An architecture design process is a progress from conceptual to construction. There are few stages in a design
process. One of the design process included the preparation of construction drawings, which is the key in this process.
We are given an opportunity to visit the construction site of low rise or medium rise buildings from this project. In this
project, we need to produce a complete documentation and an analysis of construction elements, understand and be
able to explain current construction technology on local sites after we go to the site. We use visual images, sketches
and drawings to show the analysis and explanation.
02
Astana P8
In this construction project, there will be few different types of semi-d :
1.
TYPE A - a 2 storey semi-d with built-up 7,682 sf, included 4 + 2 bedrooms, 4 + 2 bathrooms and an individual lift.
2.
TYPE B1 - a 3 storey semi-d with built-up 6,869 sf, included 3 + 1 bedrooms, 3 +3 bathrooms and an individual lift.
3.
TYPE B2 - a 3 storey semi-d with built-up 6,889 sf, included 3 + 1 bedrooms, 3 + 4 bathrooms and an individual lift.
4.
TYPE B3 - a 3 storey semi-d with built-up 6,057 sf, included 5 + 1 bedrooms, 5 + 2 bathrooms and an individual lift.
5.
TYPE C - a 3 storey semi-d with built-up 7,340 sf, included 3 + 1 bedrooms, 3 + 3 bathrooms and an individual lift.
6.
TYPE C1 - a 3 storey semi-d with built-up 7,325 sf, included 3 + 1 bedrooms, 3 + 3 bathrooms and an individual lift.
TYPE A
SITE PLANS
TYPE B1
TYPE B2
TYPE B3
TYPE C
TYPE C1
04
A construction site is one of the most dangerous place you can be around and working within the
construction site is considered a 3-D (Dirty, Dangerous and Difficult) job. According to the
Department of Occupational Safety and Health (DOSH) in 2015, 88 construction workers die, which
is the highest recorded death compared to other industries. Another 149 other construction
workers suffer from disabilities due to accidents in the construction site. Thus, it is important that
workers working in this area are protected and equipped with safety equipments to reduce their
chances of death and injuries.
All workers entering and working are required to put on a helmet, high visibility jackets as well as
safety shoes. Depending on the job, workers may require to put on additional equipment such as
rubber boots, earplugs and masks.
06
At the entrance of the site, signboards are placed to warn visitors and workers about the
dangers and hazards of the construction site. A guard house is placed at the entrance to
prevent unauthorised entrance into the construction sites.
Safety signboards are placed at the entrance and visitors must be registered and
checked before entering
Map of assembly areas within the construction site. Contains location of fire extinguisher around
the sites.
Within the construction sites, there are a few emergency assembly points as well as fire
extinguishers throughout the construction sites. A first aid kit is also on standby within
the site in case of minor injuries.
07
Scaffoldings and safety nets are commonly used although the buildings are only three to four stories
high. Guard rails made out either with strong ropes or aluminum bars are also placed at stairwells
and high places to keep workers safe. These scaffolds can be used in conjunction with guard rails to
prevent workers from falling down and safety net on frame to catch heavy objects or materials that
fall from the scaffolding platform itself. These are some of the safety precautions when climbing up
or erecting scaffolding.
08
MACHINERIES
Most, if not all construction sites uses modern machinery to complete various tasks that are
impossible or takes a long time using manual labour work. From time to time, different machineries
are used for different tasks and different construction stages. Most of the machinery as
transported into the site through the entrance and temporary roads are laid for the machinery to
reach the specified location within the site. Most of the machinery used are movable and specialise
in low to midrise buildings. These are some of the machinery used within the site.
USED FOR - Carrying large loads such as bricks and concrete buckets
DURING - Structural Construction (Roof/Walls/Floors/Pillars)
09
Excavator
Another common machinery used in the construction site is the excavator. It is commonly used during the
early stages of the construction especially during landscaping, digging foundations and trenches to lay
utilities such as water pipes and cables. An excavator consists of an undercarriage where the tracks are
located. The cabin, engines and hydraulics are attached to the undercarriage to enable the boom arm and
bucket to rotate a full swing. The boom arm is powered by hydraulic pumps that moves the motors and
actuators within the boom arm and the bucket. Although the excavators boom arm could only move up and
down, the arm could reach a considerable distance from the cabin itself. The bucket allows the excavator to
scoop as well as dump dirt or anything that has been dug up.
10
Steamroller
A steamroller is used to smooth out the land and the dirt roads within the site itself. It is mostly used to compact the land and
the dirt roads to avoid heavy machineries to sink into the soft soil. A steamroller consists of one or two very heavy drums
which compacts the land as the steamroller moves. The drums can be modified to make them heavier to compact harder stuff
at the expense of speed or lubricated to prevent materials from sticking to the rollers.
USED FOR - Compacting soft soil/Paving temporary dirt roads
DURING - Earthworks/Structural Construction (Flatten Dirt Road Evenly)
11
12
Backhoe Loader
A backhoe loader is essentially a combination of an excavator and a bulldozer in a smaller unit. It has a
similar look to a tractor, the cab is located in the center with all round vision to enable the driver to
operate either of the bulldozer bucket or the excavator bucket. Just like the mobile cranes, a backhoe
loader has hydraulic outriggers which is deployed during excavation, as the backhoe loader does not have
enough weight on its own to support itself during excavation. Due to its compact size, it can go to places
with tight corners and spaces where other machineries can't. The back and front bucket can be switched
with blades, grab buckets and borers to perform different tasks.
13
Dump Truck
Commonly used to transport materials onto and off the construction site. The most common dumper used is the tandem
dump truck, where the cargo is unloaded using a hydraulic operated tipping skip. These trucks can travel on rough
terrain but theyre usually slow especially when carrying heavy loads.
Generator
Seen alongside heavy machineries such as cutting machine, drills, portable concrete mixers and bending machines,
these generators are needed to power these high-power machines as the main power supply is too far from the site or
not enough wattage provided through the mains. Power outage is common within construction sites as new wires are
laid or damaged during construction so a generator is needed to keep the construction on schedule. These generators
are usually powered by diesel and very noisy.
USED FOR - Providing power to machineries and important facilities
DURING - Entire construction phase
14
Facilities
These facilities are temporary buildings that are used to provide services, information and
convenience to the workers in the construction site. These buildings, such as site offices,
storages, sanitary conveniences that will be removed upon completion of the construction etc.
The facilities may be moved from time to time to a suitable location as construction
progresses. Usually, these facilities are either located in a completed building or the carpark to
minimise movement of the facilities as moving them costs thousands of ringgits.
Meeting Room - This room allows visitors and workers to communicate and conduct
meetings/briefings without interruption from the noise outside. Progress reports, plans and schedules
are pinned to the wall to be easily seen.
Permit by the governing body of the city is still required even to setup the temporary facilities
here as these buildings are considered service and office buildings. These permits are usually
pinned onto the notice board outside the office for inspection by local authorities.
15
Portable Toilets - Located just across the guard house and the site office and each worker has its
own responsibility to keep the toilets clean at all times.
Trash/Dump Area - Located throughout the site. Waste materials are dumped into these big
containers and are sent away once it is full.
16
Friction pile
Process
1. Setting up
Block setting out are done by licensed surveyors/contractor before
any form of piling works are carried out. Which included the pile
point numbering on site.
2. Piling
There are different type of piling machine such as drop hammer piling
machines and Injection piling machine is used to drive in the piles.
Those method is chosen to suit the condition of the site.
3. After piling done, a pit is excavated to install the pile cap. Before
installing the pile cap. Timber is then used as formwork on the
concrete of the pile cap. The concrete must reach the requirement set
by government which is Grade 30.
24
Construction process
Specific case study - On site
Deep foundation is used in this project due to it was a medium rise rise semi D which is
4 storeys height and to ensure the load of the structure is transferred down through the
upper weak layer of the topsoil to the stronger layer of subsoil below.
1.Excavation
Preliminary activity of the construction project. It starts from
the pits for the building foundations and continues up to the
handing over of the project. Excavator will dig a hole to set up
piling work including position of each pile.
2.Piling
Injection method is used due to the noise level produced can
not be higher than 95 decibels measures 15 m from the
source. The deviation is controlled under 75mm on plan from
its correct location.
5.Completion
Timber formwork is removed after 28 days when concrete is
set and completed piles was surveyed by a licensed surveyor
to ensure the actual position of piles (pile offsets) in As Built piling plan, to be endorsed by the same surveyor.
4.Pile Cap
Timber is then used as formwork, rebar is added for
reinforcement, pile stump reinforcement is added as well.
Concrete is then pour into the timber formwork, inspection
also take place in this phase.
25
2. Jacking Pile
(i) Insert pile into the Jack-In system clamp by using the on-board crane.
(ii) Clamped the pile and detach the crane cable.
(iii) Final vertical check and positioning by moving in the X and Y direction.
(iv) Commence jacking pile by applying jacking force onto the clamp device to press down the pile.
3. Jointing
The pile will be joined in accordance to conventional method or by way of MIG / CO2
welding.
4. Set
When the jacking pile reaches certain depth and refuses penetration at the desired
corresponding pressure, the pile may have set. If required, dolly may be used to jack-in
excess pile length to below ground level.
26
27
Pile Cap
Pile Cap - Piles are driven closely together in group or clusters that contain
from two to twenty-five piles each. The load is distributed over the head of the
piles in the group by means of a reinforced cast in-situ concrete pile cap. To
provide structure continuity the reinforcement in the piles is bonded into the
pile cap; this may necessitate the breaking out of the concrete from the heads
of the piles to expose the reinforcement. The heads of piles also penetrate the
base of the pile cap some 100mm to 150mm to ensure the continuity of the
members.
1. Excavation to the required level with open cut slope at safe angle
2.Blinding layer to the foundation level.
3.Erect formwork by using plywood according to the pile cap design.
4.Pile cap steel reinforcement is added.
5.The base is cleaned up before concreting.
6.Concrete discharging point will be established.
7.Sufficient vibrating poker is used to compact the concrete.
Pile cap section
Pile cap
column
Reinforcement bar
piles
28
In this project the most of the pile caps are 1 or 2 piles pile
caps due to structural load of the semi-D does not need the
large group piles pile cap to support. Thus the smaller piles
group of pile cap is sufficient enough to support the structure
which also reduce the cost and the piling duration.
29
SLAB
General Information - Referencing
Definition :
Concrete slab, a very common and important structural element, are constructed to provide flat , parallel and horizontal surfaces as construction of floor , wall or ceiling .The depth of a concrete slab floor
is very small compared to its span whose thickness ranges from 10 to 50 centimetres .Most of the slab are comprises of carefully worked out steel reinforcements in order to provide tensile strength to
the structure which is Reinforced Cement Concrete Slab ( RCC Slab ) .Formwork differs with the kind of slab. For a ground slab, the formwork may consist only of sidewalls pushed into the ground
whereas for a suspended slab, the form-work is shaped like a tray, often supported by a temporary scaffold until the concrete sets.
Ground Slab
Suspended Slab
31
Ground Slab
These slabs are constructed entirely above the ground by pouring concrete over a grid of
polystyrene blocks known as 'void forms'. Waffle raft slabs are generally suitable for Class
A,Class S, Class M, Class H and Class E soils These types of slab are only suitable for very
flat ground. On sloping ground or with more complex designs, a stiffened raft slab is normally
the better option
3.
Infill slab
Pre-poured concrete beams set in channels through the middle of the slab, creating a kind of
supporting grid of concrete on the base of the slab ,suited to Class M, Class H and Class E
soils .
Infill slabs are simply poured between existing walls, so no formwork is required.The
masonry wall and concrete slab must be separated from one another because they shrink or
expand at different rates. If they are not separated the risk that the slab may develop
unsightly cracks along the wall edge is increased.Can only be constructed on Class A or
Class S sites
32
Waffle slab
flat slab
32
Excavate
2.
Construct form
3.
Prepare subsurface
a.
b.
c.
4.
5.
6.
7.
Embed anchors
33
1.
Excavate
At this point , the building has already been located and batter boards are in
place .Now, trenches or excavations are made for the footings ,drains ,and
other floor features. These must be deeper than the rest of the slab.The
locating and digging for slab footings is the same as for foundation footing
,The trenches can be be dug and rough lines are used for guides. The
excavation are then checked for depth level for main utility lines .
Batter board
After the excavation is done ,the corner are relocated. Lines are restrung on batter boards
and the corners are plumbed .Lumber is brought to construct the forms . Monolithic forms are
made like footing forms which top board is placed and leveled first with the corner ,Next
,sand or gravel is dumped inside the form area .
First of all ,the ground under any type of slab must be prepared for moisture control . Water must be kept
from seeping up through a slab and drained from under the slab .Outside moisture can be reduced by using
good siding methods and stepped up the edges of the slab using bricks .Once the sand is leveled, the
moisture barrier is laid .As a rule, plastic sheet are used for moisture barrier to cover the whole subsurface
area .The strips should overlap at least 2 inches at the edges .
34
All the opening in pipes are then covered to prevent them from clogging with dirt or
concrete. Metal or plastic pipes are used for the drain while conduit which laid under
the the slab are used for electrical wires .
35
36
Type of Reinforcement
Specific Case Study - On Site
Format A , Square mesh is type of steel reinforcement fabric is used in our site with
standard sheet size ~ 4.8m long x 2.4m wide
standard roll size ~ 48m and 72m long x 2.4m wide
Grade notation : Mild steel
Grade 250 or 250N/mmcharacteristic tensile strength ( 0.25% carbon , 0.06%
sulphur and 0.06% phosphorus )
Square twisted steel bars
Standard bar diameter ~ 6,8,10,12,16,20,25,32 and 40mm
37
After the corner of the forms are levels with a transit , the volume of concrete needed is
estimated .When pouring is ready ,the builder spread ,carry and level the concrete .As the
concrete is poured , it was spreaded and tamped by using a board or shovel .Tamping
helps get rid of air pocket to make the concrete solidly fill all the form. This is done with
a long board called a strike-off .
Darby concrete
38
Second Floor
Ground Floor
First Floor
39
Columns
General Information - Referencing
A column or pillar in architecture and structural engineering is a structural element that transmits, through compression, the weight of the
structure above to other structural elements below .Most of the high rises building uses Reinforced Cement Concrete techniques include our
site construction . In an RCC framed structure, the load is transferred from a slab to the beams then to the columns and further to lower
columns and finally to the foundation which in turn transfers it to the soil. The walls in such structures are constructed after the frame is
ready. Cement concrete is strong in compressive strength but weak in tensile strength. To increase tensile strength in the structure ,we use
mild steel bars in cement concrete. Usually steel bars are roughened or corrugated to further improve the bond or cohesion between the
concrete and steel .Curing of all concrete is done at least for 20 days.
40
1.
Location of columns are determined practically on the site. It is done by laying rope according to grids shown in
the drawing and then mark the location of columns related to rope.In drawing , column locations are shown related
to grid-line with dimension which in field, ropes are our grid-line. So we place columns related to rope-line by
measuring dimension shown in the drawing.
41
3.
Column formwork
The formwork has been erected to retain the wet concrete and resist the initial hydrostatic pressure .Clamps or
yokes are used at equal centres for batch filling and at varying centres for complete filling in one pour to keep the
thickness of the formwork material to a minimum . Column forms are located at 75 to 100mm high concrete plinth
or kicker which has the dual function of location and preventing grout loss from the bottom of the column
formwork .
4.
Crane , concrete bucket , pumps ,chute and shovel are used to spread concrete. Concrete are delivered within 75 minutes after
adding the water to the cement and compacted within 45 minutes of arrival . Mechanical vibrators are used to prevent
formation of construction joint with the previous layer which has not taken initial settlement .
Concrete bucket
42
Ground Floor
RC ROOF BEAM
First Floor
Second Floor
43
Column Schedule
Specific Case Study - On Site
44
Walls
General Information - Referencing
A wall is a continuous, usually vertical structure, which is thin relative to its length
and height. The prime function of an external wall is to provide shelter against wind,
rain and the daily seasonal variations of outside temperature normal to its location,
for reasonable indoor comfort.
Functional requirements :
The function of a wall is to enclose and protect a building or to divide space within a building.
-
Fire safety
Security
Aesthetics
45
Types of walls
Loadbearing wall
Wall that bears a load resting upon it by conducting its weight to a foundation structure.The
materials most often used to construct load-bearing walls in large buildings are concrete,
block, or brick. Depending on the type of building and the number of stories, load-bearing
walls are gauged to the appropriate thickness to carry the weight above them.
Housing
Tall buildings
Wall partition
Protection from the elements
46
Mortar :
Used to joint masonry units together, bond reinforcing steel to the masonry, and seal
the masonry wall against wind and rain penetration. It consists of Portland or
masonry cement, hydrated lime, aggregate, and water.
47
Bricks
Bricks are walling units within a length of 337.5mm, a width of 225mm and a height of
112.5mm. Standard size of brick is 215mm x 102.5mm x 65mm.
Types of brick :
Clay bricks
Calcium silicate bricks ( sand-lime )
Concrete bricks
Special bricks
Dimension :
Types of bricks
48
Brickwork
Running Bond
Common Bond
Stack Bond
Dutch Bond
English Bond
Flemish Bond
Each course consists of alternating headers &
stretchers.
49
50
Wall finishes
Plastering
Painting
Wall Tiling
Gypsum plaster
Types of tiles :
Glazed wall tile
Ceramic mosaic tile
Quarry and Paver tiles
51
Masonry wall
Specific Case Study - On Site
Stretcher bond/ Running bond is used.
Mortar joint :
Metal ties
Metal ties
Concave
Flush
52
Masonry wall
Specific Case Study - On Site
Legend :
Internal wall
External wall
53
Preparation
2.
iii. Remove the dry course from the foundation, then throw a mortar line on the foundation.
iv. Furrow the mortar with the point of trowel. Divide the mortar cleanly with the trowel.
Preparation
3.
Filling the leads
i. Mix the Mortar Mix with water until smooth, plastic-like consistency.
ii. Make a dry run by laying a course of stretcher bricks along the chalk line for the
entire length of the wall.
54
55
56
Process of Application :
1.
Preparation
2. Undercoating
3. Finishing
57
4. Spacers
It is advisable to use tile spacers to
ensure accurate spacing between the tile.
2. Apply mortar
First apply mortar using the flat side of the
trowel to promote substrate contact. Then,
using the recommended notch trowel at a 45degree angle, spread the mortar uniformly in a
ridged pattern. Continue applying mortar in a
straight pattern.
3. Set tiles
Press tile into mortar with a slight twisting motion. Check often for
uniform lines
58
Stairway
Function of staircase :
Requirements :
Ease of use
Fire safety
Safety in use
Durability
Aesthetics
59
Stairway
General Information - Referencing
Stair terminology
Baluster/Spindle - the vertical member, plain or decorative,
that acts as the infill between the handrail and baserail (or
tread if cut string).
60
Stairway
Bricks stair
Mostly founded in village area
Its very much easy and less costly
Fire resistive
Consumes more space due to absence of waist slab
Not attractive/ decorative
Mostly used at entrance of the building
1.
-
Stone stair
Stronger compared to the brick stair
Fire resistive
Mostly found in temple areas
Need dressing, skilled masons are required
Less costly except ornamental stones
1.
-
Concrete stair
Widely used in residential and commercial buildings
Strongest compared to all
Fire resistive
Used as permanent staircase
Can be moulded in various shapes
4. Wooden stair
Mostly temporary used
Less costly
Afraid of fire hazard
Easy to construct
Least strong among all
5. Metal/Steel stair
Strong and ductile
High cost
Commercial purpose
High load carrying capacity
Less thick
61
Stairway
landing
62
Stairway
Section drawing
63
Advantages :
Visually interesting. Provide a visual barrier between floors, have better
privacy. Helps in sound transmission. The landing provides a place to
rest while ascending.
Disadvantages :
Harder to build. Handrails required more skill to construct.
Applied on every floors except 2nd floor.
25 number of steps.
64
65
Nyatoh Door
Doors and windows are very special components of walls. Doors and doorways
provide approach from the outside into the interior of a building as well as passage
between interior spaces. Doorways should have large spaces which allow people to
move through easily and accommodate the moving of furnishings and equipment.
Doorways should be located so that the patterns of movement they create between
and within spaces are appropriate to the uses and activities housed by the spaces.
Windows allow for simultaneous control of the passage of light, air, and sight
through walls. There are various sizes of windows which affects not only the
physical appearance of a building, but also the natural lightning, view potential and
spatial quality of the buildings interior spaces.
low-cost
Is relatively soft wood compared to most exotic hardwoods
67
Construction Process
As shown in the illustration below, panel doors are made
from a framework of stiles and rails that hold wood
panels. This construction method is common because it
minimizes the effects of woods tendency to shrink,
warp, and swell with variations in humidity.
68
69
70
B) Sub-Frame System
The sub-frame system comprises a subframe which is either cast in or anchored to
the wall. The main frame is then installed onto the subframe at a much later stage of
the construction.
71
Definition
Roof can be defined as the external upper covering of a house or other building, a
frame for supporting, the highest part or summit. Besides, it also defined as
something that in form or position resembles the roof of a house, as the top of a
car, the upper part of the mouth and etc. It also can be a noun that refers to a
house.
7.1. GENERAL INFO (REFERENCES)
7.1.1. TYPES OF ROOF
Gable roof designs are one of the more simple styles when it comes to roofs. The
gable roof style looks like an inverted/upside down V. Gable roofs are not ideal for
areas with high wind because they easily can catch the wind much like a sail
would.
Flat roofs are common especially with commercial buildings. Flat roofs are
definitely the most simple roof to build because they have little to no pitch. The
most common types of roofing systems used with flat roofs are rubber roofing
systems.
Hip roofs are a common residential style roof. This type of roof is more
difficult to construct when compared to flat roofs and gable roofs because
they have a more complicated truss and rafter structure. A hip roof style
roof has four sloping sides with zero vertical roof lines/walls. Hip roofs
can be both square and rectangular.
Dutch hip roof is basically a hip roof with a small gable at either end. The
gables can be used as ventilation.
Shed roof is basically a flat roof but has more pitch. It is frequently used
for additions on homes or other roof styles.
73
Mansard roof is a french design and is more difficult to construct than the hip or
gable roof.
Butterfly roof is not a roof style that is widely used.The style provides plenty of
light and ventilation but is not the effective when it comes to water drainage.
Winged gable roof varies slightly from the tradition gable roof. It varies by
extended outwards from the peak of the roof.
Frame roof is very popular for churches, cottages, homes, and other structures.
The roof acts as both the roof and the walls for a structure.
Folded plate roof has limited use in single family homes. It looks like a series of
small gable roofs placed side by side of each other.
ROOF MATERIALS
Asphalt shingles are the most commonly used steep slope/residential roofing
material used on roofs in the United States. Asphalt shingles vary in quality and are
produced by multiple manufacturers.
Wood shake shingle is the inspiration for the modern day asphalt shingles. Similar
to the asphalt shingle, the wood shake overlaps each other making the roof or
siding weather proof. A down side to shake is that they often need more
maintenance than newer asphalt or fiberglass shingles. An upside to shake the
unique rustic look they give to a structure.
Slate shingles are created out of a sedimentary rock. This rock can be split into
thin sheets that are ideal for roofing shingles.
Metal is a very common material used for roofs. There are many different types of
metal roofing systems available. The types of metal used with available systems
varies from zinc to steel, copper, aluminum, and tin.
Membrane roofing products are used on flat roofs. Some of the various brands or
variations of rubber roofs are modified bitumen, thermoplastic membrane, epdm,
single ply, tpo, cpa, cpe, nbp, and others.
Tile is one of the more expensive materials used for roofs. Although the traditional
clay tile is probably the most well known tile material it is not the only one. Other
materials that are used to create tile products are metal, concrete, slate, and
various synthetic compositions.
74
7.3.1. INTRODUCTION
Metal Roof Deck is designed for flat, pitched, or arched construction on virtually all
types of buildings. Roof deck is commonly used because it is strong, light in weight,
economical, and easy to install.
7.3.2. TYPES
1.Type A Roof Deck is a 1 1/2" deep, narrow rib, structural metal roof deck section
that provides a wide support surface for various types of roofing materials, and
thinner rigid insulation. Roof deck products act alone in transferring horizontal and
vertical loads into the building frame, and do not work compositely with other
building materials. Type A metal roofing deck is available in 22, 20, 18, and 16 gauge
with either a galvanized (G60 or G90) finish or prime painted (gray or white) to
inhibit rust while in transit (primer is not a finish coat). Material is typically in stock
in 20 gauge, G90 or Gray Primer in 36 cover width.
2.Type B Roof Deck is a 1 1/2" deep, wide rib, structural metal roof deck section
that provides a support surface for various types of roofing materials, and 1 or
thicker rigid insulation. Roof deck products act alone in transferring horizontal and
vertical loads into the building frame, and do not work compositely with other
building materials. Type B metal roofing deck is available in 24, 22, 20, 18, & 16
gauge with either a galvanized (G60 or G90) finish or prime painted (gray or white)
to inhibit rust while in transit (primer is not a finish coat). Material is typically in
stock in 22, 20 & 18 gauge, G60, G90 or Gray Primer in 36 width.
75
3.Type F Roof Deck is a 1 1/2" deep, intermediate rib metal roof deck that
provides an economical roofing system of structural load carrying capacity and
roofing insulation materials. Roof deck products act alone in transferring horizontal
and vertical loads into the building frame, and do not work compositely with other
building materials. Type F Metal Roof Deck is available in 22, 20, & 18 gauge with
either a galvanized (G60 or G90) finish or prime painted (gray or white) to inhibit
rust while in transit (primer is not a finish coat). Material is typically in stock in 22
& 20 gauge, G90 or Gray Primer in 36 cover width.
4.Type N Roof Deck is a 3" tall, deep rib metal roof deck, that is designed to provide
an economical roofing support surface when longer spans are required between roofing
supports. Roof deck products act alone in transferring horizontal and vertical loads
into the building frame, and do not work compositely with other building materials.
Type N Metal Roof Deck is available in 22, 20, 18, & 16 gauge with either a galvanized
(G60 or G90) finish or prime painted (gray or white) to inhibit rust while in transit
(primer is not a finish coat). Material is typically in stock in 20 & 18 gauge, G60 or
Gray Primer in 24 cover width.
76
CONSTRUCTION PROCESS
1. Pre Start: Prior to commencement of deck installation, a system of fall protection and
safe access must be in place.
2.Weather conditions: Decking bundles should not be opened if all the sheets in the bundle
cannot be fixed or left in a safe condition at the end of the shift. Consideration must be
given during periods of bad weather and any unfixed sheets should be secured at the end
of each day by using a temporary strap secured to the frame or decking.
3.Supporting structure: Fixings the minimum bearing requirements for the decking are
50mm on steelwork (this is increased to 60mm where sheets are to receive thru deck
welded shear studs) and 70mm on masonry or concrete.
4.Access to Level: Wherever possible the decking installation should be planned to
commence from the corner of a building or phase, so that the number of leading edges are
limited.
5.Laying decking sheets: Using the access provided, the installer should straddle the first
bundle of decking to remove the banding. The first decking sheet will then be pushed out
onto the steelwork to be used as a working platform from which to lay the remaining
sheets in that bay. Decking sheets should then be lapped together, lined up and fixed into
place once the adjacent bay has been laid and the troughs of the decking have been lined
through.
77
6.Cutting / Notching: Decking sheets are detailed to be delivered to site at the correct
square cut length. Where decking ribs sit over beams that are to receive welded shear
studs, around columns and other protrusions, notching is required. This should be carried
out by trained operatives using petrol driven disc cutters with appropriate blade or plasma
cutters.
7.Decking fixings: Fixing of the deck and edge trim to the supporting steelwork will be
carried out using low velocity powder actuated cartridge tools ('shot firing') or in certain
circumstances using self-tapping screws.
8.Side Laps: The side laps of decking sheets are stitched together using self--tapping
screws, installed with 110v screw guns, provided to side laps at maximum 1.00m centers.
9.Sealing and finishing off: Gaps up to 5mm are acceptable as they are not sufficient to
allow concrete aggregate to escape. Note: The decking is not intended to provide a
watertight finish and a degree of fines and water seepage can be expected from the panel
ends and joints.
10.Edge trims: Generally supplied in 3.00m standard lengths, each length should be fixed at
the perimeter and straps fixed at centers as indicated in Edge Trim & Flashings section with
self-tapping screws.
11.Forming holes and openings: Where trimming steels are provided, the decking sheets may
be cut to suit the size of the opening and edge trim installed. Where there is no supporting
steelwork the voids will need to be decked over. The opening should then be formed by the
concreting contractor who will box out the opening prior to pouring the concrete.
Some types of openings require no special treatment. Prior to placing of concrete the
opening is boxed out. When the slab has cured the deck is cut by others, using a nonpercussive tool.
78
We are appreciate that Ar. Sateerah Hassan assisted us to choose the site and arranged the time
for us to have a meet up with the person in charge of the site in the chosen construction site.
Furthermore, we also get to know about the profession skill of architects, project manager, and
contractor in the during the construction, not only that we also have an brief idea about the job
scope of each professionals that take part in construction project. We learnt the importance of
doing construction drawings , finding relevant data about structures in a design process, which is
a complex work to do and need long time to complete the tasks. Through this project we learnt
the process how does an design idea translated into reality. Teamwork among each members in
this group is also the key to complete this project efficiently.
Last but not least, we felt lucky to have an opportunity to visit a site which is under construction
to enhance our knowledge of building construction.