800 in mix 1:20 and wood works with backside with pest chemical before fixing.
BASMENT
From ground level 3 feet with with mud or gravel or qauary dust
R.C.C WORKS
R.C.C. 1:2:4 beams roof slab lintel sunshine, loft and cupboard etc..,
PLASTERING WORKS
A) Internal: 1:3 in cm ceiling 1:4 with superfine smooth finish.
b) External: in 1:4 normal finish
FLOORING WORKS
Tiles flooring in hall , dining room, bed room and kitchen Rs . 50/
Rate / square feet. (Including laying charge)
Bathroom: flooring in grip tiles
Bathroom walls: 7 feet glassed tiles Rs. 30/ worth each sft
Kitchen walls: 4 feet from kitchen top Rs. 30/ worth each sft
CUDDAPAH SLABS
Bedroom : 4 -0 x 6 -0 x 1 -6
Kitchen: 4 -0 x1
Shower and wall mixer arrangements for attached both rooms with geyser point.
B)
C)
PLUMBING WORK
A)
B)
C)
One coat of primer and two coats of synthetic enamel paints on all wood Work and grills
B)
One coat suitable primer & two coat ace for outer walls
C)
One coat suitable primer & two coats tractor emulsion for inner walls
Bed room padak farme & flush doors (frame size 4 x 2.5)
C)
D)
STIARCASE
ELECTRICALS
Good materials and concealed wiring cooper for lights,
Fans and lamps and 15ams points with switches boards. (without fitting meter)with wooden switch
boxes closing with sandax sheet & 1 D.B box providing for 1 portion
Point details
kitchen
Light point
5A 2Nos
1No
1No
Fan point
1No
Power point
BEDROOM DETAILS
2 way point
2NO
Fan point
2 NO
2NO
1 NO
1NO
1 NO
Sockets
4 NO
1 NO(Wall down)
HALL DETAILS
Fan point
Show light point
2 no
2 no
1no
15 amps point
2 no
Socket
4 no
Telephone socket
1 no
5a t.v. point
1 no
1 no (wall down)
BATHROOM
Geyser point 15a
Light point
Wash basin light point
1no
1 no
1no
Only for point laying. (Not for accessories like light, fan, etc.,)
ADDITIONAL WORK
Low roof , septic tank, compound wall, water sump, water tank, water tank slab, extra floor in
outside, elevation, main board items, EB lines deposit, EB line cable , bore well, wall motor all are
charged extra from market rate.
USAGE OF MATERIALS
1.
Cement
2.
Steel
3.
Wood
4.
Plumbing
Closet
5. Electrical
5. Painting
MODE OF PAYMENT
1.
ADVANCE 10%
2.
3.
ROOF LEVEL-20%
4.
PLASTERING- 15%
5.
6.
NOTE
1.
2.
3.
4.
Increase material cost will be increase on market quotation rates will be raised
ESTIMATION
ROOM SIZE AND APPROXIMATE COST OF THE BUILDING
Residential building with two storey with covered car parking. This approximate cost is planned as
per the current market rate in the year of 2013 in tamilnadu.
GROUND FLOOR
DESCRIPTION
LENGTH (ft)
BREATH (ft)
AREA (sq.ft)
PARKING
11
16
176
OFFICE
18
16
288
SHOP
23
32
736
TOILET
4.5
27
1491
FIRST FLOOR
BED ROOM -1
11
16
176
BED ROOM -1
18
16
288
LIVING ROOM
11
15
165
KITCHEN
11
10
110
DINING
11
15
165
TOILET
5.25
42
WASH ROOM
12
60
STORE
30
1900
OTHER FACILITIES
DESCRIPTION
QTY
CAPACITY
lit
10000
lit
6000
SEPTIC TANK
lit
7000
DESCRIPTION
UNIT
RATE
AREA
AMOUNT
TOTAL AREA
sq.ft
1600
3391
5425600
lit
20
8000
160000
lit
22
6000
132000
SEPTIC TANK
lit
18
7000
126000
58,43600.00