SONATRACH

Daily Drilling Report


WELL & SIDETRACK :

DATE:

RDC18ST2

DAY: DOP: DFS:


RIG NAME & No:

SUPERVISOR/SUPERINTENDENT:

A.HAMIDI/A.DJABALLAH

LAST CSG/LNR SHOE:

TVD:

FORMATION TOP:

FIELD:

LAST CSG/LNR TOP:

AFE (KD):

1240days

LAST FM. TEST/EMW:

DAILY (KD):

1116785

L. BOP TEST:

2756,00m

ROT:

PROGRESS:

GRESRDC@3726,0m

ACC. FREE:

RHOURDCHEGGA

NDIL284

7,000in@3727,00m

TMD:

201 103,77 200,50 3728,00m 3727,00m

15/07/2016

WELL OBJECTIVE:

1581701

L.SAFETY MEETG:

02/07/2016

CUM (KD):

6451

DAILY NPT:

15/07/2016

RDC18

CUM NPT:

10,25hr

I.SERVICE:

143,71days

NONE

ACCIDENT / INCIDENT TOPICS:


BIT DATA
BITNo./Re-Run(U)

LAST BHA
/

BITRUNNo.
BITSIZE

MUD CHECKS

NAME:

()

TYPE1:

OD

TOOL

JTS

()

TYPE

No

LENGTH TYPE2:
()

DENSITY

(sg)

1,57
3728,0

DEPTH

(m)

BITTYPE

FLTEMP

(C)

BITIADCCODE

FUNVIS

(s/qt)

BITSERIALNo.

PV
YP

()

23,00

39

OIL

(%)

68,00

(cp)

15

H2O

(%)

(lbf/100ft)

OIL/H2O

(lbf/100ft)

5,00

LGS

(%)

2,60

(lbf/100ft)

7,00

HGS

(%)

19,89

ELIME (mL/mL)

3,70

BITDEPTHIN

()

APIFL

(cc/30min)

BITDEPTHOUT

()

HPHTFL

(cc/30min)

CUMPROGRESS

()

pH

(mg/L)

NaCLBrine

(mg/L) 21000,00

()

Mf

(cc)

1,40

Ca+

()

(cc)

2,00

K+

Pm

KCL

(ppm)

ES

(Volts) 1050,000

()

ITEM SINCE LAST INSPECT.

MUD LOSSES

MOTOR&TURBINE (day/cum)

SHOCKSUB

FUEL: 93,00m

SURF: 1,0m

MOTOR:

JAR

WATER: 110,00m

HOLE:

TURBINE:

BHA

AREA

CONTINENTAL-EMSCO

CONTINENTAL-EMSCO

BLOCKNo.
DIRECTION

PUMP DATA

MODEL

F-1600

F-1600

6,000

6,000

(in)

12,000

12,000

STROKE

NORD

ARGILESELGASSI DEPTH2

500

PERM.DATUM

SPM

45

LPM

713,07

AVDC:

11,5

NO

FORMATION

MATERIAL TRANSPORT
ITEM

UNIT

REC'D

USED ONLOC

SPM2

KELLYBUSHING
136,90

ELEVATION

7,83

KBtoGL

MUD VOLUME(m)

JetsVel(m/s):

W.O.C

SPM1

FMTARGET

PRESS (psi)

DP/CSG:

W.C

SLOW PUMP

HASSIMESSAOUD PRESS1

DEVIATED

10,3

TO

DEPTH1

95,0

AVDP:

FROM

HR

BASSIN

ANNULAR VELOCITY (m/min)

85,0000

(sg)

MBT

PUMP

EFF(%)

0,00

(mL/mL)
(mg/L/mg/L)

DAILY GEOLOGY DATA

WELL & LOCATION

LINER (in)

(mL/mL)

CaCL2

()

TOTALBHALENGTH

BITCOND(BGOR)

191900

CLBrine

1,30

BITCOND(IODL)

MAKE

CL-MUD(mL/mL)

(cc)

RPM(Min/Max)

PUMP

5,60
11,00

Pf

CUMHOURS

FUEL & WATER

8,00
90/10

GEL(10sec)
GEL(10m)

BITHSI

()

SAND

(%)

()

WOB(Min/Max)

/
1,59

(sg)

ECD

SOLIDS

BITTFA

CUMROP(WOC)

23:00/IN

TIME/LOC

BITMANUFACTURE

BITJETS

TIME/LOC

OBM

PRESS2
STRING WEIGHT(ton) & TORQUE(ft/lbf)

ACT.HKLD:

PICKUP:

SLACKOFF:

ROTATING:

STRING: 7,0

ANNULUS: 115,0

TQ.onBTM:

TQ.offBTM:

PITS: 309,0

TOTAL 431,0

BELOWJAR:

ABV.JAR:

MUD CHEMICAL USAGE


ITEM

UNITS

Barite

REC'D

USED

1,5T

6,000

ONLOC

ITEM

UNITS

REC'D

USED

ONLOC

E/W(-)
(m)

VS
(m)

DLS
(/30m)

219,000

SURVEY DATA
MD
(m)
3467,43

INC
()
1,01

AZI
()
43,93

TVD
(m)
3466,47

N/S(-)
(m)
-32,16

E/W(-)
(m)
-4,87

VS
(m)
4,87

DLS
(/30m)
0,07

MD
(m)

INC
()

AZI
()

TVD
(m)

N/S(-)
(m)

PERSONNEL DATA
COMPANY

NO

HOURS

27

0,00

MILITARY

A.ZEMMOURA+M.OUZERARA+A.TEDJINI+H.ZERGOUN
WEATHERFORD

0,00

TIGUERCHAABDNOUR

ISMAIL

NABORS

37

0,00

LOAYALROUSAN

0,00

NIANDOMABDOULKADER

SECURITYGPSA

26

0,00

A.BOUSHABA

0,00

MILITARYDRIVERS

SOFIALINE

0,00

AICHAOUI:ALAL+OMAR+ABDELKADER

NO

HOURS

0,00

A.KIOUS

ENSP

0,00

OFMC

21

0,00

ENSPTRAINEE(SIPEX)

MILITARYDRIVER

MISWACOWESTMANAGEMNT

OpenWellsPrinted: juillet16,2016at6:16am

COMPANY

NAMES
MILITARY

NAMES

SHDDRv5.0_22/Nov/2014

Page2sur3

SONATRACH

Daily Drilling Report


WELL & SIDETRACK :

DATE:

RDC18ST2

DAY: DOP: DFS:

15/07/2016

RIG NAME & No:

SUPERVISOR/SUPERINTENDENT:

A.HAMIDI/A.DJABALLAH

LAST CSG/LNR SHOE:

NDIL284

LAST CSG/LNR TOP:

7,000in@3727,00m

TMD:

TVD:

FORMATION TOP:

FIELD:

ACC. FREE:

RHOURDCHEGGA

LAST FM. TEST/EMW:

AFE (KD):

1240days

1116785

L. BOP TEST:

2756,00m

PROGRESS:

ROT:

GRESRDC@3726,0m

201 103,77 200,50 3728,00m 3727,00m

DAILY (KD):

L.SAFETY MEETG:

02/07/2016

CUM (KD):

6451

WELL OBJECTIVE:

1581701

DAILY NPT:

15/07/2016

10,25hr

RDC18

CUM NPT:

I.SERVICE:

143,71days

NONE

ACCIDENT / INCIDENT TOPICS:

PERSONNEL DATA
COMPANY

COMPANY

NO

HOURS

NAMES

SLBCEMENT

0,00

DADI,M+HAFIDH,B+TIRICHIN,M+BOUBAKER
MISWACO

SH/DDO

0,00

A.HAMIDI+M,BOUSSEKINE

NO

HOURS

0,00

NAMES
K.ALEM+R.BENHKEDDA

OPERATIONS SUMMARY
FROM-TO

HRS

PHASE CODE SUB

DESCRIPTION

00:00-01:45

1,75

8.5"

26P

RIH7"LINERWITH5"DPINOPENHOLE-Freely
*Run02lastsatndswithcirculationandtagbottomW/7 Tat3728m&confirm
bottomtwice

3520,0-3728,0

FROM-TO

01:45-03:45

2,00

8.5"

26N

RIGUPANDM/UPWFDCMTHEADANDCONNECTSLBCMTLINE
*TestSLBCementline-Negative-SLBCmtlineplugged

3728,0-3728,0

03:45-05:15

1,50

8.5"

26P

CIRCULATEPRIORHANGINGLINER
*Spaceoutliner1mfrombottom
*Q=800lpm-Pr=520Psi
*P/Up(weight)=147T-S/Off(weight)=145T

05:15-06:15

1,00

8.5"

26P

06:15-14:30

8,25

8.5"

13N

14:30-16:15

1,75

8.5"

16:15-17:15

1,00

17:15-17:30
17:30-18:45

NPT

NPT DETAIL NPT Co Op Co

BILL

ENF

T1

NDIL

T1

3728,0-3728,0

NDIL

T1

DROPBALLANDSET7"LINERHANGERW/2100Psi
*10TS/OFFWEIGHT+linerweight:53T
*Rotatestring08toursrightcheckrealiseokwithclearindicationatsurface
*Newneutralweight104T
*Increasepressureto3000Psitoshearballseat-Ok

3728,0-3728,0

WFD

T1

WAITINGSLBCEMENTLINE
*CirculatepriorCmtjobQ=800lpm;Pr=700psi
*RigupCmtlineandtestitat5000psi-ok*Heldpre-jobsafetymeeting

3728,0-3728,0

NDIL

T1

26P

7"LINERCEMENTJOB
*Pump5m3Spacerd=1.70sg&17,93m3Slurryd=1.90sg
*Nolossesrecorded

3728,0-3728,0

COPS

T2

8.5"

26P

DROPDART&DISPLACESLURRYBY3m3Spacer&39,50m3OBM
*1stBumpat1400psiwhendartlandinwiperplug,afterdisplacingw/3m3
Spacer&22m3OBM
*FinalPressureBumpat3500PsiandHolditfor10min-Ok
*NoReturnAfterBleedoffPressure
*Nolossesrecorded

3728,0-3728,0

COPS

T2

0,25

8.5"

26P

POOH3mANDS/OFFWEIGHTTOSHEARTOPSETPCKER-OK-

2756,0-2753,0

NDIL

T1

1,25

8.5"

26P

POOH11m&CIRCULATETOEJECTSPACER&CMTABOVETOPLINER
*Pickupweight=106T
*Q=1500lpmPr=1200Psi
*Ejected5mSpacer+4mofcontaminatedmud+02m3cement

3753,0-2742,0

NDIL

T1

18:45-19:30

0,75

8.5"

26P

DISCONNECTSLBCEMENTLINE&RIGDOWNWFDCEMENTHEAD

2742,0-2742,0

COPS

T1

19:30-00:00

4,50

8.5"

26P

POOHRUNNINGTOOLW/DP5"
*LaydownExcess5"DP(total:36jnts)12STANDS

2742,0-405,0

NDIL

T1

SFAL

CEMT

TEST

SEQP

COPS

COPS

AFTER MIDNIGHT OPERATIONS:

POOHRUNNINGTOOLW/DP5"F/405mTOSURFACE*LaydownExcess5"DP(total:78jnts)*LaydownRunningTool+RIH&LAYDOWN8"1/2PREVIOUSBHA*Laydown:
5"HWDP(12jts)
CURRENT OPERATION:

LAYDOWN8"1/2PREVIOUSBHA*Laydown:6"1/2DC(15jts)InProgress.
24 Hrs SUMMARY OPERATIONS:

RIH7"LINERWITH5"DPINOPENHOLE+RIGUPANDM/UPWFDCMTHEADANDCONNECTSLBCMTLINE+CIRCULATE+DROPBALLANDSET7"LINERHANGER
+WAITINGSLBCEMENTLINE+7"LINERCEMENTJOB+DROPDART&DISPLACESLURRY+POOH11m&CIRCULATETOEJECTSPACER
PLAN OPERATIONS:

BOP'STEST+RIH6"SLICKBHATOTOC@3689m,DRILLOUTCEMENT,CIRCULATEHOLECLEAN,DISPLACEMUD,DRILL01mINNEWFORMATION,CIRCULATE&
POOH
REQUIREMENTS / RENTAL EQUIPMENT:

NEEDTRUCKTOBACKLOADED6"1/2SLBD-JARSN97744H
REMARKS:

TotalNPTDaily//Cumul10.25hrs//3448.75hrs=143.69days
DownholeProblemsDaily//Cumul00.00hrs// 11.50hrs=0.48days
NaborsDaily//Cumul00.00hrs//3002.02hrs=125days
COPSDaily//Cumul10.25hrs//49.75hrs=2.07days
SH/DDODaily//Cumul00.00hrs//01.50hrs=0.95days
HALL/SPEERYSUNDaily//Cumul00.00hrs//53.75hrs=2.24days
HALLIBURTON/DSTDaily//Cumul00.00hrs//29.75hrs=1.24days
SLB/DeviationDaily//Cumul00.00hrs//62.75hrs=2.61days
SLB/JARDaily//Cumul00.00hrs//07.0hrs=0.30days
WESPDaily//Cumul00.00hrs/01.00hrs=0.04days
SH/DPDaily//Cumul00.00hrs/29.5hrs=1.23days
BADWEATHERDaily//Cumul00.00hrs//4.50hrs=0.187days
HESPDaily//Cumul00.00hrs//07.00hrs=0.29days
RigRepairT3=00.00//04.00hrs,NR=00.0hrs//00.00hrs(07/2016)

OpenWellsPrinted: juillet16,2016at6:16am

SHDDRv5.0_22/Nov/2014

Page3sur3

SONATRACH

Daily Drilling Report


WELL & SIDETRACK :
RDC18ST2

DATE:

DAY: DOP: DFS:

15/07/2016

SUPERVISOR/SUPERINTENDENT:

RIG NAME & No:

A.HAMIDI/A.DJABALLAH

LAST CSG/LNR SHOE:

NDIL284

LAST CSG/LNR TOP:

7,000in@3727,00m

TMD:

TVD:

FORMATION TOP:

FIELD:
RHOURDCHEGGA

LAST FM. TEST/EMW:

2756,00m

PROGRESS:

ROT:

GRESRDC@3726,0m

201 103,77 200,50 3728,00m 3727,00m

ACC. FREE:

AFE (KD):

1240days

L. BOP TEST:
02/07/2016

1116785

DAILY (KD):
6451

L.SAFETY MEETG:
15/07/2016

CUM (KD):

WELL OBJECTIVE:

1581701

DAILY NPT:
10,25hr

RDC18

CUM NPT:

I.SERVICE:

143,71days

ACCIDENT / INCIDENT TOPICS:

**************************************REMARKS***************************************
BOPSTACK-Hydril13''5/85K(TypeGK)
-CameronDoubleU13''5/85Kx13''5/85K:5''Upperpiperamsandblindrams
-DrillingSpool13''5/85Kx13''5/85K:Choke&Killline
-CameronSingleU13''5/85Kx13''5/85K:5''Lowerpiperams
*Received:bit6"PDCtypeMM74SN:12780073
*Received:bit6"TRCtypeXR+SN:RH5639
*backloaded:BAKERPOWERTONGS
Dieselonsite:Camp:13m,Rig:80m,Total:93m
ONLOCATION
*6"1/2SLBD-JARSN97744H
*SLB4"3/4DRILLINGJARSN80928J
*43/4HallibCoreBarrelTools
*RadioactiveSourcesince13/07/2016

OpenWellsPrinted: juillet16,2016at6:16am

SHDDRv5.0_22/Nov/2014

NONE

You might also like