Obra:
FORTALECIMIENTO DE LA ATENCION Y MANEJO INTEGRAL DE PACIENTES CON TBC EN EL HOSPITAL REGIONAL DE ICA
PROPIETARIO
Dpto.:
A.
CARACTERISTICAS
Costo directo:
Gastos Generales:
Variables
Gastos Generales:
Fijos
Utilidad:
Monto estimado de obra:(s/imp.)
S/.
S/.
S/.
S/.
S/.
( 8.36% )
( 0.16% )
( 10.00% )
835,049.66
69,810.15
1,336.08
83,504.97
989,700.86
4.00
Tiempo
Residente de Obra
Guardian
Almacenero
4.00
4.00
4.00
Costo
Participacin
5,000.00
1,000.00
900.00
Costo
100.00%
100.00%
100.00%
Porcentaje
27,600.00
48.30%
Parcial
20,000.00
4,000.00
3,600.00
Total
27,600.00
Parcial
13,330.80
SUB-TOTAL (1.01)
13,330.80
40,930.80
40,930.80
Tiempo
4.00
4.00
4.00
4.00
Costo
4,000.00
3,200.00
1,000.00
2,400.00
Participacin
10.00%
10.00%
10.00%
10.00%
Costo
Porcentaje
4,240.00
c) Varios
Alquiler sede central
Utiles de oficina y dibujo
Telfono y telefax
Computadora e impresora
Fotocopia de planos y otros
Cartel de Obra
Alquiler de Camioneta 4x4 doble cabina
Alquiler de SS.HH.Tipo Diessal (2udX 5mes
Seguros y Polizas (3 personas)
4.00
4.00
4.00
4.00
4.00
1.00
4.00
4.00
4.00
Costo
500.00
411.38
300.00
230.00
400.00
680.00
5,000.00
554.62
750.00
48.30%
Porcentaje
10.00%
10.00%
10.00%
10.00%
10.00%
100.00%
30.00%
100.00%
100.00%
Parcial
1,600.00
1,280.00
400.00
960.00
4,240.00
Parcial
2,047.92
2,047.92
Parcial
200.00
164.55
120.00
92.00
160.00
680.00
6,000.00
2,218.48
3,000.00
12,635.03
18,922.95
SUB-TOTAL (2.01)
Total 2.00. Administracin y Generales de Oficina S/.
18,922.95
Tiempo
4.00
Monto
197,940.17
Tasa
0.2600%
Parcial
2,058.58
2,058.58
Tiempo
4.00
Monto
395,880.34
Tasa
0.2600%
Parcial
4,117.16
4,117.16
Tiempo
Monto
Tasa
Parcial
FORTALECIMIENTO DE LA ATENCION Y MANEJO INTEGRAL DE PACIENTES CON TBC EN EL HOSPITAL REGIONAL DE ICA
PROPIETARIO
Dpto.:
( 10.00% )
7.00
3.20 Tributos
a) Sencico
98,970.09
Sub-Total ( 3.10 )
0.2600%
1,801.26
S/.
1,801.26
7,977.00
Monto
989,700.86
Sub-Total ( 3.20 )
Tasa
0.2000%
Parcial
1,979.40
S/.
1,979.40
1,979.40
S/.
9,956.40
S/.
S/.
S/.
S/.
Total
40,930.80
18,922.95
9,956.40
69,810.15
Und
Cantidad
Costo
Parcial
est.
51.00
5.02
est.
2.00
16.81
33.62
Diseo de mezcla
est.
3.00
319.33
957.99
est.
3.00
Sub-Total (1.00)
29.46
88.37
1,336.08
S/.
S/.
Total
1,336.08
1,336.08
RESUMEN GENERAL
INCIDENCIA DE GASTOS GENERALES
VARIABLES:
FIJOS:
TOTAL:
Monto
69,810.15
1,336.08
71,146.23
256.10
Porcentaje
8.36%
0.16%
8.52%
0.00
69,810.15
69,810.162
8.3600%
0.1600%
8.52%
0.00
0.00
1.90
71,146.23
71,146.23
121.90
DIA
ALFA TAURO
A&S SEGURIDAD
5,380.80
4,200.00
NOCHE
2,188.92
1,500.00
7,569.72
5,700.00
13,269.72
2.00
6,634.86
18,620.96
0.00
0.00
0.00
VALOR
Proyecto:
Ubicacin
Propietario
Fecha Base
COSTO
DIRECTO
GG.
8.520%
UTLD.
10.00%
COSTO
PARCIAL
IGV
19.00%
TOTAL
ESTRUCTURAS
330,662.68
28,172.46
33,066.27
391,901.41
74,461.27
466,362.68
ARQUITECTURA
315,257.28
26,859.92
31,525.73
373,642.93
70,992.16
444,635.09
INSTALACIONES SANITARIAS
56,204.94
4,788.66
5,620.49
66,614.09
12,656.68
79,270.77
INST. ELECTRICAS
78,164.65
6,659.63
7,816.47
92,640.75
17,601.74
110,242.49
INST. MECANICAS
54,760.11
4,665.56
5,476.01
64,901.68
12,331.32
77,233.00
TOTAL PRESUPUESTO
835,049.66
989,700.86
188,043.17
1,177,744.03
DESCRIPCION
71,146.23
83,504.97
SON: UN MILLON CIENTO SETENTA Y SIETE MIL SETECIENTOS CUARENTA Y CUATRO CON 03/100 NUEVOS SOLES