You are on page 1of 1

To determine I) Swing curve II) critical clearing time for a single m/c connected

to infinity bus through a pair of identical transmission lines, 3-phase fault on one
of the lines for variation of inertia constant/ line parameters /fault
location/clearing time/pre-fault electrical output. 8. Formation of Jacobian for a
system not exceeding 4 buses *(no PV buses) in polar coordinates 9. Write a
program to perform load flow using Gauss- Seidel method (only p q bus) 10. To
determine fault currents and voltages in a single transmission line systems with
star-delta transformers at a specified location for SLGF, DLGF. 11. Load flow
analysis using Gauss- Siedel method for both pq and pv buses.
PS 49 12. Load flow analysis using NR method for both pq and pv buses. 13. Fast
decoupled flow method for both pq and pv buses. 14. Optimal Generator
Scheduling for Thermal power plants. 15. Economic dispatch using lambdaiteration method

You might also like