You are on page 1of 56

Presenting Six Sigma

S.K.Singh

30.01.2006

Six Sigma Delta

What is Six Sigma?


A methodology
that uses
measurement and
statistical analysis
to improve
processes,
services, and
products
30.01.2006

Six Sigma Delta

What is Six Sigma?


A management system that unifies
culture, standardizes processes, and
raises performance standards

30.01.2006

Six Sigma Delta

What is Six-Sigma?
Strategic Interpretation
Align an organization keenly to market
place.
It is customer centric initiative.
Deliver real improvements to the bottom
line.
It is business initiative.
30.01.2006

Six Sigma Delta

Why does customer buy goods?


Customers needs are
met.
Receives the quality
and performance that
he is looking for
Receives when he
wants
Pays a price he is
happy to pay
30.01.2006

Six Sigma Delta

What is Six-Sigma?
Operational Interpretation
Move Product or Service attributes within
the zone of customer specification.
Emphasis is on reduction of defects.

Dramatically shrink process variation - the


cause of defect.
Focus is on managing processes.
30.01.2006

Six Sigma Delta

What is Six-Sigma?
Measurement Interpretation
Six Sigma is a measurement of process
capability.
What can not get measured, can not get
improved.

A Six Sigma process allows only 3.4


Defects Per Million Opportunities ( DPMO ).

30.01.2006

Six Sigma Delta

What Else is Characteristics of Six Sigma?


It is team-oriented
problem solving
approach.
It is project based
with fixed deadlines.
It relies on numbers
& facts.

30.01.2006

Six Sigma Delta

Project Selection, Allocation &


Management
L o n g T e r m S t r a t e g ic I n t e n t
S t r a t e g ic P la n
B u s in e s s G o a l 1
P r o je c t 1

P r o je c t 2

B u s in e s s G o a l 2
P r o je c t 3

P r o je c t 4

Personal Objectives

Personal Scorecard

Sponsoring Projects
1.
2.
3.
Leading Projects
1.
2.
Development Plan

Sponsoring Projects
1.
2.
3.
Leading Projects
1.
2.
Development Plan
1.

1.

Projects are drilled down from and contributing to ABP.


Projects fulfilment become personal objectives.
Scorecard is to monitor process of managing projects
9
Six Sigma Delta
30.01.2006

Few running six sigma projects in DSC


Critical-to-quality

Projects

Area

Cost reduction

Cobble reduction

Rolling Mill

Downtime reduction

Electrode regulation failure

SMS Furnace

M/c Availability
improvement

Caster strand loss reduction

SMS Caster

Material consumption
reduction

Ladle life increase

SMS refractory

Quality improvement

Yield strength improvement

Rolling mill quality

Cycle time reduction

Warehouse item traceability


improvement

Warehouse

30.01.2006

10

Six Sigma Delta

A Process is A Collection of Activities


That Takes one or More Kinds of Input
and Creates Output That is
of Value To
The Customer
A process is defined as a combination of factors or
activities that lead to the production of some result
(an output), whether that is a product or service.
Virtually everything we do is a process, from the
activities we do at our jobs to driving home at night.
Processes should
customers.

30.01.2006

ultimately provide value to

11

Six Sigma Delta

Cross-Functional Process
Mapping
Function1

Step
4

Step 5

Step 3

Function 2
Step 2

Function 3
Function 4

Step 1

Step 8

Step 6

End

Step 7

Teams can use this structure for processes that move across functions
30.01.2006

12

Six Sigma Delta

Versions of a Process
What You
Think
it is...

30.01.2006

What it
Really
is..

13

What it should
be...

What It
Could
be...

Six Sigma Delta

Deming on Process
Eighty-Five

Percent Of The Reasons For

Failure To Meet Customer Expectations


Are Related to Deficiencies In Systems
And ProcessRather than The Employee.
The Role Of Management Is
To Change the Process Rather Than
Badgering Individuals To Do Better.

Value Analysis
Value-added work

Non value-added work

Steps that are


considered essential to
produce and deliver the
product or service to
meet the customer's
needs and requirements.
Customer is willing to

Steps that are considered


non-essential to produce and
deliver the product or service
to meet the customers needs
and requirements. Customer
is not willing to pay for step

pay for step.


Steps that are not
essential, but that allow
the value-adding tasks to
be done better/faster
Value-enabling work

30.01.2006

15

Six Sigma Delta

Types of Non Value-added Work


Delay

Set-up

Control/Inspection
Internal
Failure

Moving

30.01.2006

16

Six Sigma Delta

Clues for Non-value Added work


- Rework
Reevaluate
Remake
Recheck

Redo

Reject
Return

Reissue

Re-measure

30.01.2006

Redesign

Repeat

Rework

Revise

Recall

17

Retest

Reship

Retype

Six Sigma Delta

VA / NVA Ratio
5-10
%
NVA

VA

10-20 %

90 - 80 %

VA

30.01.2006

AVG . Industries

95 - 90 %

BEST Industries

NVA

50 %

50 %

VA

NVA

WORLD CLASS Industries

18

Six Sigma Delta

Seven Deadly Waste

1.
2.
3.
4.
5.
6.
7.

Waste of Space
Waste of waiting time
Transportation waste
Re-processing waste
Inventory waste
Waste of motion
Waste from product defect

30.01.2006

19

Six Sigma Delta

Improvement as we climb the Six Sigma Ladder


Defects per Million
Opportunities

100K
10K

(66810
(66810ppm)
ppm)

10x
10xImprovement
Improvement

1K

(6210
(6210ppm)
ppm)

30x
30xImprovement
Improvement

100
10
1

30.01.2006

(233
(233ppm)
ppm)

70x
70xImprovement
Improvement

20

(3.4
(3.4ppm)
ppm)

(with +1.5 sigma shift)


Sigma

Six Sigma Delta

What Six Sigma Brings to Business?


Improvement
over previous
sigma level

Cost of
Poor
Quality
( % of
Sales)

S.No.

Level of Process
Control

Defect Per
Million

+/- 1 Sigma

6,90,000

+/- 2 Sigma

3,08,537

2.2 Times

30 - 40 %

+/- 3 Sigma

66,807

4.6 Times

20 - 30 %

+/- 4 Sigma

6,210

10.7 Times

15 - 20 %

5
6

> 40 %

+/- 5 Sigma
233
26.6 Times
Source:
Business Today, Sept. 22- Oct 6, 1999
+/- 6 Sigma
3.4
68.5 Times

10 - 15 %
< 1%

Six Sigma Scale of Defects & Impact on Cost of Quality

30.01.2006

21

Six Sigma Delta

What can Six Sigma do?


Improve performance: reduce
defects, systematize and
stabilize processes, improve
customer satisfaction
Reduce costs: improve
efficiency, eliminate waste,
reduce costs of poor quality

30.01.2006

22

Six Sigma Delta

What is ?
The Greek letter refers to standard
deviation, a measure of the variation of data
about its average.
When we measure a processs sigma value,
we measure the number of units of standard
deviations between the process center and
the closest specification limit.

30.01.2006

23

Six Sigma Delta

Every Human Activity Has Variability...


Customer
Specification

X
X
XXX
X X X XX
XXXXXXX X
XXXXXXXXXX
X X XXXXXXXXXX XXX

defects

Target

30.01.2006

Understanding Variability
& Customer Specification
Is The Essence of Six Sigma
24
Six Sigma Delta

Reducing Variability Is The Key To Six Sigma


Before

A 3 process because 3 standard deviations


fit between target and spec

Customer
Specification

Target

6.6% Defects

2
3

Customer
Specification

Target

After

30.01.2006

25

No Defects!

Six Sigma Delta

How does Six Sigma work?


The infrastructure:
Sponsors secure
organizational
support for
improvement projects
run by Black Belts
and Green Belts

30.01.2006

26

Six Sigma Delta

Six Sigma infrastructure

Black Belts

Champions

All staff

Apex
Committee
30.01.2006

27

Project
Team
Members
Green
Belts

Div. Apex
Committee
Six Sigma Delta

Six sigma organisation structure DSC


Apex Committee
Six sigma Dept.

Div. Apex
committee:
RM

Functional
GB: RM

GBs: RM

Div. Apex
committee:
Pellet Plant

Functional GB
: Pellet Plant

GBs : Pellet
Plant

Div. Apex
committee: SMS
& Foundry

Functional GB :
SMS & Foundry

Div. Apex
committee: DRI &
Lime plant
Functional GB
: DRI& Lime
plant

GBs : DRI &


Lime plant

GBs : SMS &


Foundry

28

Reporting to
MD
Div. Apex
committee: C M &
Heavy Vehicle
Functional GB :
Central
maintenance

GBs : Central
maintenance

Div. Apex
committee:
R&QA &
Admin Block
Functional
GB : R&QA &
Admin Block
GBs : R&QA
& Admin
Block

How does Six Sigma work?

The methodology: teams apply the


DMAIC (define, measure, analyze,
improve, control) methodology to root
out and eliminate the causes of defects

30.01.2006

29

Six Sigma Delta

DMAIC
Methodology

Define
Measure
Analyze
Modify
design?

Redesign
yes

no

Improve

30.01.2006

30

Control
Six Sigma Delta

30.01.2006

31

Six Sigma Delta

Define
Identify processes to be
improved
Define defects, customer
requirements, and
opportunities for
improvement
Establish project objectives, parameters, and
metrics
30.01.2006

32

Six Sigma Delta

Define phase tools


High-level, as-is business
process map
Voice of the Customer
(VOC): determine what is
critical to customer
satisfaction
Cost of quality/cost of poor
quality (COQ, COPQ)
Team charter
30.01.2006

33

Six Sigma Delta

Defining a Problem Statement


Poor Example:
Our customers are angry with us and thus delay paying their bills.
Good Example:
In the last 3 months, 12% of our customers are late, by over 45 days in
paying their bills. This represents 20% of our outstanding receivables &
negatively affects our operating cash flow.
When
What

30.01.2006

Magnitude

34

Consequence

Six Sigma Delta

Project Agreement Form

DMAIC Project
Agreement Form

30.01.2006

35

Six Sigma Delta

Measure
Collect data on performance
Map the process
Determine Critical to Quality (CTQ)
characteristics
Validate measurement system and
establish a baseline
Estimate process capability
30.01.2006

36

Six Sigma Delta

Measure phase tools


Detailed process map
Control charts
Gage reproducibility
and repeatability
(Gage R&R)
Process capability

30.01.2006

37

Six Sigma Delta

30.01.2006

38

Six Sigma Delta

30.01.2006

39

Six Sigma Delta

30.01.2006

40

Six Sigma Delta

30.01.2006

41

Six Sigma Delta

Analyze
Identify possible sources
of variation; narrow the
search for key variables
Perform hypothesis
testing and
correlation/regression
Outline areas for improvement; recommend
redesign when necessary
30.01.2006

42

Six Sigma Delta

Analyze phase tools


20
15
10
5
0

10

Correlation = 1

Regression Plot

Y = 1.02031 + 0.872922X
R-Sq = 92.0 %
9.4
9.3
9.2

Confidence intervals
Multi-vari analysis
Analysis of variance
(ANOVA)
Correlation/regression
Hypothesis testing

9.1

Ho = Null
Ha = Alternate

9.0
8.9
8.8
8.7
8.6
8.7 8.8 8.9 9.0 9.1 9.2 9.3 9.4 9.5 9.6

30.01.2006

43

Six Sigma Delta

30.01.2006

44

Six Sigma Delta

30.01.2006

45

Six Sigma Delta

30.01.2006

46

Six Sigma Delta

30.01.2006

47

Six Sigma Delta

30.01.2006

48

Six Sigma Delta

Improve
Determine effect of key
process variables on
undesirable variation
Develop and test
potential solutions to
reduce variation
Implement validated
solutions
30.01.2006

49

Six Sigma Delta

Improve phase tools

Design of experiments (DOE)


Full-factorialmeasures and analyzes the
responses of all possible combinations of
factors and factor levels
Fractional-factorialmeasures and
analyzes responses for a balanced portion
of the full-factorial array

30.01.2006

50

Six Sigma Delta

Control
Monitor the improved
process
Implement controls to hold
the gains
Establish and document new
standard operating
procedures
Transfer responsibility to
process owners
30.01.2006

51

Six Sigma Delta

Control phase tools


Statistical process
control (SPC)
Process capability
analysis

Control plans

Upper Control Limit


4

UCL=3.79
4

Center Line

U =1.930

1
LCL=0.06613

0
0

10

20

Lower Control Limit

30.01.2006

52

Six Sigma Delta

30.01.2006

53

Six Sigma Delta

30.01.2006

54

Six Sigma Delta

Mistake Proofing
To err

is human. We must never stop trying to find


ways of not making mistakes.
Mistake proofing is defined as a system for
organizing work that:
Excludes

any risk of error even by a

beginner
Allows everyone to operate without
mistakes
Prevents errors that are about to
occur
Mistake

proofing is also known as poka-yoka or


fool proofing.
55

Contact :4034 (SIX SIGMA OFF.) Admin 1.43

Any Questions ???

Thank You

30.01.2006

56

Six Sigma Delta

You might also like