Feeder Detail: Feeder Load Current 384 Amp, Feeder Fault current Min11KA and Max 22KA.
CT Detail: CT installed on feeder is 600/1 Amp. Relay Error 7.5%, CT Error 10.0%, CT over shoot 0.05
Sec, CT interrupting Time is 0.17 Sec and Safety is 0.33 Sec.
IDMT Relay Low Current setting: Over Load Current setting is 125%, Plug setting of Relay is 0.8 Amp
and Time Delay (TMS) is 0.125 Sec, Relay Curve is selected as Normal Inverse Type.
IDMT Relay High Current setting :Plug setting of Relay is 2.5 Amp and Time Delay (TMS) is 0.100
Sec, Relay Curve is selected as Normal Inverse Type
Over Load Current (In) = Feeder Load Current X Relay setting = 384 X 125% =480 Amp
Required Over Load Relay Plug Setting= Over Load Current (In) / CT Primary Current
Pick up Setting of Over Current Relay (PMS) (I>)= CT Secondary Current X Relay Plug Setting
Pick up Setting of Over Current Relay (PMS) (I>)= 1 X 0.8 = 0.8 Amp
Plug Setting Multiplier (PSM) = Min. Feeder Fault Current / (PMS X (CT Pri. Current / CT Sec.
Current))
Operating Time of Relay for Very Inverse Curve (t) =13.5 / ((PSM)-1).
Operating Time of Relay for Extreme Inverse Curve (t) =80/ ((PSM)2 -1).
Operating Time of Relay for Long Time Inverse Curve (t) =120 / ((PSM) -1).
Operating Time of Relay for Normal Inverse Curve (t) =0.14 / ((PSM) 0.02 -1).
Operating Time of Relay for Normal Inverse Curve (t)=0.14 / ( (22.92)0.02-1) = 2.17 Amp
Actual operating Time of Relay (t>) = Operating Time of Relay X TMS =2.17 X 0.125 =0.271 Sec
Grading Time of Relay = [((2XRelay Error)+CT Error)XTMS]+ Over shoot+ CB Interrupting Time+
Safety
Operating Time of Previous upstream Relay = Actual operating Time of Relay+ Total Grading
Time Operating Time of Previous up Stream Relay = 0.271 + 0.58 = 0.85 Sec
Pick up Setting of Over Current Relay (PMS) (I>>)= CT Secondary Current X Relay Plug Setting
Pick up Setting of Over Current Relay (PMS) (I>)= 1 X 2.5 = 2.5 Amp
Plug Setting Multiplier (PSM) = Min. Feeder Fault Current / (PMS X (CT Pri. Current / CT Sec.
Current))
Operating Time of Relay for Very Inverse Curve (t) =13.5 / ((PSM)-1).
Operating Time of Relay for Extreme Inverse Curve (t) =80/ ((PSM)2 -1).
Operating Time of Relay for Long Time Inverse Curve (t) =120 / ((PSM) -1).
Operating Time of Relay for Normal Inverse Curve (t) =0.14 / ((PSM) 0.02 -1).
Operating Time of Relay for Normal Inverse Curve (t)=0.14 / ( (7.33)0.02-1) = 3.44 Amp
Actual operating Time of Relay (t>) = Operating Time of Relay X TMS =3.44 X 0.100 =0.34 Sec
Grading Time of Relay = [((2XRelay Error)+CT Error)XTMS]+ Over shoot+ CB Interrupting Time+
Safety
Operating Time of Previous upstream Relay = Actual operating Time of Relay+ Total Grading
Time.
Conclusion of Calculation:
Pickup Setting of over current Relay (PMS) (I>) should be satisfied following Two Condition.
(1) Pickup Setting of over current Relay (PMS)(I>) >= Over Load Current (In) / CT Primary Current
For Condition (1) 0.8 > =(480/600) = 0.8 >= 0.8, Which found OK
For Condition (2) 0.125 <= 11000/600 = 0.125 <= 18.33, Which found OK