You are on page 1of 7

Table 4 :

Monitorin
g Station
A1 At an
open
space,
near to the
back of
office
Quarry.
[N
0137'35.3
'', E
10332'38.
9'']

N1 At an
open
space,
about 50
meters
from
weight
bridge.
[N
0137'36.0
'', E

Environmental Monitoring Programme

Parameters

Total
Suspen
ded
Particul
ates
(TSP)

PM10

LAeq

LAmax

LAmin

L10

L90

Methods &
Frequency

Compliance &
Standard

Methodol
ogy for
Total
Suspende
d
Particulat
es (ASTM
D 4096,
1993)

Malaysi
an
Ambient
Air
Quality
Standar
d
(MAAQS
)

Methodol
ogy for
PM10
(ASTM D
4096,
1993)

Proposed
Monitorin
g
Program
me:Quart
erly

260
g/m
(24
hours
averagi
ng
time)TSP

150
g/m
(24
hours
averagi
ng
time)PM10

Schedul
e 1 in
the
guidelin
es of
Plannin
g
Guidelin
es for
Environ
mental
Noise

Methodol
ogy for
Noise
Levels
Measure
ment (ISO
1996)

Proposed
Monitorin
g
Program

10332'38.
3'']

me
:Quarterly

Limits
and
Control
(2004)

EIA
Approva
l
Conditio
n No.23

Table 5 : Mitigation Measures during Operation

Activities &
Environmental
Issues Concerned
1. Solid waste
generations

Environmental
Impacts
Operation Stage
Proliferation of
disease vectors
Unpleasant
odour
Degradation of
aesthetic value

Proposed Mitigation
Measures

Adopting
recycling
techniques and
encouraging
sorting of solid
waste at source
into organic and
inorganic waste.
All solid waste
generated from
development
shall be
disposed of at
the dumpsite
approved by the
local activities
Private
registered
contractor shall
be appointed to
collect the
garbage and
disposed to
dump site
operated by the

2. Wastewater
discharge

Contamination of
drinking water
supply occur by
waste water
Occurrence of
public health
hazard
Pollution of
ground and
surrounding

3. Dust generation

Visibility of the
surrounding
plant will be
reduced.
Occurrence of air
pollution
Health hazard to
employees of the
plant.

Local Council.
No open burning
of solid wastes
shall be carried
out at any time.
Leachate from
garbage can be
prevented by
ensuring
garbage are well
kept in proper
containers and
regularly
collected.
The sewage
system will not
be connected to
the surface run
off system.
The design of
the septic tank
and absorption
pit/leaching field
will take into
consideration
the nature of the
soil and
percolation rate.
Periodically
maintain and
dislodge
portable.
Expected
atmospheric
condition before
charging and
blasting is taken
into account.
Implementation
of water spray at
plant site.
Frequent

4. Landscape

Aggregate
working can
introduce
intrusive
features

5. Noise and
vibration

Noise pollution
generated from
heavy machinery
and chain saws
will be restricted
to day time and
impact is short
term and
localized.

spraying of
water on haul
road to minimize
dust dispersion.
All proposed
extractive
development
proposals must
be accompanied
by detailed
restoration and
after-care plans.
Progressive
restoration
should be
employed where
relevant and
practicable, e.g.
for sand and
gravel pits.
Noise monitoring
will conducted
Construction
activities that
generate high
noise are
restricted to
8.00 am to 7.00
pm.
Use of the
delayed
blasting
technique,
whereby the
blast takes place
in a series of
timed small
explosions
rather than a
single large
blast, help to
minimize

vibration in the
rock body.

Table 2 : Environmental Monitoring Programme

Monitori

Parameters

Methods & Frequency

Compliance &

ng
Station
Silt Trap

Standard

Total

Standard Methods for

EIA

Suspende

Examination of water

Approval

and

Condition

Solids

(TSS)

wastewater,

American
Health

Public
Association,

American

Water

Work Association and


Water

Environment

Federation.

Proposed Monitoring
Programme
Monthly

No.17

TSS
50mg/l

Table 1: Bill of Quantities

Ite

Description

Quantity

Amount (RM)

30,000.00

m
A

Preparation of EMP report

Environment Audit

Per Year

10,000.00

Waste Management

Per Year

20,000.00

Per Year

20,000.00

Training
D

Environment Aspect and


Impact Awareness Training

Silt trap

150,000.00

Maintenance of silt trap

200,000.00

Other BMPs:
-Check dam
-Wash trough
-Temporary earth drain
-Sediment fence

50,000.00
30,000.00
15,000.00
50,000.00