DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

MATERIALES
ALAMBRE NEGRO RECOCIDO # 16

KG

3.39

47.38

ALAMBRE NEGRO RECOCIDO # 8

KG

3.39

32.81

ALDABA CON CANDADO

PZA

29.66

2.00

ALAMBRE DE PUAS #16

ML

0.42

222.48

CLAVOS PARA MADERA C/C 3"

KG

3.39

111.39

CLORADOR AUTOMATICO

UND

400.00

1.00

BIODIGESTOR DE 600 LTS

UND

847.46

28.00

CLAVOS PARA CALAMINA

KG

5.93

19.49

ACERO DE REFUERZO FY=4200 GRADO 60

KG

2.74

601.85

ARENA FINA

M3

63.50

23.35

PIEDRA CHANCADA DE 3/4"

M3

72.03

11.11

ARENA GRUESA

M3

72.03

17.26

MATERIAL PROPIO PARA CAMA DE APOYO

M3

8.47

14.84

Pgina 1

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

MATERIAL DE RELLENO

M3

67.80

0.03

PIEDRA MEDIANA

M3

72.03

16.73

PIEDRA GRANDE

M3

72.03

5.38

GRAVA PARA FILTRO DE 3/4" - 1/2"

M3

72.03

23.81

GRAVA PARA FILTRO DE 1"

M3

84.66

0.38

LADRILLOS KK 10x14x24

UND

0.59

12224.94

CEMENTO PORTLAND TIPO I (42.5KG)

BOL

20.76

692.61

ADITIVO ACELERANTE FRAGUA

GLN

28.62

0.28

CINTA TEFLON

UND

1.27

27.01

KG

5.00

27.57

YESO DE 28 Kg

BOL

6.36

54.17

IMPERMEABILIZANTE

GLN

16.95

56.60

KG

4.90

5.05

UND

76.27

40.63

OCRE ROJO IMPORTADO

CURADOR ANTISOL
PEGAMENTO PARA PVC 1/4 GLN

Pgina 2

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

SILICONA

UND

8.05

2.80

FORMADOR DE EMPAQUETADURAS 1/4 GLN

UND

25.42

0.11

COLA SINTETICA FULLER

GLN

27.12

0.68

SELLADOR DE MADERA

UND

29.66

2.82

IMPRIMANTE

GLN

19.49

18.44

LIJA

UND

1.27

80.88

WINCHA

UND

15.25

9.05

LISTONES DE 2"X3"X10

UND

11.44

71.40

HORMIGON

M3

72.03

44.60

AGUA

M3

1.69

129.53

HIPOCLORITO DE CALCIO AL 70%

KG

8.85

0.00

UND

26.27

28.00

P2

2.20

1025.26

UND

14.70

224.91

TAPA DE FG 25CM X 30CM P/AGUA CON CHAPA


MADERA NACIONAL P/ENCOFRADO-CARP
MADERA AGUANO 2x 2 x 10

Pgina 3

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN
PUERTA DE MADERA, TABLERO REBAJADO, DE AGUANO
0.65x1.72M

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

UND

139.83

28.00

P2

0.50

515.74

CAJA DE DESAGUE DE 12"X24"

UND

8.47

56.00

THINER

GLN

13.56

5.66

BARNIZ MARINO

GLN

40.68

2.82

PINTURA LATEX

GLN

46.61

12.31

PINTURA ANTICORROSIVA EPOX-USO NAVAL

GLN

38.98

0.01

PINTURA ESMALTE

GLN

33.10

1.48

CALAMINA #25 DE 1.83Mx0.83Mx2.0mm

PLN

16.95

90.97

CANASTILLA DE BRONCE DE 1

PZA

2.12

1.00

Tuberia FG 1 1/2"

ML

15.00

2.40

Tuberia FG 1"

ML

28.56

2.04

TUBO FIERRO GALVANIZADO 3"

ML

33.19

1.00

UND

1.69

112.00

ESTACA DE MADERA

CODO DE FG 90 D=1/2"

Pgina 4

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

CODO DE FG 90 D=1"

UND

1.53

1.00

CODO DE FG 90 D=2"

UND

12.50

4.00

JGO

6.61

28.00

UND

13.10

1.00

ML

5.08

171.36

UND

46.19

6.00

NIPLE DE F GALV. DE 3/4" X 1"

PZA

2.12

14.00

NIPLE DE F GALV. DE 1" X 1 1/2"

PZA

2.97

2.00

NIPLE DE F GALV. DE 1/2" X 1"

PZA

1.69

224.00

ML

220.00

0.82

NIPLE DE F GALV. DE 1" X 2"

PZA

1.10

2.00

NIPLE DE F GALV. DE 4" X 1"

PZA

5.40

1.00

SUMIDERO DE BRONCE DE 2"

UND

3.22

60.00

ML

6.44

27.86

UAS GALVANIZADAS PARA LAVORATORIO


UNION SIMPLE DE F G 2"
TUBERIA CRIBADA PVC-SAL D=2" (7.5cm)
BRIDA ROMPE AGUA, e=1/16"

CARTEL DE IDENTIFICACION DE OBRA 3.60X2.40M

TUBERIA PVC-U D=2" C-10

Pgina 5

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

TUBERIA PVC-U D=1" C-10

ML

3.05

1694.21

TUBERIA PVC-U D=1/2" C-10

ML

2.37

398.28

TUBERIA PVC-U D=3/4" C-10

ML

2.54

947.15

REDUCCION SP PVC SAP P/AGUA 1" A 3/4"

UND

2.37

9.00

UNION SP PVC SAP P/AGUA DE 1"

UND

2.37

3.00

UNION SP PVC SAP P/AGUA DE 2"

UND

5.76

4.00

TAPON MACHO SP PVC SAP P/AGUA DE 2"

UND

8.90

59.00

TAPON HEMBRA SP PVC SAP P/AGUA DE 3/4"

UND

6.40

4.00

TAPON HEMBRA SP PVC SAP P/AGUA DE 1"

UND

7.20

2.00

CODO DE 45 SP PVC SAP P/AGUA DE 1/2"

UND

2.80

56.00

TEE SP PVC SAP P/AGUA DE 1/2"

UND

1.69

84.00

TEE SP PVC SAP P/AGUA DE 3/4"

UND

2.12

39.00

TEE SP PVC SAP P/AGUA DE 1"

UND

2.54

16.00

TEE SP PVC SAP P/AGUA DE 2"

UND

13.14

3.00

Pgina 6

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

TEE SP PVC SAL DE4"X4"

UND

8.05

60.00

REDUCCION PVC SAL DE 4"X2"

UND

3.81

30.00

TEE SP PVC SAL DE 2"X2"

UND

8.47

28.00

TUB. DE ABASTO DE 1/2 x 1/2 x 0.35m

UND

8.47

28.00

TRAMPA PVC SAL 2"

UND

8.05

60.00

TRAMPA "P" CROMADA DE 1 1/4

UND

29.66

28.00

CONO REBOSE PVC D=2"

PZA

8.05

1.00

CONO REBOSE PVC 6x4"

UND

35.50

1.00

REGADERA PVC 1/2"

UND

23.73

28.00

PZA

16.95

28.00

UND

150.00

2.59

TUBO PVC SAL 4" X 3M

ML

6.36

211.57

YEE PVC SAL DE 4" X 2"

PZA

6.36

60.00

YEE PVC SAL DE 2"

PZA

2.54

30.00

PILON (CIM) JARDIN ESFERICA DE 1/2" CROM.


CARRETILLA

Pgina 7

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

PZA

21.19

28.00

LLAVE LAVATORIO CROMADO

UND

27.12

28.00

DESAGUE LAVATORIO CROMADO

UND

19.07

28.00

VALVULA COMPUERTA DE BRONCE DE 2"

UND

83.05

2.00

VALVULA COMPUERTA DE BRONCE DE 3/4"

UND

40.68

5.00

VALVULA COMPUERTA DE BRONCE DE 1"

UND

78.00

10.00

VALVULA TIPO BOLA DE 1/2"

UND

23.73

84.00

VALVULA FLOTADORA VERTICAL 1"

UND

66.95

1.00

PZA

2.97

30.00

ADAPTADOR UPR PVC DE 1"

UND

2.97

18.00

VALVULA DE COMPUERTA DE BRONCE DE 1"

UND

46.61

1.00

CONO DE REBOSE PVC 2"

UND

8.05

1.00

CONO DE REBOSE PVC 4"X2"

UND

8.05

1.00

CODO 45 SP PVC SAP P/AGUA DE 1"

UND

2.97

2.00

LLAVE DE PASO PVC 1/2" DE 150 LBRS.

SOMBRERO DE VENTILACION PVC SAL 2"

Pgina 8

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

CODO 45 SP PVC SAP P/AGUA DE 3/4"

UND

2.12

1.00

CODO 22.5 SP PVC 1"

UND

2.97

5.00

CODO 11.25 SP PVC 1"

UND

2.12

1.00

NIPLE PVC D= 1" L=1.5"

UND

6.00

4.00

NIPLE PVC D= 2" L=2"

UND

4.00

2.00

NIPLE PVC D= 1" L=1"

UND

2.54

12.00

CODO 90 SP PVC SAP P/AGUA DE 1"

UND

2.12

11.00

CODO 90 SP PVC SAP P/AGUA DE 2"

UND

5.34

56.00

CODO 90 SP PVC SAP P/AGUA DE 1/2"

UND

0.76

140.00

CODO 90 SP PVC SAL DE 2"

UND

0.81

94.00

REGISTRO ROSCADO CROMADO 4"

UND

21.19

30.00

ADAPTADOR UPR PVC 3/4"

UND

1.69

14.00

VALVULA DE COMPUERTA DE BRONCE 3/4"

UND

15.25

4.00

UNION UNIVERSAL DE PVC DE 3/4"

UND

3.81

14.00

Pgina 9

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

UNION UNIVERSAL DE PVC DE 1/2"

UND

2.97

224.00

BRIQUETA DE HIPOCLORITO DE CALCIO 65-70%

Barr

413.56

1.00

PELDAOS DE TUBO FG 3/4"

UND

12.71

6.00

ADAPTADOR UPR PVC 1/2"

UND

0.59

84.00

BIZAGRA 4

UND

4.24

6.00

LAVATORIO DE PARED BLANCO

UND

50.85

28.00

PAR

5.08

84.00

PICAPORTE DE FIERRO 3"

UND

3.81

28.00

INODORO DE TANQUE BAJO

UND

84.75

28.00

ROLLIZO DE EUCALIPTO 8"X6.00M

PZA

16.95

0.51

ROLLIZO DE EUCALIPTO 4"X3.00M

UND

13.00

12.60

CODO DE 90 SP PVC 2"

UND

0.93

2.00

CODO DE 45 SP PVC 2"

UND

1.23

2.00

CANASTILLA DE PVC DE 2"

UND

8.00

3.00

BIZAGRA CAPUCHINA de 3 1/2" x 3 1/2"

Pgina 10

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

ADAPTADOR UPR PVC DE 2"

UND

3.52

2.00

UNION UNIVERSAL DE PVC 2"

UND

13.98

2.00

TAPON DE LIMPIEZA DE 2"

UND

6.40

1.00

WATER STOP PVC DE 8"

ML

21.19

6.38

TUBERIA PVC SAL 2"

ML

0.71

307.58

UNION UNIVERSAL DE PVC DE 1"

UND

5.34

16.00

UNION UNIVERSAL DE FG DE 1"

UND

8.57

2.00

UNION UNIVERSAL DE FG DE 2"

UND

16.90

3.00

UND

59.32

2.00

UND

38.14

12.00

UND

80.51

8.00

CONTENEDORES HERMETICOS DE RESIDUOS SOLIDOS

UND

84.75

1.00

PAPEL KRAFF

UND

0.42

5.61

PLUMONES GRUESOS ROJO-AZUL-NEGRO

UND

2.12

2.38

MARC. Y TAPA PLANCHA ACERO LAC 1/8" 0.40x0.40m


C/MECA DE SEG
MARC. Y TAPA PLANCHA ACERO LAC 1/8" 0.30x0.30m
C/MECA DE SEG
MARC. Y TAPA PLANCHA ACERO 1/8" 0.60x0.60m C/MECA
SEGURIDAD

Pgina 11

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

CINTA MASKIN

UND

3.39

0.68

DADOS

UND

0.25

23.63

LUDO FAMILIAR

UND

2.97

23.63

ROMPECABEZAS

UND

5.93

23.63

AFICHES DE AUTOEVALUACION

UND

2.54

23.63

GUIA METODOLOGICA

UND

3.81

23.63

BOLSAS DE POLISEDA

UND

1.95

23.63

VASITOS PLASTICOS

UND

0.17

23.63

PROMOTOR SOCIAL

MES.

2118.64

0.02

UND

10.17

0.17

UND

10.17

0.17

UND

10.17

0.17

Conocemos la Importancia del Agua para la Vida y la Salud

UND

10.17

0.17

Conocemos, Usamos y Cuidamos Nuestra Letrina Sanitaria

UND

10.17

0.17

Conociendo los problemas de Saneamiento y Trabajando


Organizadamente en mi Comunidad
Nos Queremos, Nos Cuidamos y Practicamos la Higiene
personal y Ambiental
Varones y Mujeres Trabajando Juntos por un Buen
Saneamiento y Buena Salud

Pgina 12

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

Conocemos y Evitamos las Enfermedades por Saneamiento

UND

10.17

0.17

Manual "Conozcamos Nuestros Deberes y derechos sobre


Saneamiento"

UND

4.24

30.00

Presentacion del Modelo de intervencion

UND

84.75

0.17

Importancia del Agua para la Vida y la Salud

UND

84.75

0.17

Importancia de la Adecuada Eliminacion de Excretas

UND

84.75

0.17

Habitos de Higiene Personal y Ambiental

UND

84.75

0.17

Maqueta de Batea Domiciliaria (1, 2 y 3), con Caja


Portamaquetas

GLB

84.75

0.17

Maqueta de Letrina estandar

GLB

84.75

0.17

Maqueta de Modulo Sanitario para Centro educativo

GLB

84.75

0.17

El agua es Vida y Salud

UND

0.50

23.63

Cuida y Usa tu Letrina

UND

0.50

23.63

Lavado de Manos

UND

0.50

23.63

Decalogo para el Buen Saneamiento y Buena salud

UND

0.50

23.63

PAPEL BOND

MILL

29.66

0.51

Pgina 13

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

TIJERA

UND

4.24

0.34

KUTER

UND

2.12

0.34

ENGRAPADOR

UND

16.95

0.34

PERFORADOR

UND

12.71

0.34

Grapas

CJA

3.81

0.17

Clips

CJA

0.85

0.68

Rafia

RLL

2.54

0.68

Cartulina

UND

0.42

5.61

Cuadernos

UND

3.81

1.19

Lapiceros

UND

0.42

1.19

PASAJE IDA Y VUELTA

UND

16.95

0.02

H.

12.71

0.84

H.

12.71

0.84

H.

12.71

1.36

Taller "Identificacion y Analisis de la situacion del


saneamiento basico en la comunidad"
Taller "Importancia de la organizacin y participacion
comunitaria y liderazgo"
Taller a JASS "Estatutos y Reglamentos"

Pgina 14

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

Taller "Genero"

H.

12.71

6.72

Taller "Autoestima"

H.

12.71

6.72

Taller "Importancia del Agua para la vida y salud"

H.

12.71

6.72

Taller "Importancia de la disposicion adecuada de excretas"

H.

12.71

6.72

H.

12.71

6.72

H.

12.71

6.72

H.

12.71

1.36

Taller a JASS "Partes del Sistema"

H.

12.71

1.36

Taller a JASS "Gasfiteria y Reparaciones"

H.

12.71

1.36

Taller a JASS "Operacin y Mantenimiento del sistema de


agua, letrinas y modulo sanitario"

H.

12.71

1.36

Taller a JASS "Cloracion y Desinfeccion"

H.

12.71

1.36

UND

12.71

0.17

UND

8.48

0.17

UND

8.48

0.17

Taller " Prevencion de enfermedades ligadas al saneamiento


y habitos de higiene"
Taller "Disposicion de residuos solidos y reciclaje de
plasticos"
Taller a JASS "Administracion, Contabilidad y Manejo de
Almacen"

Conozcamos el estatuto y Reglamento para administrar los


servicios de saneamiento basico de nuestra comunidad
Aprendamos a administrar, llevar nuestras cuentas, manejo
y control de almacen
Conozcamos las partes de nuestro sistema de agua por
gravedad y su planta de tratamiento

Pgina 15

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN
Aprendamos a operar y mantener nuestro sistema de agua
por gravedad, sin planta de tratamiento
Aprendamos gasfiteria y como reparar nuestro sistema de
agua

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

UND

8.48

0.17

UND

8.48

0.17

UND

8.48

0.17

UND

8.48

0.17

UND

8.48

0.17

UND

8.48

0.17

"Cloracion y Desinfeccion"

UND

84.75

0.17

"Partes del Sistema"

UND

84.75

0.17

CAPTACION

UND

84.75

0.17

CAMARA DISTRIBUIDORA DE CAUDALES

UND

84.75

0.17

FILTRO LENTO

UND

84.75

0.17

RESERVORIO

UND

84.75

0.17

CASETA DE VALVULAS

UND

84.75

0.17

Certificado para el participante

UND

0.85

24.52

Aprendamos a desinfectar y clorar nuestro sistema de agua


Apoyemos a las familias para la practica de higiene y el
saneamiento intradomiciliario
Aprendamos a construir, usar y mantener nuestras letrinas
con pozo seco, ventilado y con arrastre hidraulico
Conozcamos las partes, como usar, mantener y operar el
modulo sanitario con arrastre hidraulico

Pgina 16

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

ROLLO PELICULA COLOR

UND

8.47

0.17

REVELADO DE FOTOGRAFIAS

UND

0.85

3.40

Taller "Habitos de Higiene y Seguimiento intradomiciliario"

H.

12.71

4.20

Taller "Participacion ciudadana"

H.

12.71

4.20

Taller "Aprendamos a conservar el agua y proteger nuestra


microcuenca"

H.

12.71

4.20

FOTOCOPIAS

UND

0.08

141.78

CAPACITACION DEL PERSONAL DE LA UNIDAD DE LA UNIDAD


DE CONTINGENCIAS

GLB

669.49

0.17

ANILLADOS

UND

1.69

3.06

IMPRESIONES

UND

0.42

118.15

HONORARIOS PROFESIONALES

DIA

25.42

0.68

VIATICOS

DIA

25.42

0.87

%MO

0.00

CAPACITACION A PERSONAL DE OBRA EN TEMA DE MEDIO


AMBIENTE

GLB

669.49

0.17

ADQUISICION DEL EQUIPO DE CONTINGENCIAS

GLB

847.46

0.17

MONITOREO AMBIENTAL

Pgina 17

CALENDARIO DE ADQ
PROYECTO

: "AMPLIACION Y MEJORAMIENTO DEL SISTEMA DE SANEAMIENTO BASIC

SECTOR

QOCHAPAMPA

FECHA:

Dec-15

DESCRIPCIN

UND

PRECIO S/.

PRESUPUESTO
CANTIDAD

DISPOSICION FINAL DE RESIDUOS

UND

847.46

0.17

ALQUILER ALMACEN

MES.

67.80

1.34

ALQUILER DE LOCAL

DIA

127.12

10.26

KG

0.03

53373.52

M3

25.43

187.17

TRANSPORTE DE MATERIALES POR PESO CUSCOPITUCANCHA


TRANSPORTE DE MATERIALES POR VOLUMEN CUSCOPITUCANCHA

COSTO DE ADQUISICIN POR MES


Los costos no incluyen IGV

Pgina 18

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

160.63

27.41

92.92

3.83

12.98

111.23

11.08

37.56

13.02

44.14

59.32

1.00

29.66

1.00

29.66

93.44

111.24

46.72

111.24

46.72

377.62

38.14

129.29

43.35

146.96

0.00

1.00

400.00

400.00
23728.88

28.00

115.59

23728.88

0.00

0.00

0.00

1649.06

479.75

1314.52

67.06

183.74

1482.45

2.42

153.67

2.16

137.16

800.14

2.90

208.89

6.15

442.98

1243.56

2.84

204.57

5.80

417.77

125.68

0.91

7.71

Pgina 19

0.00

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD
2.20

0.03

1205.28
387.52

0.04

1715.32
32.26

0.38

7212.71

er

MES
PRESUPUESTO

2
CANTIDAD
2.20

MES
PRESUPUESTO
0.00

0.00

14.72

1060.28

2.88

5.33

383.92

0.00

23.81

1715.32

32.26

0.00

0.00

762.47

449.86

345.62

7175.07

14378.58

99.57

2067.07

7.88

0.28

7.88

34.30

15.10

19.18

137.85

23989.33
do

0.00
10.80

0.00

13.72
0.00

344.54

8.66

55.08

44.94

285.84

959.29

2.57

43.56

3.37

57.12

24.74

1.98

9.70

2.30

11.27

3098.85

3.32

253.22

0.11

8.39

Pgina 20

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

22.54

2.80

22.54

0.00

2.85

0.11

2.85

0.00

18.44

0.68

18.44

0.00

83.71

0.00

0.00

359.48

0.00

1.28

24.95

102.72

0.43

0.55

4.60

5.84

137.99

1.43

21.81

7.44

113.46

816.82

0.00

0.00

3212.30

7.90

569.04

29.22

2104.47

218.91

12.04

20.35

19.50

32.96

0.00

0.00

0.04

0.04
735.56

28.00

735.56

2255.57

346.44

762.17

3306.18

0.00

Pgina 21

0.00
406.71

894.76
0.00

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

3915.24

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

0.00

do

MES
PRESUPUESTO
0.00

257.87

80.68

40.34

474.32

28.00

237.16

0.00

76.69

0.01

0.14

0.00

114.82

0.00

0.00

573.71

0.00

0.00

0.39

0.00

0.01

0.39

5.63

1.26

41.75

49.04

0.17

1541.86

0.00

2.12

0.00

432.82

216.41

0.00
1.00

2.12

36.00

2.40

36.00

58.26

1.02

29.13

1.02

29.13

33.19

0.00

1.00

33.19

189.28

0.00

112.00

189.28

Pgina 22

0.00

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD
1.53

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

0.00

1.00

do

MES
PRESUPUESTO
1.53

50.00

4.00

50.00

0.00

185.08

28.00

185.08

0.00

13.10

1.00

13.10

0.00

870.51

171.36

870.51

0.00

277.14

3.00

138.57

3.00

138.57

29.68

0.00

5.94

0.00

2.00

5.94

378.56

0.00

168.00

283.92

179.52

0.82

0.00

179.52

0.00

2.20

0.00

2.00

2.20

5.40

0.00

1.00

5.40

193.20

60.00

193.20

179.40

19.70

126.87

Pgina 23

0.00
8.16

52.53

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

MES
PRESUPUESTO

5167.35

431.49

1316.04

943.92

219.91

521.19

0.00

2405.76

3.06

7.77

0.00

0.00

0.00

21.33

5.54

do

16.90

7.11

2.00

4.74

1.00

2.37

23.04

3.00

17.28

1.00

5.76

525.10

59.00

525.10

0.00

25.60

0.00

0.00

14.40

0.00

0.00

156.80

0.00

0.00

141.96

0.00

82.68

0.00

40.64

0.00

2.00

5.08

26.28

1.00

13.14

39.42

2.00

Pgina 24

84.00

141.96
0.00

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

483.00

60.00

483.00

0.00

114.30

30.00

114.30

0.00

237.16

28.00

237.16

0.00

237.16

28.00

237.16

0.00

483.00

60.00

483.00

0.00

830.48

28.00

830.48

0.00

8.05

1.00

8.05

0.00

35.50

1.00

35.50

0.00

664.44

0.00

28.00

664.44

474.60

0.00

28.00

474.60

388.26

1.61

241.26

0.98

147.00

1345.61

208.18

1324.02

3.40

21.59

381.60

60.00

381.60

0.00

76.20

30.00

76.20

0.00

Pgina 25

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

593.32

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

0.00

0.00

759.36

28.00

759.36

0.00

533.96

28.00

533.96

0.00

166.10

1.00

83.05

1.00

83.05

0.00

3.00

122.04

4.00

312.00

203.40
780.00

1.00

78.00

1993.32

84.00

1993.32

66.95

0.00

0.00
1.00

66.95

89.10

30.00

89.10

53.46

2.00

5.94

8.00

23.76

46.61

0.00

1.00

46.61

8.05

0.00

1.00

8.05

8.05

0.00

1.00

8.05

5.94

0.00

Pgina 26

0.00

0.00

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD
2.12

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

0.00

0.00

14.85

1.00

2.97

0.00

2.12

1.00

2.12

0.00

24.00

2.00

12.00

2.00

12.00

8.00

0.00

2.06

8.00

30.48

0.00

4.00

10.01

23.32

0.00

7.00

14.84

299.04

56.00

106.40

299.04

0.00

0.00

112.00

85.12

6.00

4.86

76.14

88.00

71.28

635.70

30.00

635.70

0.00

23.66

0.00

0.00

61.00

0.00

0.00

53.34

0.00

0.00

Pgina 27

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

665.28

0.00

168.00

498.96

413.56

0.00

1.00

413.56

76.26

6.00

49.56

76.26

0.00

0.00

28.00

16.52

3.00

12.72

25.44

3.00

12.72

1423.80

28.00

1423.80

0.00

426.72

0.00

0.00

106.68

0.00

0.00

2373.00

28.00

2373.00

0.00

8.64

0.51

8.64

0.00

163.80

6.30

81.90

1.86

2.00

1.86

0.00

2.46

2.00

2.46

0.00

24.00

2.00

16.00

Pgina 28

6.30

1.00

81.90

8.00

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

7.04

0.00

2.00

7.04

27.96

0.00

2.01

28.13

6.40

0.00

1.00

6.40

135.19

6.38

135.19

218.38

304.58

216.25

3.00

2.13

85.44

0.00

8.00

42.72

17.14

0.00

2.00

17.14

50.70

3.00

118.64

0.00

50.70
0.00

0.00
2.00

118.64

457.68

1.00

38.14

644.08

2.00

161.02

6.00

483.06

84.75

0.26

22.04

0.24

20.34

2.36

5.61

2.36

0.00

5.05

2.38

5.05

0.00

Pgina 29

0.00

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

2.31

0.68

2.31

0.00

5.91

23.63

5.91

0.00

70.18

23.63

70.18

0.00

140.13

23.63

140.13

0.00

60.02

23.63

60.02

0.00

90.03

23.63

90.04

-0.01

46.08

23.63

46.07

0.00

4.02

23.58

4.01

0.00

42.37

0.02

42.37

0.00

1.73

0.17

1.73

0.00

1.73

0.17

1.73

0.00

1.73

0.17

1.73

0.00

1.73

0.17

1.73

0.00

1.73

0.17

1.73

0.00

Pgina 30

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

1.73

0.17

1.73

0.00

127.20

30.00

127.20

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.39

0.02

11.82

23.63

11.82

0.00

11.82

23.63

11.82

0.00

11.82

23.63

11.82

0.00

11.82

23.63

11.82

0.00

15.12

0.51

15.12

0.00

Pgina 31

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

1.44

0.34

1.44

0.00

0.72

0.35

0.73

0.00

5.76

0.34

5.76

0.00

4.32

0.34

4.32

0.00

0.65

0.17

0.65

0.00

0.58

0.68

0.58

0.00

1.73

0.68

1.73

0.00

2.36

5.61

2.36

0.00

4.53

1.19

4.53

0.00

0.50

1.19

0.50

0.00

0.34

0.02

0.34

0.00

10.68

0.84

10.68

0.00

10.68

0.84

10.68

0.00

17.29

1.36

17.29

0.00

Pgina 32

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

85.41

6.72

85.41

0.00

85.41

6.72

85.41

0.00

85.41

6.72

85.41

0.00

85.41

6.72

85.41

0.00

85.41

6.72

85.41

0.00

85.41

6.72

85.41

0.00

17.29

1.36

17.29

0.00

17.29

1.36

17.29

0.00

17.29

1.36

17.29

0.00

17.29

1.36

17.29

0.00

17.29

1.36

17.29

0.00

2.16

0.17

2.16

0.00

1.44

0.17

1.44

0.00

1.44

0.17

1.44

0.00

Pgina 33

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

1.44

0.17

1.44

0.00

1.44

0.17

1.44

0.00

1.44

0.17

1.44

0.00

1.44

0.17

1.44

0.00

1.44

0.17

1.44

0.00

1.44

0.17

1.44

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.41

0.00

14.41

0.17

14.39

0.00

14.41

0.17

14.41

0.00

20.84

24.52

20.84

0.00

Pgina 34

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

1.44

0.17

1.44

0.00

2.89

3.40

2.89

0.00

53.38

4.20

53.38

0.00

53.38

4.20

53.38

0.00

53.38

4.20

53.38

0.00

11.34

141.78

11.34

0.00

113.81

0.04

26.78

5.17

3.06

5.17

0.00

49.62

118.15

49.62

0.00

17.29

0.68

17.29

0.00

22.12

0.87

22.12

0.00

0.04

0.00

113.81

0.17

113.81

0.00

144.07

0.17

144.07

0.00

Pgina 35

0.04

0.04

26.78

0.00

DARIO DE ADQUISICIONES DE MATERIALES DE OBRA

MA DE SANEAMIENTO BASICO INTEGRAL EN LA COMUNIDAD DE PITUCANCHA Y SUS OCHO SECTORES, DISTRITO DE CAICAY, PR

0.2329468538

0.2436781331
22932.87

1
PRESUPUESTO

CANTIDAD

er

MES
PRESUPUESTO

23989.33
2
CANTIDAD

do

MES
PRESUPUESTO

144.07

0.17

144.07

0.00

90.85

1.34

90.85

0.00

1304.25

10.26

1304.25

0.00

1601.21

13,903.09

417.09

12558.48

376.75

4759.73

48.35

1229.54

43.67

1110.53

S/. 54,067.55

Pgina 36

S/. 22,771.25

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

16.15

54.75

0.00

8.71

29.53

0.00

0.00

0.00

0.00

0.00

101.37

0.00

0.00

0.00

0.00

0.00

19.49

115.59

0.00

55.04

150.80

0.00

12.94

821.41

2.06

148.27

0.00

8.62

621.22

0.00

4.75

40.22

29.90

5.83

9.18

Pgina 37

370.21

77.75

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

2.01

145.00

0.00

0.01

0.72

0.00

0.00

0.00

0.00

0.00

11462.45

6762.85

0.00

219.37

4554.12

28.05

582.32

0.00

0.00

1.10

1.40

0.00

27.57

137.85

0.00

0.01

0.06

0.56

3.56

50.66

858.61

0.00

0.00

0.77

3.77

32.69

2493.26

0.00
4.51

Pgina 38

343.98

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.82

83.71

1.61

31.38

15.55

303.15

5.78

7.34

70.07

88.99

0.00

0.00

0.18

2.72

71.40

816.82

6.92

498.45

0.56

40.34

44.15

74.61

53.84

90.99

0.00

0.00

0.00

0.00

0.00

272.11

598.64

0.00

224.91

3306.18

0.00

0.00

Pgina 39

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD
1.15

1.12

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

28.00

3915.24

0.58

1.07

0.54

0.00

28.00

237.16

0.00

5.65

76.55

0.00

2.82

114.82

52.20

11.19

521.51

0.00

0.00

0.05

1.66

0.00

90.97

1541.86

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 40

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

14.00

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29.68

0.00

0.00

0.00

0.00

56.00

94.64

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 41

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD
1005.22

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

3065.92

251.97

768.49

0.00

178.37

422.73

943.60

2396.74

0.49

1.25

9.00

21.33

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

25.60

0.00

2.00

14.40

0.00

0.00

56.00

0.00

156.80
0.00

11.00

23.32

28.00

14.00

35.56

0.00

0.00

0.00

Pgina 42

59.36

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 43

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

0.00

to

MES
PRESUPUESTO

28.00

593.32

0.00

0.00

0.00

0.00

0.00

0.00

2.00

81.36

0.00

5.00

390.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

23.76

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5.94

0.00

8.00

2.00

Pgina 44

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

1.00

2.12

0.00

4.00

11.88

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.06

20.47

0.00

4.00

8.48

0.00

0.00

0.00

0.00

28.00

21.28

0.00

0.00

0.00

0.00

14.00

23.66

0.00

4.00

61.00

0.00

14.00

53.34

0.00

Pgina 45

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

4
CANTIDAD
0.00

MES
PRESUPUESTO

56.00

166.32

0.00

0.00

0.00

0.00

0.00

13.97

19187.97
to

56.00

33.04

0.00

0.00

0.00

0.00

70.97

70.03

355.75

0.00

28.00

106.68

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 46

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

8.00

11.00

0.26

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

-0.17

0.00

0.00

0.00

0.00

0.00

0.00

42.72

0.00

0.00

0.00

0.00

0.00

0.00

0.00

419.54

0.00

0.00

0.00

22.04

0.24

20.33

0.00

0.00

0.00

0.00

Pgina 47

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 48

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 49

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

-0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 50

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pgina 51

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.00

0.00

0.00

0.00

Pgina 52

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

0.04

0.04

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

26.78

0.05

33.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.04

0.00

0.00

0.00

0.00

0.00

Pgina 53

OBRA

S, DISTRITO DE CAICAY, PROVINCIA DE PAUCARTAMBO-CUSCO"

0.3284679978

0.1949070153
32336.62

3
CANTIDAD

er

MES
PRESUPUESTO

19187.97
4
CANTIDAD

to

MES
PRESUPUESTO

0.00

0.00

0.00

0.00

0.00

0.00

13904.03

417.12

13008.43

390.25

48.35

1229.54

46.8

1190.12

S/. 32,493.79

S/. 11,267.22

Pgina 54

Pgina :

Recurso

Unid Cantidad
ad

TOPOGRAFO
HH 36.7600
OPERARIO
HH
###
OFICIAL
HH 547.1030
PEON
HH
###
ALAMBRE NEGRO RECOCIDO # 16
KG
47.3835
ALAMBRE NEGRO RECOCIDO # 8
KG
32.8112
ALDABA CON CANDADO
PZA
2.0000
ALAMBRE DE PUAS #16
ML 222.4800
CLAVOS PARA MADERA C/C 3"
KG 111.3910
CLORADOR AUTOMATICO
UND 1.0000
BIODIGESTOR DE 600 LTS
UND 28.0000
CLAVOS PARA CALAMINA
KG
19.4925
ACERO DE REFUERZO FY=4200 GRADO 60KG 601.8467
ARENA FINA
M3 23.3457
PIEDRA CHANCADA DE 3/4"
M3 11.1084
ARENA GRUESA
M3 17.2645
MATERIAL PROPIO PARA CAMA DE APOYO M3 14.8386
MATERIAL DE RELLENO
M3
0.0325
PIEDRA MEDIANA
M3 16.7330
PIEDRA GRANDE
M3
5.3800
GRAVA PARA FILTRO DE 3/4" - 1/2"
M3 23.8140
GRAVA PARA FILTRO DE 1"
M3
0.3811
LADRILLOS KK 10x14x24
UND
###
CEMENTO PORTLAND TIPO I (42.5KG)
BOL 692.6098
ADITIVO ACELERANTE FRAGUA
GLN
0.2752
CINTA TEFLON
UND 27.0079
OCRE ROJO IMPORTADO
KG
27.5709
YESO DE 28 Kg
BOL 54.1723
IMPERMEABILIZANTE
GLN 56.5953
CURADOR ANTISOL
KG
5.0490
PEGAMENTO PARA PVC 1/4 GLN
UND 40.6300
SILICONA
UND 2.8000
FORMADOR DE EMPAQUETADURAS 1/4 GL UND 0.1120
COLA SINTETICA FULLER
GLN
0.6800
SELLADOR DE MADERA
UND 2.8224
IMPRIMANTE
GLN 18.4442
LIJA
UND 80.8840
WINCHA
UND 9.0485
LISTONES DE 2"X3"X10
UND 71.4000
HORMIGON
M3 44.5967
AGUA
M3 129.5325
HIPOCLORITO DE CALCIO AL 70%
KG
0.0040
TAPA DE FG 25CM X 30CM P/AGUA CON UND 28.0000
MADERA NACIONAL P/ENCOFRADO-CARP P2
###
MADERA AGUANO 2x 2 x 10
UND 224.9100
PUERTA DE MADERA, TABLERO REBAJADO, UND 28.0000
ESTACA DE MADERA
P2 515.7400
CAJA DE DESAGUE DE 12"X24"
UND 56.0000
THINER
GLN
5.6555
BARNIZ MARINO
GLN
2.8224
PINTURA LATEX
GLN 12.3088
PINTURA ANTICORROSIVA EPOX-USO NAVAGLN
0.0100
PINTURA ESMALTE
GLN
1.4817
CALAMINA #25 DE 1.83Mx0.83Mx2.0mm PLN 90.9650
CANASTILLA DE BRONCE DE 1
PZA
1.0000
Tuberia FG 1 1/2"
ML
2.4000
Tuberia FG 1"
ML
2.0400
TUBO FIERRO GALVANIZADO 3"
ML
1.0000
CODO DE FG 90 D=1/2"
UND 112.0000
CODO DE FG 90 D=1"
UND 1.0000
CODO DE FG 90 D=2"
UND 4.0000
UAS GALVANIZADAS PARA LAVORATORIO JGO 28.0000
UNION SIMPLE DE F G 2"
UND 1.0000
TUBERIA CRIBADA PVC-SAL D=2" (7.5cm) ML 171.3600
BRIDA ROMPE AGUA, e=1/16"
UND 6.0000

Precio S/.

Parcial S/.

18.08
664.62
18.08 49,456.13
15.15 8,288.61
13.62 66,486.53
3.39
160.63
3.39
111.23
29.66
59.32
0.42
93.44
3.39
377.62
400.00
400.00
847.46 23,728.88
5.93
115.59
2.74 1,649.06
63.50 1,482.45
72.03
800.14
72.03 1,243.56
8.47
125.68
67.80
2.20
72.03 1,205.28
72.03
387.52
72.03 1,715.32
84.66
32.26
0.59 7,212.71
20.76 14,378.58
28.62
7.88
1.27
34.30
5.00
137.85
6.36
344.54
16.95
959.29
4.90
24.74
76.27 3,098.85
8.05
22.54
25.42
2.85
27.12
18.44
29.66
83.71
19.49
359.48
1.27
102.72
15.25
137.99
11.44
816.82
72.03 3,212.30
1.69
218.91
8.85
0.04
26.27
735.56
2.20 2,255.57
14.70 3,306.18
139.83 3,915.24
0.50
257.87
8.47
474.32
13.56
76.69
40.68
114.82
46.61
573.71
38.98
0.39
33.10
49.04
16.95 1,541.86
2.12
2.12
15.00
36.00
28.56
58.26
33.19
33.19
1.69
189.28
1.53
1.53
12.50
50.00
6.61
185.08
13.10
13.10
5.08
870.51
46.19
277.14

NIPLE DE F GALV. DE 3/4" X 1"


PZA 14.0000
NIPLE DE F GALV. DE 1" X 1 1/2"
PZA
2.0000
NIPLE DE F GALV. DE 1/2" X 1"
PZA 224.0000
CARTEL DE IDENTIFICACION DE OBRA 3.60ML
0.8160
NIPLE DE F GALV. DE 1" X 2"
PZA
2.0000
NIPLE DE F GALV. DE 4" X 1"
PZA
1.0000
SUMIDERO DE BRONCE DE 2"
UND 60.0000
TUBERIA PVC-U D=2" C-10
ML
27.8570
TUBERIA PVC-U D=1" C-10
ML
###
TUBERIA PVC-U D=1/2" C-10
ML 398.2794
TUBERIA PVC-U D=3/4" C-10
ML 947.1496
REDUCCION SP PVC SAP P/AGUA 1" A 3/4" UND 9.0000
UNION SP PVC SAP P/AGUA DE 1"
UND 3.0000
UNION SP PVC SAP P/AGUA DE 2"
UND 4.0000
TAPON MACHO SP PVC SAP P/AGUA DE 2" UND 59.0000
TAPON HEMBRA SP PVC SAP P/AGUA DE 3/ UND 4.0000
TAPON HEMBRA SP PVC SAP P/AGUA DE 1"UND 2.0000
CODO DE 45 SP PVC SAP P/AGUA DE 1/2" UND 56.0000
TEE SP PVC SAP P/AGUA DE 1/2"
UND 84.0000
TEE SP PVC SAP P/AGUA DE 3/4"
UND 39.0000
TEE SP PVC SAP P/AGUA DE 1"
UND 16.0000
TEE SP PVC SAP P/AGUA DE 2"
UND 3.0000
TEE SP PVC SAL DE4"X4"
UND 60.0000
REDUCCION PVC SAL DE 4"X2"
UND 30.0000
TEE SP PVC SAL DE 2"X2"
UND 28.0000
TUB. DE ABASTO DE 1/2 x 1/2 x 0.35m
UND 28.0000
TRAMPA PVC SAL 2"
UND 60.0000
TRAMPA "P" CROMADA DE 1 1/4
UND 28.0000
CONO REBOSE PVC D=2"
PZA
1.0000
CONO REBOSE PVC 6x4"
UND 1.0000
REGADERA PVC 1/2"
UND 28.0000
PILON (CIM) JARDIN ESFERICA DE 1/2" CROPZA 28.0000
CARRETILLA
UND 2.5884
TUBO PVC SAL 4" X 3M
ML 211.5739
YEE PVC SAL DE 4" X 2"
PZA 60.0000
YEE PVC SAL DE 2"
PZA 30.0000
LLAVE DE PASO PVC 1/2" DE 150 LBRS.
PZA 28.0000
LLAVE LAVATORIO CROMADO
UND 28.0000
DESAGUE LAVATORIO CROMADO
UND 28.0000
VALVULA COMPUERTA DE BRONCE DE 2" UND 2.0000
VALVULA COMPUERTA DE BRONCE DE 3/4"UND 5.0000
VALVULA COMPUERTA DE BRONCE DE 1" UND 10.0000
VALVULA TIPO BOLA DE 1/2"
UND 84.0000
VALVULA FLOTADORA VERTICAL 1"
UND 1.0000
SOMBRERO DE VENTILACION PVC SAL 2" PZA 30.0000
ADAPTADOR UPR PVC DE 1"
UND 18.0000
VALVULA DE COMPUERTA DE BRONCE DE 1UND 1.0000
CONO DE REBOSE PVC 2"
UND 1.0000
CONO DE REBOSE PVC 4"X2"
UND 1.0000
CODO 45 SP PVC SAP P/AGUA DE 1"
UND 2.0000
CODO 45 SP PVC SAP P/AGUA DE 3/4"
UND 1.0000
CODO 22.5 SP PVC 1"
UND 5.0000
CODO 11.25 SP PVC 1"
UND 1.0000
NIPLE PVC D= 1" L=1.5"
UND 4.0000
NIPLE PVC D= 2" L=2"
UND 2.0000
NIPLE PVC D= 1" L=1"
UND 12.0000
CODO 90 SP PVC SAP P/AGUA DE 1"
UND 11.0000
CODO 90 SP PVC SAP P/AGUA DE 2"
UND 56.0000
CODO 90 SP PVC SAP P/AGUA DE 1/2"
UND 140.0000
CODO 90 SP PVC SAL DE 2"
UND 94.0000
REGISTRO ROSCADO CROMADO 4"
UND 30.0000
ADAPTADOR UPR PVC 3/4"
UND 14.0000
VALVULA DE COMPUERTA DE BRONCE 3/4"UND 4.0000
UNION UNIVERSAL DE PVC DE 3/4"
UND 14.0000
UNION UNIVERSAL DE PVC DE 1/2"
UND 224.0000
BRIQUETA DE HIPOCLORITO DE CALCIO 65Barr 1.0000
PELDAOS DE TUBO FG 3/4"
UND 6.0000
ADAPTADOR UPR PVC 1/2"
UND 84.0000
BIZAGRA 4
UND 6.0000
LAVATORIO DE PARED BLANCO
UND 28.0000
BIZAGRA CAPUCHINA de 3 1/2" x 3 1/2" PAR 84.0000
PICAPORTE DE FIERRO 3"
UND 28.0000
INODORO DE TANQUE BAJO
UND 28.0000

2.12
2.97
1.69
220.00
1.10
5.40
3.22
6.44
3.05
2.37
2.54
2.37
2.37
5.76
8.90
6.40
7.20
2.80
1.69
2.12
2.54
13.14
8.05
3.81
8.47
8.47
8.05
29.66
8.05
35.50
23.73
16.95
150.00
6.36
6.36
2.54
21.19
27.12
19.07
83.05
40.68
78.00
23.73
66.95
2.97
2.97
46.61
8.05
8.05
2.97
2.12
2.97
2.12
6.00
4.00
2.54
2.12
5.34
0.76
0.81
21.19
1.69
15.25
3.81
2.97
413.56
12.71
0.59
4.24
50.85
5.08
3.81
84.75

29.68
5.94
378.56
179.52
2.20
5.40
193.20
179.40
5,167.35
943.92
2,405.76
21.33
7.11
23.04
525.10
25.60
14.40
156.80
141.96
82.68
40.64
39.42
483.00
114.30
237.16
237.16
483.00
830.48
8.05
35.50
664.44
474.60
388.26
1,345.61
381.60
76.20
593.32
759.36
533.96
166.10
203.40
780.00
1,993.32
66.95
89.10
53.46
46.61
8.05
8.05
5.94
2.12
14.85
2.12
24.00
8.00
30.48
23.32
299.04
106.40
76.14
635.70
23.66
61.00
53.34
665.28
413.56
76.26
49.56
25.44
1,423.80
426.72
106.68
2,373.00

ROLLIZO DE EUCALIPTO 8"X6.00M


PZA
0.5100
16.95
ROLLIZO DE EUCALIPTO 4"X3.00M
UND 12.6000
13.00
CODO DE 90 SP PVC 2"
UND 2.0000
0.93
CODO DE 45 SP PVC 2"
UND 2.0000
1.23
CANASTILLA DE PVC DE 2"
UND 3.0000
8.00
ADAPTADOR UPR PVC DE 2"
UND 2.0000
3.52
UNION UNIVERSAL DE PVC 2"
UND 2.0000
13.98
TAPON DE LIMPIEZA DE 2"
UND 1.0000
6.40
WATER STOP PVC DE 8"
ML
6.3800
21.19
TUBERIA PVC SAL 2"
ML 307.5840
0.71
UNION UNIVERSAL DE PVC DE 1"
UND 16.0000
5.34
UNION UNIVERSAL DE FG DE 1"
UND 2.0000
8.57
UNION UNIVERSAL DE FG DE 2"
UND 3.0000
16.90
MARC. Y TAPA PLANCHA ACERO LAC 1/8" 0UND 2.0000
59.32
MARC. Y TAPA PLANCHA ACERO LAC 1/8" 0UND 12.0000
38.14
MARC. Y TAPA PLANCHA ACERO 1/8" 0.60 UND 8.0000
80.51
CONTENEDORES HERMETICOS DE RESIDUO
UND 1.0000
84.75
PAPEL KRAFF
UND 5.6100
0.42
PLUMONES GRUESOS ROJO-AZUL-NEGRO UND 2.3800
2.12
CINTA MASKIN
UND 0.6800
3.39
DADOS
UND 23.6300
0.25
LUDO FAMILIAR
UND 23.6300
2.97
ROMPECABEZAS
UND 23.6300
5.93
AFICHES DE AUTOEVALUACION
UND 23.6300
2.54
GUIA METODOLOGICA
UND 23.6300
3.81
BOLSAS DE POLISEDA
UND 23.6300
1.95
VASITOS PLASTICOS
UND 23.6300
0.17
PROMOTOR SOCIAL
MES 0.0200 2,118.64
Conociendo los problemas de Saneamient UND 0.1700
10.17
Nos Queremos, Nos Cuidamos y Practicamos
UND 0.1700
10.17
Varones y Mujeres Trabajando Juntos por UND 0.1700
10.17
Conocemos la Importancia del Agua para la
UND 0.1700
10.17
Conocemos, Usamos y Cuidamos Nuestra Le
UND 0.1700
10.17
Conocemos y Evitamos las Enfermedades UND 0.1700
10.17
Manual "Conozcamos Nuestros Deberes y UND 30.0000
4.24
Presentacion del Modelo de intervencion UND 0.1700
84.75
Importancia del Agua para la Vida y la Sal UND 0.1700
84.75
Importancia de la Adecuada Eliminacion deUND 0.1700
84.75
Habitos de Higiene Personal y Ambiental UND 0.1700
84.75
Maqueta de Batea Domiciliaria (1, 2 y 3), GLB
0.1700
84.75
Maqueta de Letrina estandar
GLB
0.1700
84.75
Maqueta de Modulo Sanitario para Centro GLB
0.1700
84.75
El agua es Vida y Salud
UND 23.6300
0.50
Cuida y Usa tu Letrina
UND 23.6300
0.50
Lavado de Manos
UND 23.6300
0.50
Decalogo para el Buen Saneamiento y BueUND 23.6300
0.50
PAPEL BOND
MILL 0.5098
29.66
TIJERA
UND 0.3400
4.24
KUTER
UND 0.3400
2.12
ENGRAPADOR
UND 0.3400
16.95
PERFORADOR
UND 0.3400
12.71
Grapas
CJA
0.1700
3.81
Clips
CJA
0.6800
0.85
Rafia
RLL
0.6800
2.54
Cartulina
UND 5.6100
0.42
Cuadernos
UND 1.1900
3.81
Lapiceros
UND 1.1900
0.42
PASAJE IDA Y VUELTA
UND 0.0200
16.95
Taller "Identificacion y Analisis de la sit
H.
0.8400
12.71
Taller "Importancia de la organizacin y paH.
0.8400
12.71
Taller a JASS "Estatutos y Reglamentos" H.
1.3600
12.71
Taller "Genero"
H.
6.7200
12.71
Taller "Autoestima"
H.
6.7200
12.71
Taller "Importancia del Agua para la vida yH.
6.7200
12.71
Taller "Importancia de la disposicion adec H.
6.7200
12.71
Taller " Prevencion de enfermedades ligad H.
6.7200
12.71
Taller "Disposicion de residuos solidos y recH.
6.7200
12.71
Taller a JASS "Administracion, Contabilid H.
1.3600
12.71
Taller a JASS "Partes del Sistema"
H.
1.3600
12.71
Taller a JASS "Gasfiteria y Reparaciones" H.
1.3600
12.71
Taller a JASS "Operacin y Mantenimiento H.
1.3600
12.71
Taller a JASS "Cloracion y Desinfeccion" H.
1.3600
12.71
Conozcamos el estatuto y Reglamento para
UND 0.1700
12.71

8.64
163.80
1.86
2.46
24.00
7.04
27.96
6.40
135.19
218.38
85.44
17.14
50.70
118.64
457.68
644.08
84.75
2.36
5.05
2.31
5.91
70.18
140.13
60.02
90.03
46.08
4.02
42.37
1.73
1.73
1.73
1.73
1.73
1.73
127.20
14.41
14.41
14.41
14.41
14.41
14.41
14.41
11.82
11.82
11.82
11.82
15.12
1.44
0.72
5.76
4.32
0.65
0.58
1.73
2.36
4.53
0.50
0.34
10.68
10.68
17.29
85.41
85.41
85.41
85.41
85.41
85.41
17.29
17.29
17.29
17.29
17.29
2.16

Aprendamos a administrar, llevar nuestrasUND 0.1700


8.48
1.44
Conozcamos las partes de nuestro sistemaUND 0.1700
8.48
1.44
Aprendamos a operar y mantener nuestro U
s ND 0.1700
8.48
1.44
Aprendamos gasfiteria y como reparar nueUND 0.1700
8.48
1.44
Aprendamos a desinfectar y clorar nuestroUND 0.1700
8.48
1.44
Apoyemos a las familias para la practica dUND 0.1700
8.48
1.44
Aprendamos a construir, usar y mantener nu
UND 0.1700
8.48
1.44
Conozcamos las partes, como usar, mantene
UND 0.1700
8.48
1.44
"Cloracion y Desinfeccion"
UND 0.1700
84.75
14.41
"Partes del Sistema"
UND 0.1700
84.75
14.41
CAPTACION
UND 0.1700
84.75
14.41
CAMARA DISTRIBUIDORA DE CAUDALES UND 0.1700
84.75
14.41
FILTRO LENTO
UND 0.1700
84.75
14.41
RESERVORIO
UND 0.1700
84.75
14.41
CASETA DE VALVULAS
UND 0.1700
84.75
14.41
Certificado para el participante
UND 24.5200
0.85
20.84
ROLLO PELICULA COLOR
UND 0.1700
8.47
1.44
REVELADO DE FOTOGRAFIAS
UND 3.4000
0.85
2.89
Taller "Habitos de Higiene y Seguimiento iH.
4.2000
12.71
53.38
Taller "Participacion ciudadana"
H.
4.2000
12.71
53.38
Taller "Aprendamos a conservar el agua y H.
4.2000
12.71
53.38
BALDE PRUEBA-TAPON -ABRAZ. Y ACCESORHM 117.9719
5.34
629.97
MIRA TOPOGRAFICA
HE
59.6686
1.69
100.84
JALON
HE
2.9848
0.85
2.54
COMPACTADOR VIBR. TIPO PLANCHA 4 HP HM 144.4921
5.08
734.02
VIBRADOR DE 3/4" - 2" CONCRETO
HM
0.5897
6.36
3.75
MOTOSOLDADORA DE 250 AMP.
HM
5.6009
8.47
47.44
VIBRADORA 4HP 1.25
HM 20.5221
6.78
139.14
MEZCLADORA CONCRETO TROMPO 8 HP 9 HM 38.5847
7.20
277.81
TEODOLITO
HM 30.5849
4.77
145.89
NIVEL TOPOGRAFICO
HE
29.0882
3.18
92.50
FOTOCOPIAS
UND 141.7800
0.08
11.34
CAPACITACION DEL PERSONAL DE LA UNIDGLB
0.1700
669.49
113.81
ANILLADOS
UND 3.0600
1.69
5.17
IMPRESIONES
UND 118.1500
0.42
49.62
HONORARIOS PROFESIONALES
DIA
0.6800
25.42
17.29
VIATICOS
DIA
0.8700
25.42
22.12
MONITOREO AMBIENTAL
GLB
0.1700 2,118.64
360.17
CAPACITACION A PERSONAL DE OBRA EN TGLB
0.1700
669.49
113.81
ADQUISICION DEL EQUIPO DE CONTINGENC
GLB
0.1700
847.46
144.07
DISPOSICION FINAL DE RESIDUOS
UND 0.1700
847.46
144.07
ALQUILER ALMACEN
MES 1.3400
67.80
90.85
ALQUILER DE LOCAL
DIA 10.2600
127.12 1,304.25
TRANSPORTE DE MATERIALES POR PESO CKG
###
0.03 1,601.21
TRANSPORTE DE MATERIALES POR VOLUM M3 187.1700
25.43 4,759.73