Professional Documents
Culture Documents
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
* Tipo de Sistema :
* Tasa de Crecimiento (%)
34.00
31 Fam
Institucin Educativa
1 Fam
Piletas Publicas
N de Familias (Terico) :
2 Fam
34.00 Fam
80.00
PROYECTO: "CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGU
DE OXAMARCA, PROVINCIA DE CELENDN - CAJAMARCA"
DEP.: CAJAMARCA
PROYECT.:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
Sin arrastre
hidrulico
Dotacin
(Lts/Hab/da)
Con arrastre
hidrulico
Dotacin
(Lts/Hab/da)
Selva
Costa
Sierra
60 - 70
50 - 60
40- 50
100
90
80
Dotacin Seleccionad
80.00 Lt/Hab/Da
PROYECTO: "CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGU
DE OXAMARCA, PROVINCIA DE CELENDN - CAJAMARCA"
DEP.: CAJAMARCA
PROYECT.:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
* Densidad Poblacional
Segn padrn de beneficiarios y recabacin de informacin en situ, se estima que la
densidad poblacional promedio es de:
5.00 Hab/Fam
200
mbito Rural :
200.00
Hab
222
222
Donde :
- Pf : Poblacin Futura
- Pa : Poblacin Actual
- r : Coef. de crec. anual por mil habitantes
- t : Periodo de Diseo
mbito Rural :
222
Hab
0.206
0.206
Lts/Seg
0.268
1.30
Qmd = 1.30 * Qm =
mbito Rural :
0.267
0.268
Lts/Seg
0.412
=1.80 a 2.50
2.00
PROYECTO: "CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGU
DE OXAMARCA, PROVINCIA DE CELENDN - CAJAMARCA"
DEP.: CAJAMARCA
PROYECT.:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
Qmh = 2 * Qm =
mbito Rural :
0.411
0.412
Lts/Seg
PROYECTO: "CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGU
DE OXAMARCA, PROVINCIA DE CELENDN - CAJAMARCA"
DEP.: CAJAMARCA
PROYECT.:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
mbito Rural
Glb
Unit.
34.00
mbito Urbano
Glb
Unit.
No Corresponde
General
Glb
Unit.
40.00
Q. Promedio Anual:
0.206
0.0060
0.206 Lts/Seg
Q. Mximo Diario:
0.267
0.0079
0.267 Lts/Seg
Q. Mximo Horario:
0.411
0.0121
0.411 Lts/Seg
Lnea de Conduccin:
0.267
0.0079
0.267 Lts/Seg
Lnea de Aduccin:
0.411
0.0121
0.411 Lts/Seg
Lnea de Distribucin:
0.411
0.0121
0.411 Lts/Seg
Q. Caudal Unitario:
0.0121
0.0103
Rendimiento
de Manantial
Los Caudales son resultado de los aforos realizados en Situ. Tenindose en cuenta
las temporadas de Lluvias y Temporadas de escasez de agua.
El mtodo empleado para tal fin es el mtodo Volumtrico. Ver Anexo C
Mant. 01/HUAQUILLAS
1.600
Lts/Seg
Mant. 02
---
Lts/Seg
Mant. 03
---
Lts/Seg
Mant. 04
-----
Lts/Seg
Mant. 05
Total de Caudal
Lts/Seg
1.60 Lts/Seg
PROYECTO: "CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGU
DE OXAMARCA, PROVINCIA DE CELENDN - CAJAMARCA"
DEP.: CAJAMARCA
PROYECT.:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
PROYECTO: "CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGU
DE OXAMARCA, PROVINCIA DE CELENDN - CAJAMARCA"
DEP.: CAJAMARCA
PROYECT.:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
* Datos de Diseo..
Descripcin
mbito Rural
mbito Urbano
General
Glb
Glb
Glb
34
No Corresponde
N de Conexiones:
40
Densidad Poblacional:
5.00
5.00
170
200
0.55
0.55
20.00
20.00
222
222
Dotacin (Lts/Hab/Da)
80.00
---
Periodo de Diseo:
Q. Promedio Anual:
0.206 Lts/S
0.206 Lts/S
Nota Importante:
Se considera el 25% de reserva, debido a que en la zona se contara con piletas publicas que
abastecera a diversas familias de las zonas aledaas al proyecto.
Para la Zona Rural:
Volumen del Reservorio (m3)
V = 0.25 * Qmd *86400/1000
Marcar con "1" lo correcto:
BOMBEO:
NO
SI
VALOR
1.96
1.30
Radio Propuesto
1.25
2.00
2.00
1.30
5.20
OK
Borde libre
Comprobacin de la relacin D/H :
0.30
1.54
OK
PROYECTO: "CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGU
DE OXAMARCA, PROVINCIA DE CELENDN - CAJAMARCA"
DEP.: CAJAMARCA
PROYECT.:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
V=
5.20
40.00 Fam
34.00 Fam
80.00 Lt/Hab/Da
Dotacin Seleccionada
Lt/Hab/Da
5.00 Hab/Fam
222 Hab
0.206 Lts/Seg
0.268 Lts/Seg
0.412 Lts/Seg
4.44 M3
EL VOLUMEN ES EL ADECUADO
PROYECTO:
"CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGUSTN, DISTRITO DE OXAMARCA, PROVINCIA DE
CELENDN - CAJAMARCA"
DEPARTAMENTO: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
GASTO (l/s)
TRAMO
# Benf. Familia
Tramo
Diseo
LONG.
(m)
PERDIDA DE
LONG.
PEND. DIAM.C DIAM. ASUM.
VELOC. CARGA (Hf)
INCLIN.
DEL
ALC.
(m/s)
(m)
TRAMO (pulg) PULG. CLASE
Inicial Final
C. PIEZOMET.
(m.s.n.m.)
Inicial
Final
COTA TERRENO
(m.s.n.m.)
Inicial
Final
PRESION
(m.c.a.)
Inicial
LINEA DE CONDUCCIN
C1
C2
200
40
0.2672 0.267
36.72
36.72
0.014
1.03
7.5
0.130
0.55
0.02
###
###
###
###
0.00
NOTA: POR SEGURIDAD EN EL DISEO LA CLASE DE TUBERA A UTILIZAR SER CL-.7.5 EN DIAMETROS MAYORES A 1 1/2" Y CL 10 EN LAS MENORES A 1 1/2"
LINEA DE DISTRIBUCIN
A1
A2
200
40
0.0103 0.411
32.98
32.99
0.025
1.08
7.5
0.200
1.22
0.04
###
###
###
###
0.00
0.61 1 1/2
0.32 3/4
10
0.140
0.81
0.02
###
###
###
###
0.79
10
0.110
1.21
0.02
###
###
###
###
2.17
0.74 1 1/2
0.40 1/2
10
0.110
0.53
0.07
###
###
###
###
2.17
10
0.080
1.07
0.08
###
###
###
###
4.35
10
0.100
0.45
0.02
###
###
###
###
4.35
10
0.080
1.07
0.05
###
###
###
###
5.83
A2
A3
75
15
0.0103 0.154
22.54
22.58
0.062
A3
A4
15
0.0103 0.031
18.43
18.49
0.082
A3
A5
60
12
0.0103 0.123
134.48 134.50
0.017
A5
A6
0.0103 0.010
75.37
75.37
0.003
A5
A7
55
11
0.0103 0.113
46.27
46.29
0.032
A7
A8
0.0103 0.010
47.04
47.04
0.001
0.63 1 1/2
0.51 1/2
A7
A9
50
10
0.0103 0.103
77.07
77.13
0.040
0.58
10
0.200
2.76
0.21
###
###
###
###
5.83
A9
A10
0.0103 0.010
32.67
32.67
0.015
0.29
1/2
10
0.080
1.07
0.03
###
###
###
###
8.71
A9
A11
45
0.0103 0.093
36.91
36.96
0.053
0.52
10
0.180
2.28
0.08
###
###
###
###
8.71
0.36
3/4
10
0.110
1.21
0.01
###
###
###
### 10.60
10
0.080
1.07
0.02
###
###
###
### 10.94
A11
A12
15
0.0103 0.031
7.63
7.64
0.046
20.68
0.006
0.35
1/2
0.0103 0.021
298.76 299.13
0.050
0.30
3/4
10
0.070
0.59
0.18
###
###
###
### 10.94
0.0103 0.021
332.51 332.87
0.046
0.31
3/4
10
0.070
0.59
0.20
###
###
###
###
0.0103 0.010
0.010
0.32
1/2
10
0.080
1.07
0.03
###
###
###
### 15.18
A12
A13
0.0103 0.010
A12
CRP-01
10
CRP-01
A14
10
A14
A15
20.68
24.85
24.85
0.00
PROYECTO:
"CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGUSTN, DISTRITO DE OXAMARCA, PROVINCIA DE
CELENDN - CAJAMARCA"
DEPARTAMENTO: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
GASTO (l/s)
TRAMO
# Benf. Familia
A14
A16
Tramo
Diseo
0.0103 0.010
LONG.
(m)
76.09
PERDIDA DE
LONG.
PEND. DIAM.C DIAM. ASUM.
VELOC. CARGA (Hf)
INCLIN.
DEL
ALC.
(m/s)
(m)
TRAMO (pulg) PULG. CLASE
Inicial Final
77.00
0.155
C. PIEZOMET.
(m.s.n.m.)
Inicial
Final
COTA TERRENO
(m.s.n.m.)
Inicial
Final
PRESION
(m.c.a.)
Inicial
0.18
3/4
10
0.040
0.15
0.01
###
###
###
### 15.18
10
0.080
1.07
0.02
###
###
###
### 26.95
A16
A17
0.0103 0.010
16.35
16.35
0.013
0.30
1/2
A16
A18
0.0103 0.010
8.23
8.34
0.160
0.18
3/4
10
0.040
0.15
0.00
###
###
###
### 26.95
A11
A19
30
0.0103 0.062
201.72 201.73
0.011
0.62
10
0.120
1.08
0.22
###
###
###
### 10.60
10
0.080
1.07
0.04
###
###
###
### 12.67
A19
A20
0.0103 0.010
A19
A21
25
0.0103 0.051
A21
A22
0.0103 0.010
A21
A23
20
0.0103 0.041
34.78
0.028
0.26
1/2
482.46 482.78
0.036
0.45
10
0.100
0.75
0.36
###
###
###
### 12.67
47.73
0.085
0.20
1/2
10
0.080
1.07
0.05
###
###
###
### 29.83
310.01 310.02
0.007
0.58
10
0.080
0.50
0.16
###
###
###
### 29.83
10
0.080
1.07
0.04
###
###
###
### 31.86
34.77
47.56
A23
A24
0.0103 0.010
37.54
37.54
0.013
0.30
1/2
A23
CRP-02
15
0.0103 0.031
74.32
74.89
0.125
0.29
3/4
10
0.110
1.21
0.09
###
###
###
### 31.86
CRP-02
A25
15
0.0103 0.031
41.83
43.15
0.253
0.25
3/4
10
0.110
1.21
0.05
###
###
###
###
A25
A26
0.0103 0.010
40.82
40.91
0.065
0.22
1/2
10
0.080
1.07
0.04
###
###
###
### 10.53
A25
A27
10
0.0103 0.021
86.50
88.46
0.214
0.22
3/4
10
0.070
0.59
0.05
###
###
###
### 10.53
10
0.080
1.07
0.04
###
###
###
### 29.02
0.00
A27
A28
0.0103 0.010
34.76
34.89
0.088
0.20
1/2
A27
A29
0.0103 0.010
87.80
87.80
0.008
0.33
3/4
10
0.040
0.15
0.01
###
###
###
### 29.02
A29
A30
0.0103 0.010
13.87
13.96
0.112
0.19
1/2
10
0.080
1.07
0.01
###
###
###
### 29.68
A29
A31
0.0103 0.010
24.66
24.68
0.041
0.24
3/4
10
0.040
0.15
0.00
###
###
###
### 29.68
A2
A32
125
25
0.0103 0.257
31.48
31.49
0.025
0.90
7.5
0.130
0.51
0.02
###
###
###
###
0.79
A32
A33
0.0103 0.010
15.70
15.76
0.085
0.20
1/2
10
0.080
1.07
0.02
###
###
###
###
1.57
A32
A34
120
24
0.0103 0.247
52.02
52.02
0.007
1.15
7.5
0.120
0.48
0.02
###
###
###
###
1.57
PROYECTO:
"CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGUSTN, DISTRITO DE OXAMARCA, PROVINCIA DE
CELENDN - CAJAMARCA"
DEPARTAMENTO: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
GASTO (l/s)
TRAMO
# Benf. Familia
Tramo
Diseo
LONG.
(m)
PERDIDA DE
LONG.
PEND. DIAM.C DIAM. ASUM.
VELOC. CARGA (Hf)
INCLIN.
DEL
ALC.
(m/s)
(m)
TRAMO (pulg) PULG. CLASE
Inicial Final
Inicial
10
0.110
1.21
0.02
###
###
###
###
1.17
352.30 352.37
0.019
10
0.190
1.51
0.53
###
###
###
###
1.17
0.002
0.89 1 1/2
0.82 1
10
0.100
0.75
0.77
###
###
###
###
7.41
16.87
0.133
0.19
1/2
10
0.080
1.07
0.02
###
###
###
###
9.13
99.23
0.015
0.50
3/4
10
0.140
2.03
0.20
###
###
###
###
9.13
10
0.080
1.07
0.02
###
###
###
### 10.43
0.0103 0.031
A34
A36
105
21
0.0103 0.216
A36
A37
25
0.0103 0.051
###
###
A37
A38
0.0103 0.010
16.72
A37
A39
20
0.0103 0.041
99.22
17.49
20.66
0.145
0.18
1/2
391.77 392.35
0.054
0.34
3/4
10
0.110
1.21
0.47
###
###
###
### 10.43
42.76
0.011
0.48
3/4
10
0.110
1.21
0.05
###
###
###
### 31.31
17.44
0.082
0.21
3/4
10
0.040
0.15
0.00
###
###
###
### 31.31
134.60 135.38
0.108
0.56
10
0.320
6.51
0.88
###
###
###
###
25.12
0.134
0.19
1/2
10
0.080
1.07
0.03
###
###
###
### 21.01
246.93 249.51
0.145
0.52
10
0.300
5.80
1.43
###
###
###
### 21.01
0.74
10
0.300
5.80
1.68
###
###
###
###
0.00
10
0.080
1.07
0.05
###
###
###
###
5.50
5.50
A39
A40
0.0103 0.010
A39
A41
15
0.0103 0.031
A41
A42
15
0.0103 0.031
42.76
A41
A43
0.0103 0.010
17.38
A36
A44
80
16
0.0103 0.164
A44
A45
0.0103 0.010
A44
CRP-03
75
15
0.0103 0.154
0.0103 0.154
Final
3/4
15
Inicial
0.62
15
75
Final
PRESION
(m.c.a.)
0.003
A35
A46
Inicial
COTA TERRENO
(m.s.n.m.)
17.49
A34
CRP-03
C. PIEZOMET.
(m.s.n.m.)
20.45
24.90
289.54 289.63
0.025
7.41
48.79
0.168
0.18
1/2
480.68 481.09
0.041
0.65
10
0.280
5.12
2.46
###
###
###
###
22.12
0.174
0.23
3/4
10
0.070
0.59
0.01
###
###
###
### 22.93
10.37
10.37
0.005
0.36
1/2
10
0.080
1.07
0.01
###
###
###
### 26.72
51.65
52.74
0.207
0.17
3/4
10
0.040
0.15
0.01
###
###
###
### 26.72
10
0.080
1.07
0.02
###
###
###
### 37.39
10
0.040
0.15
0.00
###
###
###
### 37.39
A46
A47
0.0103 0.010
48.11
A46
A48
70
14
0.0103 0.144
A48
A49
10
0.0103 0.021
21.79
A49
A50
0.0103 0.010
A49
A51
0.0103 0.010
A51
A52
0.0103 0.010
19.75
20.01
0.164
0.18
1/2
A51
A53
0.0103 0.010
6.55
7.41
0.528
0.14
3/4
PROYECTO:
"CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGUSTN, DISTRITO DE OXAMARCA, PROVINCIA DE
CELENDN - CAJAMARCA"
DEPARTAMENTO: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
GASTO (l/s)
TRAMO
# Benf. Familia
A48
A54
60
12
Tramo
Diseo
0.0103 0.123
LONG.
(m)
81.76
PERDIDA DE
LONG.
PEND. DIAM.C DIAM. ASUM.
VELOC. CARGA (Hf)
INCLIN.
DEL
ALC.
(m/s)
(m)
TRAMO (pulg) PULG. CLASE
Inicial Final
81.77
0.016
C. PIEZOMET.
(m.s.n.m.)
Inicial
Final
COTA TERRENO
(m.s.n.m.)
Inicial
Final
PRESION
(m.c.a.)
Inicial
0.75
10
0.240
3.83
0.31
###
###
###
### 22.93
10
0.080
1.07
0.04
###
###
###
### 23.93
A54
A55
0.0103 0.010
38.19
42.36
0.480
0.14
1/2
A54
A56
55
11
0.0103 0.113
29.59
29.62
0.046
0.58
10
0.220
3.27
0.10
###
###
###
### 23.93
A56
CRP-04
30
0.0103 0.062
66.30
72.88
0.456
0.29
10
0.120
1.08
0.07
###
###
###
### 25.19
CRP-04
A57
30
0.0103 0.062
65.66
66.23
0.132
0.37
10
0.120
1.08
0.07
###
###
###
###
0.00
A57
A58
0.0103 0.010
22.29
22.44
0.116
0.19
1/2
10
0.080
1.07
0.02
###
###
###
###
8.62
A57
A59
25
0.0103 0.051
132.64 133.48
0.113
0.36
10
0.100
0.75
0.10
###
###
###
###
8.62
10
0.040
0.15
0.00
###
###
###
### 23.49
A59
A60
0.0103 0.010
24.31
24.96
0.232
0.17
3/4
A59
CRP-05
20
0.0103 0.041
67.94
74.00
0.432
0.25
3/4
10
0.140
2.03
0.14
###
###
###
### 23.49
CRP-05
A61
20
0.0103 0.041
71.99
72.07
0.048
0.39
3/4
10
0.140
2.03
0.15
###
###
###
###
0.00
A61
A62
0.0103 0.010
49.54
54.84
0.475
0.14
1/2
10
0.080
1.07
0.05
###
###
###
###
3.33
A61
A63
15
0.0103 0.031
152.11 152.12
0.012
0.47
3/4
10
0.110
1.21
0.18
###
###
###
###
3.33
10
0.080
1.07
0.02
###
###
###
###
4.97
A63
A64
0.0103 0.010
A63
A65
10
0.0103 0.021
A65
A66
0.0103 0.010
A65
CRP-06
0.0103 0.010
CRP-06 CRP-07
CRP-07
A67
5
5
1
1
0.0103 0.010
0.0103 0.010
26.37
0.573
0.14
1/2
179.22 179.24
0.014
0.39
3/4
10
0.070
0.59
0.11
###
###
###
###
4.97
22.00
0.397
0.15
1/2
10
0.080
1.07
0.02
###
###
###
###
7.28
122.45 126.89
0.272
0.16
3/4
10
0.040
0.15
0.02
###
###
###
###
7.28
0.16
3/4
10
0.040
0.15
0.03
###
###
###
###
0.00
0.16
3/4
10
0.040
0.15
0.01
###
###
###
###
0.00
10
0.080
1.07
0.02
###
###
###
### 10.55
22.88
20.45
208.85 214.75
42.25
43.55
0.239
0.250
A67
A68
0.0103 0.010
18.23
18.24
0.040
0.24
1/2
A67
A69
0.0103 0.010
15.07
15.50
0.240
0.16
3/4
10
0.040
0.15
0.00
###
###
###
### 10.55
A56
CRP-08
25
0.0103 0.051
99.09 102.02
0.245
0.30
10
0.100
0.75
0.07
###
###
###
### 25.19
PROYECTO:
"CREACIN DEL SISTEMA DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERO SAN AGUSTN, DISTRITO DE OXAMARCA, PROVINCIA DE
CELENDN - CAJAMARCA"
DEPARTAMENTO: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA: CELENDIN
DISTRITO: OXAMARCA
LOCALIDAD: CASERIO SAN AGUSTIN
GASTO (l/s)
TRAMO
# Benf. Familia
CRP-08
A70
25
Tramo
Diseo
0.0103 0.051
LONG.
(m)
86.18
PERDIDA DE
LONG.
PEND. DIAM.C DIAM. ASUM.
VELOC. CARGA (Hf)
INCLIN.
DEL
ALC.
(m/s)
(m)
TRAMO (pulg) PULG. CLASE
Inicial Final
91.76
0.366
C. PIEZOMET.
(m.s.n.m.)
Inicial
Final
COTA TERRENO
(m.s.n.m.)
Inicial
Final
PRESION
(m.c.a.)
Inicial
0.28
10
0.100
0.75
0.06
###
###
###
###
10
0.080
1.07
0.04
###
###
###
### 31.46
0.00
36.75
0.085
0.20
1/2
0.0103 0.041
305.14 305.90
0.070
0.36
3/4
10
0.140
2.03
0.62
###
###
###
### 31.46
0.0103 0.041
225.68 232.77
0.253
0.28
3/4
10
0.140
2.03
0.46
###
###
###
###
0.00
20
0.0103 0.041
171.47 179.77
0.315
0.27
3/4
10
0.140
2.03
0.35
###
###
###
###
0.00
A72
20
0.0103 0.041
29.44
0.173
0.30
3/4
10
0.140
2.03
0.06
###
###
###
###
0.00
A72
A73
0.0103 0.010
104.47 106.75
0.210
0.17
1/2
10
0.080
1.07
0.11
###
###
###
###
4.95
A72
A74
15
0.0103 0.031
0.312
0.24
3/4
10
0.110
1.21
0.05
###
###
###
###
4.95
0.063
0.22
1/2
10
0.080
1.07
0.13
###
###
###
### 18.76
A70
A71
0.0103 0.010
A70
CRP-09
20
CRP-09 CRP-10
20
CRP-10 CRP-11
CRP-11
36.62
29.01
44.48
46.59
A74
A75
0.0103 0.010
124.74 124.99
A74
A76
10
0.0103 0.021
86.16
87.33
0.165
0.24
3/4
10
0.070
0.59
0.05
###
###
###
### 18.76
A76
A77
0.0103 0.010
53.46
53.49
0.031
0.25
1/2
10
0.080
1.07
0.06
###
###
###
### 32.95
A76
A78
0.0103 0.010
207.77 207.78
0.007
0.34
3/4
10
0.040
0.15
0.03
###
###
###
### 32.95
10
0.080
1.07
0.03
###
###
###
### 34.45
10
0.040
0.15
0.00
###
###
###
### 34.45
A78
A79
0.0103 0.010
30.10
30.12
0.039
0.24
1/2
A78
A80
0.0103 0.010
13.35
13.35
0.012
0.30
3/4
NOTA: LA CLASE DE TUBERA A UTILIZAR SER CL-.7.5 EN DIAMETROS MAYORES A 1 1/2" Y CL 10 EN LAS MENORES A 1 1/2"
PRESION
(m.c.a.)
Final
0.48
1 1/2"
0.79
2.17
3.67
4.35
4.51
5.83
5.85
8.71
9.18
10.60
10.94
10.79
25.67
15.18
15.40
PRESION
(m.c.a.)
Final
26.95
27.14
28.27
12.67
13.60
29.83
25.75
31.86
32.30
41.03
10.53
13.15
29.02
32.04
29.68
28.11
30.68
1.57
2.89
1.17
PRESION
(m.c.a.)
Final
1.10
7.41
9.13
11.33
10.43
13.37
31.31
31.72
32.74
21.01
24.31
55.38
5.50
13.55
22.93
26.72
26.76
37.39
40.60
40.85
PRESION
(m.c.a.)
Final
23.93
42.21
25.19
55.38
8.62
11.18
23.49
29.13
52.69
3.33
26.80
4.97
18.06
7.28
15.38
40.54
49.97
10.55
11.26
14.16
49.38
PRESION
(m.c.a.)
Final
31.46
34.53
52.32
56.54
53.65
4.95
26.78
18.76
26.54
32.95
34.53
34.45
35.59
34.61
PROYECTO:
DEPART.: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA:
DISTRITO:
LOCALIDAD:
TRAMO
DIAM.
COTA TERRENO
LONG. PEND.
ASUM.
(m.s.n.m.)
LONG.
INCLIN. DEL
(m)
(m) TRAMO PULG CLASE Inicial
Final
.
DIAMET
TIPO DE SUELO
6
LINEA DE CONDUCCION
C1
C2
36.72
36.72
A1
A2
32.98
32.99
A2
A3
22.54
22.58
A3
A4
18.43
18.49
A3
A5
A5
A6
134.48 134.50
75.37
75.37
A5
A7
46.27
46.29
A7
A8
47.04
47.04
A7
A9
77.07
77.13
A9
A10
32.67
32.67
0.014 2
0.025 2
7.5
###
###
T. NORMAL
7.5
###
###
T. NORMAL
0.062 1 1/2
0.082 3/4
10
###
###
T. NORMAL
10
###
###
T. NORMAL
0.017 1 1/2
0.003 1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
0.032 1 1/2
0.001 1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
0.040 1
0.015 1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
10
###
###
T. NORMAL
A9
A11
36.91
36.96
A11
A12
7.63
7.64
0.053 1
0.046 3/4
10
###
###
T. NORMAL
20.68
0.006
1/2
10
###
###
T. NORMAL
0.050
3/4
10
###
###
T. NORMAL
0.046
3/4
10
###
###
T. ROCOSO
0.010
1/2
10
###
###
T. NORMAL
0.155
3/4
10
###
###
T. NORMAL
0.013
1/2
10
###
###
T. NORMAL
0.160
3/4
10
###
###
T. NORMAL
0.011 1
0.028 1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
0.036 1
0.085 1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
10
###
###
T. NORMAL
10
###
###
T. NORMAL
A12
A12
CRP-01
A14
A14
A16
A16
A13
20.68
A11
A19
A19
A20
332.51 332.87
24.85
76.09
16.35
8.23
24.85
77.00
16.35
8.34
201.72 201.73
34.77
34.78
A19
A21
A21
A22
482.46 482.78
A21
A23
A23
A24
37.54
37.54
0.007 1
0.013 1/2
A23
CRP-02
74.32
74.89
0.125
3/4
10
###
###
T. NORMAL
CRP-02
A25
41.83
43.15
0.253
3/4
10
###
###
T. NORMAL
A25
A26
40.82
40.91
0.065
1/2
10
###
###
T. NORMAL
A25
A27
86.50
88.46
0.214
3/4
10
###
###
T. NORMAL
A27
A28
34.76
34.89
0.088
1/2
10
###
###
T. NORMAL
A27
A29
87.80
87.80
0.008
3/4
10
###
###
T. NORMAL
A29
A30
13.87
13.96
0.112
1/2
10
###
###
T. NORMAL
A29
A31
24.66
24.68
0.041
3/4
10
###
###
T. NORMAL
A2
A32
31.48
31.49
7.5
###
###
T. NORMAL
A32
A33
15.70
15.76
0.025 2
0.085 1/2
10
###
###
T. NORMAL
47.56
47.73
310.01 310.02
PROYECTO:
DEPART.: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA:
DISTRITO:
LOCALIDAD:
TRAMO
DIAM.
COTA TERRENO
LONG. PEND.
ASUM.
(m.s.n.m.)
LONG.
INCLIN. DEL
(m)
(m) TRAMO PULG CLASE Inicial
Final
.
A32
A34
52.02
52.02
A34
A35
17.49
17.49
A34
A36
A36
A37
A37
A37
A39
A39
A41
A41
A38
A39
A40
A41
A42
A43
A36
A44
A44
A45
A44
CRP-03
A46
A46
A47
A48
A48
A49
A49
A51
A51
###
16.72
99.22
20.45
###
16.87
99.23
20.66
391.77 392.35
42.76
17.38
42.76
17.44
134.60 135.38
24.90
25.12
A46
A49
352.30 352.37
A50
A51
A52
A53
289.54 289.63
48.11
10.37
51.65
19.75
6.55
0.007 2
0.003 3/4
7.5
###
###
T. NORMAL
10
###
###
T. NORMAL
0.019 1 1/2
0.002 1
10
###
###
T. NORMAL
10
###
###
T. ROCOSO
0.133
1/2
10
###
###
T. NORMAL
0.015
3/4
10
###
###
T. NORMAL
0.145
1/2
10
###
###
T. NORMAL
0.055
3/4
10
###
###
T. NORMAL
0.011
3/4
10
###
###
T. NORMAL
0.082
3/4
10
###
###
T. NORMAL
0.108 1
0.134 1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
0.145 1
0.025 1
10
###
###
T. NORMAL
10
###
###
T. NORMAL
1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
22.12
0.041 1
0.174 3/4
10
###
###
T. NORMAL
10.37
0.005
1/2
10
###
###
T. NORMAL
0.207
3/4
10
###
###
T. NORMAL
0.164
1/2
10
###
###
T. NORMAL
0.528
3/4
10
###
###
T. NORMAL
0.016 1
0.480 1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
0.046 1
0.456 1
10
###
###
T. NORMAL
10
###
###
T. NORMAL
0.132 1
0.116 1/2
10
###
###
T. NORMAL
10
###
###
T. NORMAL
10
###
###
T. NORMAL
10
###
###
T. NORMAL
48.79
480.68 481.09
21.79
DIAMET
TIPO DE SUELO
52.74
20.01
7.41
0.168
A48
A54
81.76
81.77
A54
A55
38.19
42.36
A54
A56
29.59
29.62
A56
CRP-04
66.30
72.88
CRP-04
A57
65.66
66.23
A57
A58
22.29
22.44
A57
A59
A59
A60
24.31
24.96
0.113 1
0.232 3/4
A59
CRP-05
67.94
74.00
0.432
3/4
10
###
###
T. NORMAL
CRP-05
A61
71.99
72.07
0.048
3/4
10
###
###
T. NORMAL
A61
A62
49.54
54.84
0.475
1/2
10
###
###
T. NORMAL
A61
A63
152.11 152.12
0.012
3/4
10
###
###
T. NORMAL
A63
A64
26.37
0.573
1/2
10
###
###
T. NORMAL
A63
A65
179.22 179.24
0.014
3/4
10
###
###
T. NORMAL
A65
A66
0.397
1/2
10
###
###
T. NORMAL
132.64 133.48
22.88
20.45
22.00
PROYECTO:
DEPART.: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA:
DISTRITO:
LOCALIDAD:
TRAMO
A65
DIAM.
COTA TERRENO
LONG. PEND.
ASUM.
(m.s.n.m.)
LONG.
INCLIN. DEL
(m)
(m) TRAMO PULG CLASE Inicial
Final
.
TIPO DE SUELO
0.272
3/4
10
###
###
T. NORMAL
0.239
3/4
10
###
###
T. NORMAL
0.250
3/4
10
###
###
T. NORMAL
0.040
1/2
10
###
###
T. NORMAL
0.240
3/4
10
###
###
T. NORMAL
10
###
###
T. NORMAL
A67
A68
A69
A56
CRP-08
CRP-08
A70
A70
A70
A71
42.25
18.23
15.07
43.55
18.24
15.50
99.09 102.02
86.18
36.62
91.76
36.75
A72
A73
A74
A75
A76
A77
A78
A79
A80
29.01
29.44
104.47 106.75
44.48
46.59
124.74 124.99
86.16
53.46
87.33
53.49
207.77 207.78
30.10
13.35
30.12
13.35
0.245 1
0.366 1
DIAMET
6
10
###
###
T. NORMAL
0.085
1/2
10
###
###
T. NORMAL
0.070
3/4
10
###
###
T. NORMAL
0.253
3/4
10
###
###
T. NORMAL
0.315
3/4
10
###
###
T. NORMAL
0.173
3/4
10
###
###
T. NORMAL
0.210
1/2
10
###
###
T. NORMAL
0.312
3/4
10
###
###
T. NORMAL
0.063
1/2
10
###
###
T. NORMAL
0.165
3/4
10
###
###
T. NORMAL
0.031
1/2
10
###
###
T. NORMAL
0.007
3/4
10
###
###
T. NORMAL
0.039
1/2
10
###
###
T. NORMAL
0.012
3/4
10
###
###
T. NORMAL
9425.12 ml
0.00
NOTA: LA CLASE DE TUBERA A UTILIZAR SER CL-.7.5 EN DIAMETROS MAYORES A 1 1/2" Y CL 10 EN LAS
PROYECTO:
DEPART.: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA:
DISTRITO:
LOCALIDAD:
TRAMO
DIAMET
TIPO DE SUELO
6
ITEM
TUBERIA
VALVULA
TUB. PVC.
LONG
1.00
0.00 ml
7.5
2.00
153.23 ml
7.5
VC - 02
555.74 ml
10
VC - 03 (
CLASE
TUB. PVC.
VC - 01
4.00
3873.45 ml
10
VC - 04
5.00
3719.99 ml
10
VC - 05
6.00
1122.71 ml
10
VC - 06
TOTAL
9425.12 ml
VC - 07
RE
ITEM
TUB. PVC.
VC - 01
1.00
1.00
VC - 02
2.00
1.00
VC - 03 (
3.00
1.00
TOT
4.00
1.00
5.00
1.00
6.00
1.00
7.00
1.00
TUB. PVC.
VALVUL
8.00
1.00
VP - 01
9.00
1.00
VP - 02
10.00
1.00
VP - 03
11.00
1.00
VP - 04
RESUMEN
VP - 05
TIPO
C.R.P. TIPO 7
3.00
TUB. PVC.
C.R.P. TIPO 7
8.00
VP - 01
11.00
TOT
TOTAL
CANT.
RE
TIPO
TIPO
DESCRIPCIO
ROCA SUELT
PROYECTO:
DEPART.: CAJAMARCA
PROYECTISTA:
FECHA: ABRIL DEL 2015
PROVINCIA:
DISTRITO:
LOCALIDAD:
TRAMO
DIAM.
COTA TERRENO
LONG. PEND.
ASUM.
(m.s.n.m.)
LONG.
INCLIN. DEL
(m)
(m) TRAMO PULG CLASE Inicial
Final
.
DIAMET
TIPO DE SUELO
6
CONGLOMERA
T. ROCOSO
T. NORMAL
N DE METRADOS DE TUBERIA
(ANEXO C)
DIAMETROS DE LA TUBERIA UTILIZADA
4
1 1/2
3/4
1/2
36.72
32.99
22.58
18.49
134.50
75.37
46.29
47.04
77.13
32.67
36.96
7.64
20.68
299.13
332.87
24.85
77.00
16.35
8.34
201.73
34.78
482.78
47.73
310.02
37.54
74.89
43.15
40.91
88.46
34.89
87.80
13.96
24.68
31.49
15.76
N DE METRADOS DE TUBERIA
(ANEXO C)
DIAMETROS DE LA TUBERIA UTILIZADA
4
1 1/2
3/4
1/2
52.02
17.49
352.37
###
16.87
99.23
20.66
392.35
42.76
17.44
135.38
25.12
249.51
289.63
48.79
481.09
22.12
10.37
52.74
20.01
7.41
81.77
42.36
29.62
72.88
66.23
22.44
133.48
24.96
74.00
72.07
54.84
152.12
26.37
179.24
22.00
N DE METRADOS DE TUBERIA
(ANEXO C)
DIAMETROS DE LA TUBERIA UTILIZADA
4
1 1/2
3/4
1/2
126.89
214.75
43.55
18.24
15.50
102.02
91.76
36.75
305.90
232.77
179.77
29.44
106.75
46.59
124.99
87.33
53.49
207.78
30.12
13.35
0.00 153.23 555.74
###
###
###
N DE METRADOS DE TUBERIA
(ANEXO C)
DIAMETROS DE LA TUBERIA UTILIZADA
4
1 1/2
3/4
VALVULA DE CONTROL
TUB. PVC. ENTRADA
CANT.
VC - 01 (3/4")
1.00
VC - 02 (1")
1.00
VC - 03 (1 1/2")
1.00
VC - 04 (1")
1.00
VC - 05 (1")
1.00
VC - 06 (1")
1.00
VC - 07 (1")
1.00
RESUMEN
TUB. PVC. ENTRADA
CANT.
VC - 01 (3/4")
1.00
VC - 02 (1")
5.00
VC - 03 (1 1/2")
1.00
TOTAL
7.00
VALVULA DE PURGA
TUB. PVC. ENTRADA
CANT.
VP - 01 (3/4")
1.00
VP - 02 (3/4")
1.00
VP - 03 (3/4")
1.00
VP - 04 (3/4")
1.00
VP - 05 (3/4")
1.00
RESUMEN
TUB. PVC. ENTRADA
CANT.
VP - 01 (3/4")
5.00
TOTAL
5.00
TIPO DE SUELO
DESCRIPCION
METRADO
ROCA SUELTA
0.00 ML
1/2
N DE METRADOS DE TUBERIA
(ANEXO C)
DIAMETROS DE LA TUBERIA UTILIZADA
4
1 1/2
CONGLOMERADO
0.00 ML
T. ROCOSO
1364.32 ML
T. NORMAL
8060.80 ML
3/4