Monitorin
g Station
A1 At an
open
space,
near to the
back of
office
Quarry.
[N
0137'35.3
'', E
10332'38.
9'']
N1 At an
open
space,
about 50
meters
from
weight
bridge.
[N
0137'36.0
'', E
Parameters
Total
Suspen
ded
Particul
ates
(TSP)
PM10
LAeq
LAmax
LAmin
L10
L90
Methods &
Frequency
Compliance &
Standard
Methodol
ogy for
Total
Suspende
d
Particulat
es (ASTM
D 4096,
1993)
Malaysi
an
Ambient
Air
Quality
Standar
d
(MAAQS
)
Methodol
ogy for
PM10
(ASTM D
4096,
1993)
Proposed
Monitorin
g
Program
me:Quart
erly
260
g/m
(24
hours
averagi
ng
time)TSP
150
g/m
(24
hours
averagi
ng
time)PM10
Schedul
e 1 in
the
guidelin
es of
Plannin
g
Guidelin
es for
Environ
mental
Noise
Methodol
ogy for
Noise
Levels
Measure
ment (ISO
1996)
Proposed
Monitorin
g
Program
10332'38.
3'']
me
:Quarterly
Limits
and
Control
(2004)
EIA
Approva
l
Conditio
n No.23
Activities &
Environmental
Issues Concerned
1. Solid waste
generations
Environmental
Impacts
Operation Stage
Proliferation of
disease vectors
Unpleasant
odour
Degradation of
aesthetic value
Proposed Mitigation
Measures
Adopting
recycling
techniques and
encouraging
sorting of solid
waste at source
into organic and
inorganic waste.
All solid waste
generated from
development
shall be
disposed of at
the dumpsite
approved by the
local activities
Private
registered
contractor shall
be appointed to
collect the
garbage and
disposed to
dump site
operated by the
2. Wastewater
discharge
Contamination of
drinking water
supply occur by
waste water
Occurrence of
public health
hazard
Pollution of
ground and
surrounding
3. Dust generation
Visibility of the
surrounding
plant will be
reduced.
Occurrence of air
pollution
Health hazard to
employees of the
plant.
Local Council.
No open burning
of solid wastes
shall be carried
out at any time.
Leachate from
garbage can be
prevented by
ensuring
garbage are well
kept in proper
containers and
regularly
collected.
The sewage
system will not
be connected to
the surface run
off system.
The design of
the septic tank
and absorption
pit/leaching field
will take into
consideration
the nature of the
soil and
percolation rate.
Periodically
maintain and
dislodge
portable.
Expected
atmospheric
condition before
charging and
blasting is taken
into account.
Implementation
of water spray at
plant site.
Frequent
4. Landscape
Aggregate
working can
introduce
intrusive
features
5. Noise and
vibration
Noise pollution
generated from
heavy machinery
and chain saws
will be restricted
to day time and
impact is short
term and
localized.
spraying of
water on haul
road to minimize
dust dispersion.
All proposed
extractive
development
proposals must
be accompanied
by detailed
restoration and
after-care plans.
Progressive
restoration
should be
employed where
relevant and
practicable, e.g.
for sand and
gravel pits.
Noise monitoring
will conducted
Construction
activities that
generate high
noise are
restricted to
8.00 am to 7.00
pm.
Use of the
delayed
blasting
technique,
whereby the
blast takes place
in a series of
timed small
explosions
rather than a
single large
blast, help to
minimize
vibration in the
rock body.
Monitori
Parameters
Compliance &
ng
Station
Silt Trap
Standard
Total
EIA
Suspende
Examination of water
Approval
and
Condition
Solids
(TSS)
wastewater,
American
Health
Public
Association,
American
Water
Environment
Federation.
Proposed Monitoring
Programme
Monthly
No.17
TSS
50mg/l
Ite
Description
Quantity
Amount (RM)
30,000.00
m
A
Environment Audit
Per Year
10,000.00
Waste Management
Per Year
20,000.00
Per Year
20,000.00
Training
D
Silt trap
150,000.00
200,000.00
Other BMPs:
-Check dam
-Wash trough
-Temporary earth drain
-Sediment fence
50,000.00
30,000.00
15,000.00
50,000.00