bar


kg
c. Dia 12mm deformed bar
kg
d. Dia 14mm deformed bar
kg
e. Dia 16mm deformed bar
kg
Total Carried to Summary ......ETB
3. Masonry
50cm thick hard trychitic or equivalent stone masonry
foundation wall bedded in cement mortar 1:3
3.1
3.2

m3
500mm thick ditto but above N-G level one side roughly
dressed

m3

0
564.0
0
216.
00
635.0
0
222.0
0

0
38.0
0
38.0
0
38.0
0
38.0
0

00
21,432.
00
8,208.0
0
24,130.
00
8,436.0
0
145,313.
50

18.
00
9.0
0

1,650.
00
1,750.
00

29,700.0
0
15,750.
00
45,450.0
0

4.0

2,650.
00
2,650.
00
2,650.

10,600.
00
39,458.5
0
31,800.

Total Carried to Summary ETB


B. SUPER STRUCTURE
1. Concrete works
Reinforced concrete in C-25 with minimum cement
content of 360 kg/m3 cast in to form work and well
vibrated around reinforcement bars.
1.1
a. Elevation columns
m3
b.in 150mm floor slab floor
c. In intermidate ,upper tie beam & lintel

m3
m3

0
14.
89
12.

00

1.2

00

d. in stare case
Supply cut in size and fix in position sawn zigba wood
form work for :a. Elevation columns
m2
b.in 150mm floor slab
m2
c. In upper tie beam & lintel
m2

00

68.0
0
99.2
6
90.2
0

185.
00
185.
00
185.
00

12,580.
00
18,363.
10
16,687.
00

20.0
0
535.0
0
547.0
0
1,530.
00

38.0
0
38.0
0
38.0
0
38.0
0

760.0
0
20,330.0
0
20,786.0
0
58,140.
00

Reinforcement bars according to drawings price includes


cutting, bending placing in position and tying wires.
1.3
a. Dia 6mm plain bar
kg
b. Dia 8mm deformed bar
kg
c. Dia 10mm deformed bar
kg
e. Dia 14mm deformed bar
kg
Total Carried to
Summary .............................................................................................
.......................ETB

171,364.
60

You might also like