You are on page 1of 7

SARAVANA SUNDARAPANDIAN B

3/114, Aathiparasakthi Nagar,


1136755766
Thiruppalai,
+60104355585
Madurai-625014.
sspengr@gmail.com

Mobile: +60Alternate No :
E-mail :
Skype Id :

saravana.bala06

RF PROFESSIONAL WITH 8.9 YEARS of EXPERIENCE


TECHNOLOGY SNAPSHOT
RF Skills
Drive Test Tools
Post processing Tools
Mapping Tools Used
Planning Tools Used
OSS Tool

:
:
:

Database Used
Platform Used
Operating System

:
:

Wireless Technology

RF Integration, Planning and Optimization.


Agilent, Nemo Outdor, TEMS and Genexprobe.
Actix, Nemo Analyzer & Genex Assistant.
:
MapInfo, Quantum.
:
Aircom-Asset (2G & 3G) & Unet(LTE).
NetNumen v3 & v4, M2000 (3 years), Netmax.
Microsoft SQL (Aircom Planning Tool)
.Net. (Nemo, Tems), Microarray (Agilent).
:
Windows XP, 7 and Linux.
:

GSM, WCDMA and LTE.

EMPLOYMENT SUMMARY
QINGNI Technology Sdn.Bhd

RNO Engineer

(September 2015 to present)

Xair Telecommunication Sdn. Bhd

OSS Engineer

(December 2014 to Septemeber2015)

Divine Spectrum Sdn Bhd.

OSS Engineer

(Oct. 2013 November 2014)

Integrated Wireless Solution

Sr.RF Engineer

(Oct. 2008 Oct. 2013)

Twice Digitale Pvt.Ltd.

CSS-Coordinator

(Nov. 2007 July 2008)

Banyan Networks

System Technician

(Sep 2003 July 2004)

EDUCATION

Master of Business Administration (Finance) (2010-2011)


Bharathiyar University, Coimbatore.
Bachelor of Engineering(Electronics and Communication Engg) (2004-2007)
Raja College of Engineering and Technology
Madurai.
Diploma in Electrical and Electronics Engineering
Latha Mathavan Polytechnic College

Madurai.

Qingni Technology Sdn.Bhd. for ZTE (WCDMA & LTE)


ZENO project in Malaysia.
Designation: RNO Engineer.
Period: From September 2015 to present.
Responsibilities: Cluster Performance Monitoring and worst cell analysis. Drive test Report preparation
and Optimization plan for coverage patches, call drop and quality patches.
Netmax KPI Analysis for 2G and 3G worst performs cells.
Monitor OSS KPI, Address the worst KPI sites and plan Optimization activities.
Weekly CR Performance Report Preparation and discussion with Project Team and
Operation Team.
GSM and WCDMA Feature implementation script preparation and execution.
New Feature implementations for system upgrade and monitor site performance.
Weekly Report Presentation with vendor (ZTE).
Achievements: 700 sites optimized in East and West Malaysia. New features implemented for CSSR,
DCR KPI Improvement.
WCDMA Throughput KPI Achieved with new feature implementation.

Xair Telecommunication Sdn.Bhd. for DIGI (GSM & WCDMA & LTE) ZTE project
in Northern Malaysia.
Designation: OSS Optimization Engineer.
Period: From December 2014 to September 2015.
Before Reforming Activities: Pre MR Collection Script Execution and MR Collection.
Concheck.
BA List Update.

Reforming Responsibilities:-

Reforming Script Preparation.


Execution Reforming Script with Slave and Master Configuration.
Babysitting for Reform Sites next 24hrs.

Optimization Responsibilities: Worst Cell Optimization (TRX Power change, Block, TRX Shift).
Handover Optimization( Handover UL & DL LEV,QUAL,AMRFR,AMRHR,POC Change,
Neighbor Addition, Deletion and Recreation, HO Priority changes,
HOMARGINPBGT,HOMARGINRXLEV,HOMARGINRXQUAL Changes).
Load Balancing (Increase HR, TRX Addition, Alarm monitoring and issue clear, TSC
Relocation, TRX Power Change, Channel Relocation).

Achievements:

Reforming script prepared for more than 1000 sites in East and West Malaysia.
Optimization script prepared and achieved KPI Target as per customer requirement.

Divine Spectrum Sdn.Bhd. for ZTE (GSM & WCDMA) ZTE project in Northern
Malaysia.
Designation: OSS Optimization Engineer.
Period: From June 2014 to November 2014.
Consistency Check for GSM and WCDMA sites.
Parameter Optimization done for worst performance sites.
GSM Refarming Script Preparation and Master-Slave Configuration.
OSS Script preparartion for Frequency retune, TRX Addition, deletion, Throughput
issues and
Handover parameters correction depends on the customer requirement.
MR Data Collection and Refarming site KPI Analysis.

Divine Spectrum Sdn.Bhd. (LTE) Huawei project in Central Malaysia.


Designation: OSS Optimization Engineer.
Period: From January 2014 to May 2014.
Site integration and/or configuration and/or support of products and networks in
accordance with a customer service contract.
Consistency Checklist with Neighbour addition in LTE-M2000.
Alarm Monitoring and Maintenance.
TAC, Route Sequence Code, PCI Planning.
Performs Acceptance Testing with customer requirement.
Drive Test Report Analyse and Report preparation for KPI Analysis.
New site coverage planning with Planning Tool Unet.
Network Performance monitoring and optimization planning and oss parameter
tunning.
Escalate the site Alarm issues to Operation and Maintenance Engineers.
Resolved RF related issues like CINR, PRS and Coverage Issues with network survey
plan and Team Co-ordination.

Achievements: 150 Sites in KL Pre launch parameter analysed and integrated for Celcom.

Divine Spectrum Sdn.Bhd. for Maxis (2G & 3G) Huawei Swap project in Central
Malaysia.
Designation: OSS Optimization Engineer.
Period: From October 2013 to November 2013.
SSV Drive Test Planning and Drive KPI Analysis.
SSOA for Single site and Cluster Drive and Cluster Optimization.
OSS KPI Monitoring for Single site and Clusters.
OSS Site Grouping and KPI Monitoring and Parameter Optimization for Worst
Performance sites.
Comparing Drive and OSS KPI with Customer target KPI Values. Escalate the site Alarm
issues to Operation and Maintenance Engineers.
Field optimization plan and oss optimization done for worst performance sites.

Integrated Wireless Solution Pvt.Ltd., (3G) for ZTE.


Designation: Sr.R.F. Engineer.
Period: From May 2013 to October 2013.

Network KPI Montior for swap sites as per customer requirement.


Template Creation and Report Fetching ZTE OMCR on Daily analysis.
LAC, RAC, Scrambling Code Planning and Site Capacity Planning.
Prediction for Coverage (WCDMA), HSDPA, PILOT POLLUTION, EC/IO with Aircom
Planning Tool.

Drive Test Report Analyse and Report preparation for KPI Analysis.
Frequency planning for 2G sites. Coverage AT Planning and coordinating the teams.
Escalate the site Alarm issues to Operation and Maintenance Engineers.
Resolved RF related issues like Pilot Pollution and Coverage Issues with network survey
plan and
Team Co-ordination.
Data Drive Parameter analyzation (Attach, Detach, HTTP, PING, TCP UDP and Data
cluster drive).
Knowledge in WCDMA KPI Parameters Analyzation.

Achievements:-

120 sites successfully swap done from Huawei BTS to ZTE BTS and Achieved KPI
Target as per customer requirement in Chennai circle.
OSS KPI and Drive Test KPI met successfully.

Teleysia Networks Pvt.Ltd. for Airtel-Huawei (3G) project in ROTN.


Designation: RF Engineer.
Period: From February 2013 to April 2013.
EMF Site report verification.
Software Updation and Data updation in server.
Team Assignment and Cluster planning for different vendors and monitor vendor
process.
Manage Validation team for Survey Report.
Weekly discussion with Operator for Survey Report Review and get approval.
EMF Survey Report Model Preparation as per the customer requirement.
Achievement: EMF Survey done for Chennai and ROTN Circles more than 12000 sites within 9
months.
EMF Survey done for four operators in Tamilnadu (Tatatelecom, Vodafone, Airtel, MTS)

Integrated Wireless Solutions Pvt.Ltd. for BSNL (2G & 3G) Huawei project in
Chennai.
Designation: OSS Engineer.
Period: From February 2011 to December 2012.
Site integration and/or configuration and/or support of products and networks in
accordance with a customer service contract.
Identify faults and troubleshoot these, according to a set of defined alternatives, and
apply standard resolving processes in the network.
Performs Acceptance Testing with customer requirement.
Develops and documents test cases for execution.
RF Script preparation for site integration, Analyze the parameter function with related
parameters.
Plan, design and optimize the network parameters depends on the customer
requirements.
Frequency planning for new sites. Coverage AT Planning and coordinating the teams.
Escalate the site Alarm issues to Operation and Maintenance Engineers.
KPI Monitoring and optimization planned for worst cells.
Resolved RF related issues like BCCH, MAIO clash with network survey plan to (BCCH,
Rx Level, Rx Quality, CID, Current channel, TA, Co-ordinates).
Data Drive Parameter analyzation (Attach, Detach, HTTP, PING, TCP UDP and Data
cluster drive).

New site planning, Neighbour Planning, Frequency planning and Prediction for new
clusters.

Integrated Wireless Solutions Pvt.Ltd. for AIRTEL (LTE) Huawei project in


Bangalore.
Period: From August 2010 to January 2011.
Drive Test Report Analyse and Report preparation for KPI Analysis.
New site coverage planning with Planning Tool Unet.
Network Performance monitoring and optimization planning and oss parameter
tunning.
Escalate the site Alarm issues to Operation and Maintenance Engineers.
Resolved RF related issues like SINR, PRS and Coverage Issues with network survey
plan and Team Co-ordination.

Integrated Wireless Solutions Pvt. Ltd. for TATA (GSM & WCDMA) - NSN
Karnataka.
Period
: May 2009 to July 2010.

project in

Single Cell Functionality Test for New site and Cluster drive done with NEMO and
AGILENT.
Post Process Logs, and Plan the Optimization for required areas to minimize network
issues.
Prepare Report depends on the customer requirement.
KPI Monitoring and Maintain the Performance of the Network with good quality.
Resolve the Customer complaints and Plan the new sites depends on the clutter
density.
Conduct Survey with Business team and recommend Booster (Repeaters) for Null
coverage areas.
Layer1 & Layer3 Research for debugging Network problems like call drop,
Handover failure and Edge related issues.
Done Cluster Testing for Docomo and Benchmarking Analysis in Major Cities of
Karnataka
Trace the Hardware issues in the 2G BTS like (TRX faulty, VSWR and Bio Card Faulty
etc.,) and convey the issues to the FM Team.
Analyze the Network Related issues like Call drop, Handover failures, and GPRS issues
and trace the reasons for these issues.
Plan the repeaters types according to the customer location.IBS Survey done for Highly
populated building for both Government and Private Sectors (Ex: IT Parks)
Planned COW Sites for Short-Time Populated Areas to avoid un-necessary Loading for
existing sites.
Issues related to HSDPA and HSUPA resolved with proper analyzation.
Achievements:

Cluster drive done and DT Optimization done for Hubli-dharwad and Belgaum clusters.
Achieved KPI Target for Hubli-Dharwad and Belgaum Clusters.
Hubli is Second highest Revenue cluster for TATA Networks in Karnataka.
Hubli got 2010 & 2011 Best Network awarded from TRAI Drive test.
Achieved best customer satisfaction in Hubli-dharwad and Belgaum locations .

Twice Digitale Pvt. Ltd CSS Co-ordinator .


Period

: November 2007 to July 2008.

System LAN Configuration and Servicing


Configure UPS with user System with SNMP Device for Remote Management.
UPS Installation and Service.6KVA- 20KVA.

Banyan Networks Pvt. Ltd Network Engineer


Period
: September 2003 to July 2004.
Direct Internet Access (DIAS) Manual and Automation Testing done for DIAS with
Loading and Simulation Test for Exchange Setup.
BDSU-DV Testing- Parameter testing, MAC Assign for Modems and Analysing Parameter
failure issues.
LL & BDSL Cards- Card Testing for BDSL Cards and Data Rate Verification for E1 Cards
and Life Line Cards.
Automation and Manual Testing for Life Line Cards and BDSU-DV
Manual Testing for Fixed Remote station.
Exchange Configuration for DIAS - BDSU-DV.
Achievements:
IAN (Internet Access Node) Test done with Exchange Setup.
LL (Life Line) Card Testing for Voice process.
Parameter Card Test done for BDSL, E1, SWITCH CARD and Control Cards.

Personnal Details:

Fathers Name

P.Balasubramanian

Contact Number :

+919600815797.

Data of Birth

Languages

06.06.1983

Tamil,

English,

German.
Blood Group
Nationality

:
:

A1+v

Indian.

Hindi,

Kannada

and

You might also like