A.

Determine the AREA covered by CHB


Area (A-1-2-3) =
Area*Quantity
Area (C-1-2) =
Area (E-1-2) =
Area (B-2-3) =
Area (C-3-5) =
Area (D-4-5) =
Area (F-2-5) =
Area (A-3-5) =
Area (1-A-C-E) =
Area (2-A-C-D-E) =
Area (3-A-B-C) =
Area (5-A-C-D-E) =
Area (A-2-3) =
Area (2-D-E) =
Area (2-C-D) =
Area (2-E-F) =

Span
3.97

Height
3.80

Area
15.09

3.97
3.80
3.97
3.80
1.59
4.10
3.06
4.10
1.53
4.10
4.65
4.10
3.06
4.10
9.56
3.80
36.33
4.02
5.30
21.31
4.02
4.10
16.48
9.52
4.10
39.03
1.59
4.10
1.94
5.30
2.60
5.30
0.96
5.30
AREA1 =257.57 sq. m

Area of Doors & Windows


Quantity Span
Height
15.09
15.09
6.52
12.55
6.27
19.07
19.07

D1
D2
D3
D4
D5
W1
W2
W3
W4

6.52
10.28
13.78
5.09

1
1

1
1.00
1
2.06
1
1.00
2
0.90
1
0.80
2
2.45
1
1.40
1.40
1.20
0.60
0.60
AREA opening

Area
2.20
2.20
2.20
2.20
2.20
1.50
1.20
1.68
0.72
= 25.73

2.20
4.53
2.20
1.98
1.76
3.68
1.68
1.68
0.36
sq. m

AREASub. Total = AREA1 + AREA2


=257.57+39.03
AREA Sub. Total=296.60 sq. m

Area of Foundation covered by CHB


Area
Area
Area
Area
Area
Area
Area
Area
Area
Area

(A-1-2-3-4-5) = 10.12
0.60
6.07
(C-1-2-3-4-5) = 10.12
0.60
6.07
(E-1-2) =
3.97
0.60
(G-1-2) =
3.97
0.60
(F-2-5) =
4.65
0.60
(1-A-B-C-D-E-F-G) =11.62 0.60
6.97
(2-F-G) =
3.06
0.60
(3-A-C) =
4.02
0.60
(5-A-C-D-F) =
9.52
0.60
5.71
(J-13-15-14) =
4.02
0.60
2.41
AREA2 =39.03 sq. m

Determine No. of CHB (0.10 x 0.20 x 0.40)


Let N be the No. of CHB
Area
per sq. m
N = 270.87

(12.50)

AREATotal = AREASub. Total- AREAopening


= 296.60-25.73
AREA Total=270.87 sq. m

2.38
2.38
2.79
1.84
2.41

No. of CHB

Say (considering safety factor of 10%)

3385.88

3725 pcs

Determine Cement & Sand


Class Mixture: Using CHB Class A Mortar; Area= 259.33 sq. m
Cement =
259.33 1.0800
280.07
SAY 280 BAGS
Sand = 259.33 0.0755
19.58
SAY 20 cu. m
For CHB Reinforcement Bars
Let R be the No. of Reinforcement Bars
R=
3566
x
0.32
=
1141.12 / 6
R=
190.19

SAY 191 pcs of 10mm dia. Bars

For Tire Wire


Let N be the No. of tie wire
N = 3566
x
0.001810
= 6.45
B.

SAY

7kg

VOLUME COVERED BY COLUMNS, FOOTINGS, AND BEAMS


VCF=1.10*1.10*0.25*15
VWF=0.30*0.10* 53.66
VC1=0.30*0.20*4.80*3
VC2=0.30*0.20*6.50*4
VC3=0.30*0.20*5.30*4
VC4=0.30*0.20*4.70*2
Vc5=0.30*0.20*4.85*2
VTB=0.20*0.20*53.66
VRB=0.25*0.15*53.6

CONCRETE PROPORTION
VOLUME
SAND
15.15
CEMENT
15.15
GRAVEL
15.15

= 4.54
= 1.61
=0.86
=1.56
=1.27
=0.56
=0.58
=2.15
=2.02
V=15.15m3
PROPORTION
0.50
9
1.00

7.58m3
136.35bags
15.15 m3

say 8m3
say 137bags
say 16 m3

2.20
4.53
2.20
3.96
1.76
7.36
1.68

VOLUME
V1: 4.02*3.97*0.20
V2: 4.54*3.97*0.20
V3: 3.06*3.97*0.20
V4: 1.59*2.00*0.20
V5: [(4.65*4.12)-3.18]*0.20
V6: 5.50*4.65*0.20
V7: 1.50*4.12*0.20

=3.19
=3.60
=2.43
=0.64
=3.20
=5.12
=1.24
19.42m3

CONCRETE PROPORTION
VOLUME
SAND
19.42
CEMENT
19.42
GRAVEL
19.42

C.

PROPORTION
0.50
9
1

9.71 m3
174.78 bags
19.42 m3

say 10 m3
say 175 bags
say 20m3

REBARS
*For Foundation
-Footing
- 15sets
Let L be the length of one Cut bar
L = 1.10 0.15 + 0.20
= 1.15 m
No. of 1.15m cut bar per 6m = 6/1.15 = 5.22
say 5pcs
Total No. of 1.15m cut bars = 10 (15) = 150 pcs
Let N be the No. 6m bar
N=

150
5

= 30 pcs

SAY 30 pcs of 12mm dia. Bars

Tire Wire
No. of kg = [(5) (5) (15) (0.30)]/53
= 2.12kg

SAY 3kg

-Wall Footing
Total Perimeter = 10.12 (2) + 4.02 (4) + 3.06 (4) + 3.97 (2) + 5.50 + 4.65
Total Perimeter = 66.65
Vertical Bars = (66.65
No. of Vertical Bars = 22.22

2.00)/6

Lateral Ties
N = 66.65/0.30
= 222.17
No. of 0.60/6m
Nu= 24
N= 223/24
N= 9.29

SAY 23 pcs of 10mm dia. DSB

say 223 pcs of lateral ties

SAY 10 pcs of 10mm dia. Bars

*For Tie Beam


Total Perimeter = 9.62 (2) + 8.62 (3) + 8.56
Total Perimeter = 53.66 m
No. of Horizontal Bars
N= (53.66
x
N= 35.77

4.00)/6

No. of Stirrups
N= 53.66/0.15
N= 357.73
Stirrups

SAY 36 pcs of 10mm dia. Bars

say 358 pcs of lateral ties

L= (0.20 0.075) + (0.20 0.075)2 + 0.10


L= 0.60 m

No. of 0.60/6m
Nu= 10
N= 358/10
N= 35.77
COLUMNS
A.) VERTICAL BARS
LENGTH OF ONE BAR
=4.80+0.50
=5.30

SAY 36 pcs of 9mm dia. Bars

LT=5.30(4)(2)
=42.4m

42.4
6

N=

7.07

SAY 8PCS

12mmx6m DSB

LATERAL TIES
L= [(0.30*0.20)+(0.20*2)]-(4*0.075)+0.10
=0.80m
LN=

4.80
+1]
0.15

(2)

=66 pcs
Lt= 66(0.80)= 52.80m

52.80
6

N=

8.80m

No of 0.80 height per 6m =

10 mmX 6 m

No. of

66
7

SAY9PCS

6
0.80

10mmX6m DSB

=7.5 SAY 7

=9.43 say 10 pcs

TIE WIRE

66 (4 )(0.30)
53

=1.49

SAY 2KG

B.) VERTICAL BARS


LENGTH OF ONE BAR
=5.3+0.50
=5.80
LT=5.80(4)(4)
=92.80m
N=

92.80
6

15.47

SAY 16PCS

12mmx6m DSB

LATERAL TIES
L= [(0.30*0.20)+(0.20*2)]-(4*0.075)+0.10
=0.80m
LN=

5.30
+1]
0.15

(4)

=145.33 pcs
Lt= 145.33(0.80)= 116.26m
N=

116.26
6

552.25
6

19.38

SAY 20PCS

10mmX6m DSB

=92.04 say 93 pcs

TIE WIRE

145.33(4)(0.30)
53

3.29KG

SAY 4KG

VERTICAL BARS
LENGTH OF ONE BAR
=6.50+0.50
=7.00m
LT=7.00(4)(4)
=112m
N=

112
6

18.67

LATERAL TIES
L= [(0.30*0.20)+(0.20*2)]-(4*0.075)+0.10
=0.80m

SAY 19PCS

12mmx6m DSB

LN=

6.50
+1]
0.15

(4)

=177.33 pcs
Lt= 177.33(0.80)= 141.86m
N=

141.86
6

= 23.64

No of 0.80 height per 6m =

177.33
7

SAY 24PCS

6
0.80

10mmX6m DSB

=7.50 SAY 7

=25.33 say 26 pcs

TIE WIRE

177.33(4)(0.30)
53

=4.02

SAY 5KG

VERTICAL BARS
LENGTH OF ONE BAR
=4.85+0.50
=5.35m
LT=5.50(4)(2)
= 42.8m
N=

42.8
6

= 7.13

SAY 8PCS

12mmx6m DSB

SAY 9PCS

10mmX6m DSB

12mmx6m DSB

LATERAL TIES
L= [(0.30*0.20)+(0.20*2)]-(4*0.075)+0.10
=0.80m
LN=

4.85
+1]
0.15

(4)

=66.67 pcs
Lt= 66.67(0.80)= 53.34m
N=

53.34
6

= 8.89 PCS

No of 0.80 height per 6m =

66.67
7.0

6
0.80

=7.5 SAY 7

=9.52 say 10 pcs

TIE WIRE

66.67 (4 )(0.30)
53

=1.51

SAY 2KG

VERTICAL BARS
LENGTH OF ONE BAR
=4.70+0.50
=5.20m
LT=5.20(4)(2)
= 41.60m
N=

41.60
6

= 6.93

LATERAL TIES
L= [(0.30*0.20)+(0.20*2)]-(4*0.075)+0.10
=0.80m
LN=

4.70
+1]
0.15

(4)

=64.67 pcs
Lt= 64.67(0.80)= 51.74m

SAY 7PCS

N=

51.74
6

= 8.62 PCS

No of 0.80 height per 6m =

64.67
7.0

SAY 9PCS

6
0.80

=9.24 say 10 pcs

10mmX6m DSB

=7.5 SAY 7

10mmX6m DSB

TIE WIRE

66.47 (4 )(0.30)
53
*ROOF BEAM
Total perimeter
No. of horizontal bars

=1.46

SAY 2KG

=9.62+11.62(2)+8.62(3)+4.12
=62.84m
=62.34(4)
=

No. of stirrups
=

251.36
6

=41.89 say 42pcs

62.84
0.15

=418.93 say 420 pcs

Length of stirrups
=(0.25-0.075)(2)+(0.15-0.075)(2)+0.10
= 0.60m

0.60
6

=
Tie wire

419
10

=10 pcs

42 pcs

9mmx6m DSB

10mmx6m DSB

419 ( 4 ) (0.30)
53

=9.49
*FLOORING

CEMENT
GRAVEL
SAND

SAY 10 KG

AREA
THICKNESS
AREA= 97.04
0.10
VOLUME OF SLAB=
9.70
m3
CONCRETE PROPORTION USING 10CM SLAB THICKNESS: CLASS A MORTAR CEMENT
AREA
PROPORTION
97.04
0.9
87.34 BAGS
SAY 88 BAGS
97.04
0.1
9.70 m3
SAY 10 m3
3
97.04
0.05
4.85 m
SAY 5m3

BACKFILL MATERIALS FOR THE ELEVATION


V1= 4.02*3.97*1.20
=19.15
V2= 4.54*3.97*1.00
=18.02
V3= 3.06*3.97*1.08
=13.13
V4= 1.59*2.00*1.10
=3.50
V5= [(4.65*4.12)-3.18]*1.20
=19.17
V6= 5.50*4.65*1.20
=30.69
V7= 1.50*4.12*0.98
=6.06
VT= 109.72cu.m(0.60)
=65.83cu.m say 66cu.m
BARS IN SLAB
AREA 1
11.62(3.97)

=46.13sq.m

11 . 62
0 .50

Ny =

3 . 97
0 .50

NX =
AREA 2

9.62(4.65)

=24.24 SAY 25PCS OF

= 7.94 + 1

=8.94

9 .62
0. 50

= 19.24 + 1

4 . 65
0 .50

NX =
4.12(1.50)

=10.30

SAY 11 PCS OF

= 8.24 + 1

= 3+ 1

=9.24

SAY 10 PCS OF

=4.00

SAY 5 PCS OF

TIE WIRE

[22 ( 8 )+18 ( 9 )+ 7(30)](0 . 30)


53

=3.10

SAY 4 KG

TRUSS
TRUSS 1 (5 SETS REQUIRED)
TOP AND BOTTOM CHORD
TOP
L=17.70

=
BOTTOM

17 . 70
(5 )
2. 22
39 . 86
6

L=10.00
=

SAY 9 PCS OF

=20.24 SAY 21PCS OF

= 9.30+ 1

1. 50
0. 50

NX =

10mm x 6m DSB

10mm x 6m DSB

10mm x 6m DSB

10mm x 6m DSB

=6.18sq.m

4 . 12
0 .50

Ny =

=44.73sq.m

Ny =

AREA 3

= 23.24 + 1

10
(5)
2 . 22

6.64 PCS 2X2X3/16 ANGLE BAR

10mm x 6m DSB

10mm x 6m DSB

WEB MEMBERS
KING POST

3.75PCS 2X2X3/16 ANGLE BAR

L=2.80

2 . 80
(5)
2. 22

=
QUEEN POST

22 . 52
6

6 . 31
6

1.05 PCS 1 x x 3/16 ANGLE BAR

L=2.20
=

2 . 20
2. 22

(5)

4 . 95
6
JACK POST

0.83PCS 1 x x 3/16 ANGLE BAR

L1=1.00
=

1.0
(5)
2 . 22
2 . 25
6

0.38 PCS 1 x x 3/16 ANGLE BAR

L2=2.70
=

2 . 70
( 5)
2. 22
6 . 08
6

1.01 PCS 1 x x 3/16 ANGLE BAR

L3=3.00
=

3 . 00
(5)
2. 22
6 . 76
6

1.13 PCS 1 x x 3/16 ANGLE BAR

L4=2.50
=

2 . 50
( 5)
2. 22
5 . 63
6

0.94 PCS 1 x x 3/16 ANGLE BAR

L5=1.60
=

1 . 60
(5)
2. 22

3 . 60
6

0.60 PCS 1 x x 3/16 ANGLE BAR

TOTAL:

10.40 PCS 2 x 2 x 3/16 ANGLE BAR SAY 11 PCS 2 x 2 x 3/16 ANGLE BAR
5.93 PCS 1 x x 3/16 ANGLE BAR
SAY 6 PCS 1 x x 3/16 ANGLE

BAR
TRUSS 2
- 5 sets required
Top and Bottom Chord

TOP

Length =

12
(5)
2 . 22

N=

27 . 03
6

= 4.50

BOTTOM

Length =

N=

SAY 4.50 pcs of 2 x 2 x 3/16 Angle Bar

8. 20
(5)
2. 22

18 . 47
6

= 3.08
WEB MEMBERS
King Post

Length =

N=

SAY 3.08 pcs of 2 x 2 x 3/16 Angle Bar

2 . 30
(5)
2. 22

5 . 18
6

= 0.86

SAY 0.86 pcs of 1 x x 3/16 Angle

Bar

Queen Post

Length =

N=

1 . 70
(5)
2 . 22
3 . 83
6

= 0.64

SAY 0.64 pcs 0f 1 x x 3/16 Angle

Bar

Jack Post

Length =

N=

1 . 00
(5)
2. 22

2 . 25
6

= 0.38

SAY 0.38 pcs of 1 x x 3/16 Angle

Bar

Length =

N=

2 . 80
(5)
2. 22
6 . 31
6

= 1.05

SAY 1.05 pcs of 1 x x 3/16 Angle

Bar

Length =

N=

2 . 80
(5)
2. 22
6 . 31
6

= 1.05

SAY 1.05 pcs of 1 x x 3/16 Angle

Bar
TOTAL:

7.58 pcs of 2 x 2 3/16 Angle Bar


3.98 pcs of 1 x x3/16 Angle Bar

TOTAL: SAY

8.00 pcs of 2 x 2 x3/16 Angle

Bar
4.00 pcs of 1 x x 3/16
Angle Bar
PURLINS
TRUSS1 (11 SETS REQUIRED)

N=10.82
=

10.82
(11)
6

=19.84
N=9.82
=

SAY 20 PCS OF 2 x 3 C PURLINS

9.82
(11)
6

=13.09

SAY 14 PCS OF 2 x 3 C PURLINS


TOTAL: 34 PCS OF 2 x 3 C PURLINS

ROOFING (LONG SPAN COLOR ROOF)


N=10.82
=

10.82
0.70

=15.46
N=9.82
=

9.82
0.70

=14.03

TEK SCREW

SAY 16 PCS

SAY 15 PCS
TOTAL ORDER: 48 GA 26 x 8 LONG SPAN ROOF
45 GA 26 x 8 LONG SPAN ROOF

N=48(18)+45(18)
=1674.00

KG=

ELECTRODES

1674
102

16.41 SAY 17.0 KG OF TEK SCREW

N=30(10)
=300 ELECTRODES
KG=

300
36

8.33 SAY 9 KG OF ELECTRODES

GUTTER
TOTAL PERIMETER =
=41.28 m

9.82+9.82 + 10.82 + 9.82 + 1


SAY 45.00m

DOWNSPOUT (4 SETS REQUIRED)


N=5.3
=

5.3
(4)
6

=3.53

SAY 4 PCS OF 4 DIA. PVC PIPES (6m)


SAY 10 PCS OF STANDARD 90

OR ELBOW PVC CONNECTOR

SAY 2 PCS OF STANDARD T PVC CONNECTOR


CEILING WORKS
AREA 1=
(11.62 x 3.97)

USING 2 x 2 CEILING JOIST

NY=

11.62
0.40

= 29.05 SAY 30PCS


NX =

3.97
0.40

=9.93 SAY 10 PCS


LT=30(11.62) + 10(3.97)
LT= 388.3 x

N=

3.28 ft
m

1273.62 ft
14 ft

=90.97 SAY 100 PCS OF 2 x 2 x 14 G. L.

AREA 2=

(9.62 x 4.65)

USING 2 x 2 CEILING JOIST

9.62
0.40

NY=

= 24.05 SAY 25PCS

4.65
0.40

NX =

=11.63 SAY 12 PCS


LT=25(9.62) + 4.65(12)

3.28 ft
m

LT= 380 x

N=

1246.40 ft
14 ft

=89.03 SAY 99 PCS OF 2 x 2 x 14 G. L.


AREA 3=

(4.12 x 1.5)

USING 2 x 2 CEILING JOIST

4.12
0.40

NY=

= 10.30 SAY 11 PCS

1.5
0.40

NX =

=3.75 SAY 4 PCS


LT=4.12(11) + 4(1.5)

3.28 ft
m

LT= 51.32 x

N=

168.33 ft
14 ft

=12.02 SAY 14 PCS OF 2 x 2 x 14 G. L.


FOR HANGERS
AREA 1=
(11.62 x 3.97)

USING 2 x 2 CEILING HANGERS

11.62
0.70

NY=

= 15.50 SAY 17 m

3.97
0.70

NX =

=5.67 SAY 7 m
LT=24 x 0.05

3.28 ft
m

LT= 1.2 x

N=

3.94 ft
14 ft

=0.28
AREA 2=

(9.62 x 4.65)

SAY 18 PCS OF 2 x 2 x 14 G. L.
USING 2 x 2 CEILING HANGERS

NY=

9.62
0.70

= 13.74 SAY 13.74 m


NX =

4.65
0.70

=6.64 SAY 6.64 PCS


LT=20.39 x 0.05
LT= 1.02 x

3.28 ft
m

3.34 ft
14 ft

N=

=0.24
AREA 3=

SAY 4 PCS OF 2 x 2 x 14 G. L.

(4.12 x 1.5)

USING 2 x 2 CEILING HANGERS

4.12
0.70

NY=
= 5.89
NX =

SAY 5.89 m

1.5
0.70

=2.14 SAY 14 m
LT=24 x 0.05
LT= 8.03 x

N=

3.28 ft
m

51.32 ft
14 ft

=12.02 SAY 14 PCS OF 2 x 2 x 14 G. L.


TOTAL=
FOR PLYWOOD

249.00 PCS OF 2 x 2 x 14 G.L.

AREA OF PLYWOOD
1.20 x 2.40= 2.88 SQ.M
TOTAL AREA= 97.04 SQ.M
N=

97.04
2.88

= 33.70 SAY 40 PCS OF PLYWOOD


FOR CORNICE MOULDING
TOTAL PERIMETER = 71.8m
=

71.80 x

3.28 ft
m

=235.50 SAY 245 ft OF CORNICE MOULDINGS


TILE WORKS
AREA FOR MASTERS BEDROOM
AREA FOR BEDROOM
AREA FOR LIVING AREA
AREA FOR KITCHEN
AREA FOR DINING AREA
AREA FOR TOILET & BATH
-FOR WALL OF T&B

AREA FOR TERRACE


AREA FOR FOYER
USING 0.40x0.40 TILES
ATILE=0.16 sq.m

(3.06) (4.02) = 12.30 sq.m


(3.97) (4.02) = 15.96 sq.m
(3.97) (4.54) = 18.02 sq.m
(4.65) (2.90) =13.49 sq.m
(4.65) (2.60) = 12.09 sq.m
(1.59) (1.70) = 2.70 sq.m
(1.59) (1.70) = 2.70 sq.m
(0.79) (1.70) = 1.34 sq.m
(1.70) (1.70) = 2.89 sq.m
(1.70) (1.70) = 2.89 sq.m
(1.50) (4.12) = 6.18 sq.m
(3.06) (3.97) = 12.15 sq.m
AREATOTAL=111.86 sq.m

FOR MASTERS BEDROOM

N=
= 76.88

FOR BEDROOM

N=
= 99.75

FOR LIVING AREA

N=
= 112.63

12.30
0.16
12.30
0.16
18.02
0.16

SAY 77 PCS

SAY 100 PCS

SAY 113 PCS

FOR KITCHEN

13.49
0.16

N=
= 84.31

FOR DINING AREA

12.09
0.16

N=
= 75.56

FOR FOYER

SAY 76 PCS

3.69
0.16

N=

= 23.06
FOR TERRACE

6.18
0.16

N=
= 38.63

FOR PORCH

= 75.94

USING GRANITE 0.60 x 0.60


AG=0.36 sq.m
FOR KITCHEN SINK

SAY 76 PCS

5.46
0.36

N=
= 15.17

USING FLOOR TILES (0.20 x 0.20)


AFT=0.04 sq.m
FOR TOILET & BATH

SAY 16 PCS

2.70
0.04

N=

= 67.50

SAY 68 PCS

USING WALL TILES (0.20 x 0.30)


AWT=0.06 sq.m
FOR TOILET AND BATH

9.83
0.06

N=
= 163.83

FOR KITCHEN SINK

2.66
0.06

N=
= 44.33

TILE TRIM
T&B

SAY 24 PCS

SAY 39 PCS

12.15
0.16

N=

SAY 85 PCS

SAY 164 PCS

SAY 45 PCS

PERIMETER= 1.59(2) + 1.70(6)


=13.88

3.28 ft
m

45.53 ft
8 ft

N=

=9.50
say 10 PCS OF PVC TILE TRIM
PERIMETER=2[2.90(3)+ 2(3)+ 0.80+ 1+ 6.66

KITCHEN SINK

46.32 x

N=

3.28 ft
m

151.93 ft
8 ft

=18.99

TILE ADHESIVE

say 19 PCS OF METAL TILE TRIM

TOTAL AREA= 111.86 sq.m


N=
ADHESIVE
TILE GROUT

111.86
4

= 27.97 bags

TOTAL AREA= 12.53 sq.m

say 30 BAGS OF TILE

N=

12.53
4

= 3.13BAGS

SAY 4 BAGS OF TILE GROUT

CONCRETE PROPORTIONAL
VOLUME

= 111.86(0.05)
= 5.59 cu.m
VOLUME
PROPORTION
5.59
0.50
=2.80cu.m
5.59
9
=50.34 bags
5.59
1.00
=5.59cu.m

SAND
CEMENT
GRAVEL

SAY 3cu.m
SAY 51 bags
SAY 6 cu.m

BALLUSTERS
TOTAL PERIMETER= 1.20(18)+ 1.50(4) + 4.12(2)
=35.84
UNIT COST (DOORS AND WINDOWS)
W1 (2.45

X 1.50) ANALOK WINDOW


(2.45*1.50)(5000)
=18375

W2 (1.40

X 1.20) CLEAR ANALOK


(1.40*1.20)(5000)
=8400

W3

(1.40 X 1.20) ANALOK WINDOW


(1.40*1.20)(5000)
=8400

W4 (1.20

X 1.20) ANALOK WINDOW


(1.20*1.20)(5000)
=7200

W5 (0.60X

0.60) ANALOK WINDOW


(0.60*0.60)(5000)
=1800

D1 (1.00 X 2.20) PANEL DOOR


(1.00*2.20)(5000)
=11000
D2 (2.06 X 2.20) PANEL DOOR
(2.06*2.20)(5000)
=22660
D3 (1.00 X 2.20) PANEL DOOR
(1.00*2.20)(5000)
=11000
D4 (0.90 X 2.20) PANEL DOOR
(0.90*2.20)(5000)
=9900
D5 (0.80 X 2.20) PANEL DOOR
(0.80*2.20)(5000)
=8800