Partida

Cdigo
01.01.01.01OFICINA, ALMACEN CASETA DE GUARDIANIA, COMEDOR, VESTUARIO Y SERVICIO

01470101
01470102
01470104

01.01.01.02CARTEL DE IDENTIFICACION DE OBRA

01470101
01470102
01470104

01.01.02.01AGUA PARA LA CONSTRUCCION

01.01.02.02ENERGIA ELECTRICA PROVICIONAL

01.01.03.01MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

01.01.05.01TRAZO, NIVEL Y REPLANTEO C/EQUIPO

02.01.01

EXCAVACION MANUAL A NIVEL DE SUBRASANTE PARA VEREDAS

02.01.02

EXCAVACION MANUAL PARA SARDINEL PERALTADO

02.01.03

EXCAVACION A NIVEL DE SUBRASANTE PARA PISTAS

02.01.05

CONFORMACION Y COMPACTACION DE SUBRASANTE

02.01.05

CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO LIVIANO

02.02.01

SUB BASE GRANULAR E=0.20m C/ EQUIPO (PISTAS)

02.02.02

BASE GRANULAR E=0.15M VEREDA CON PLANCHA (VEREDA)

02.02.03

BASE GRANULAR E=0.20m (PISTAS)

02.03.01

CONCRETO F'C=175KG/CM2 PARA VEREDA

01470101
01470102
01470103

02.05.01

IMPRIMACIN ASFALTICA

02.05.02

CARPETA ASFALTICA EN CALIENTE DE 2"

02.05.05

CAMA DE ARENA GRUESA DE 2"

Recurso
Unidad
CINA, ALMACEN CASETA DE GUARDIANIA, COMEDOR, VESTUARIO Y SERVICIOS HIGIENICOS
Rendimiento
10.000
MANO DE OBRA
CAPATAZ
OPERARIO
PEON
MATERIALES
BISAGRA CAPUCHINO ALUMINIO 3 1/2" x 3 1/2"
PLANCHA FIBROCEMENTO CANALON 6.5 mm 0.96 x 6.20 m
PERFIL 4 DE 2.44 x 1.10 m
CLAVO C/CABEZA P/CONSTRUCCION D. PROMEDIO
MADERA TORNILLO
TRIPLAY LUPUNA 4x8x4 mm
EQUIPOS
HERRAMIENTA MANUAL

pza
pza
pza
kg
p2
pza

%MO

RTEL DE IDENTIFICACION DE OBRA


Rendimiento

2.000

MANO DE OBRA
CAPATAZ
OPERARIO
PEON
MATERIALES
HORMIGON
MATERIAL PARA PORTICO DE CARTEL DE OBRA
CEMENTO PORTLAND TIPO I (42.5 kg)
GIGANTOGRAFIA DE ALTA RESOLUCION
AGUA

m3
glb
bol
und
m3

EQUIPOS
HERRAMIENTA MANUAL

%MO

UA PARA LA CONSTRUCCION
Rendimiento

0.270

MANO DE OBRA
PEON

hh

EQUIPOS
CAMION CISTERNA 4x2 AGUA 122HP 2000 GAL

hm

ERGIA ELECTRICA PROVICIONAL


Rendimiento

2.000

MANO DE OBRA

MATERIALES
EQUIPOS
HERRAMIENTA MANUAL

%MO

VILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS


Rendimiento

1.000

MATERIALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

glb

AZO, NIVEL Y REPLANTEO C/EQUIPO


Rendimiento

800.000

MANO DE OBRA
CAPATAZ
PEON
TOPOGRAFO

hh
hh
hh

MATERIALES
YESO EN BOLSA DE 20 kg
CORDEL ROLLO DE 50m
CLAVO C/CABEZA P/CONSTRUCCION D. PROMEDIO
MADERA TORNILLO
PINTURA ESMALTE SINTETICO

bol
pza
kg
p2
gal

EQUIPOS
TEODOLITO
JALON
MIRA TOPOGRAFICA
HERRAMIENTA MANUAL

hm
hm
hm
%MO

CAVACION MANUAL A NIVEL DE SUBRASANTE PARA VEREDAS


Rendimiento
MANO DE OBRA
CAPATAZ
PEON
EQUIPOS

4.000
hh
hh

%MO

HERRAMIENTA MANUAL

CAVACION MANUAL PARA SARDINEL PERALTADO


Rendimiento
MANO DE OBRA
CAPATAZ
PEON

4.000
hh
hh

EQUIPOS
HERRAMIENTA MANUAL

%MO

CAVACION A NIVEL DE SUBRASANTE PARA PISTAS


Rendimiento
MANO DE OBRA
CAPATAZ
OFICIAL
PEON

280.000
hh
hh
hh

EQUIPOS
HERRAMIENTA MANUAL
TRACTOR SOBRE ORUGAS 140-160 HP

%MO
hm

NFORMACION Y COMPACTACION DE SUBRASANTE


Rendimiento 1500.000
MANO DE OBRA
CAPATAZ
OFICIAL
PEON
EQUIPOS
HERRAMIENTA MANUAL
RODILLO VIBRATORIO LISO AUTOP. 101-135 HP, 1-12
MOTONIVELADORA 125 HP
CAMION CISTERNA 4x2 (AGUA) 122HP 1500gl

NFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO LIVIANO


Rendimiento
MANO DE OBRA
CAPATAZ
OFICIAL
PEON
EQUIPOS
HERRAMIENTA MANUAL
CAMION CISTERNA 4x2 (AGUA) 122HP 1500gl

hh
hh
hh

%MO
hm
hm
hm

150.000
hh
hh
hh

%MO
hm

hm

COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP

B BASE GRANULAR E=0.20m C/ EQUIPO (PISTAS)


Rendimiento
MANO DE OBRA
CAPATAZ
OFICIAL
PEON

150.000
hh
hh
hh

EQUIPOS
HERRAMIENTA MANUAL
CAMION CISTERNA 4x2 (AGUA) 122HP 1500gl
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP

%MO
hm
hm

SE GRANULAR E=0.15M VEREDA CON PLANCHA (VEREDA)


Rendimiento

60.000

MANO DE OBRA
CAPATAZ
OFICIAL
PEON

hh
hh
hh

MATERIALES
MATERIAL CLASIFICADO PARA BASE

m3

EQUIPOS
HERRAMIENTA MANUAL
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP
CAMION CISTERNA 4x2 (AGUA) 122HP 2000gl

%MO
hm
hm

SE GRANULAR E=0.20m (PISTAS)


Rendimiento

900.000

MANO DE OBRA
CAPATAZ
OFICIAL
PEON

hh
hh
hh

MATERIALES
MATERIAL CLASIFICADO PARA BASE

m3

EQUIPOS
HERRAMIENTA MANUAL
RODILLO VIBRATORIO LISO AUTOP. 101-135 HP, 1-12 TN
MOTONIVELADORA 125 HP
CAMION CISTERNA 4x2 (AGUA) 122HP 2000gl

%MO
hm
hm
hm

NCRETO F'C=175KG/CM2 PARA VEREDA


Rendimiento

100.000

MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
PEON

hh
hh
hh
hh

MATERIALES
ALAMBRE NEGRO RECOCIDO BWG N 8
CLAVO C/CABEZA P/CONSTRUCCION PROMEDIO
CONCRETO PREMEZ. C/CEMENTO T I, F'C=175 KG/CM2
MADERA PARA ENCOFRADO

kg
kg
m3
p2

EQUIPOS
HERRAMIENTA MANUAL
VIBRADOR DE CONCRETO 4 HP 2.40"

%MO
hm

PRIMACIN ASFALTICA
Rendimiento 4000.000
MANO DE OBRA
CAPATAZ
OFICIAL
PEON

hh
hh
hh

MATERIALES
KEROSENE INDUSTRIAL
ASFALTO RC-250
FLETE TERRESTRE DE ASFALTO

gal
gal
gal

EQUIPOS
HERRAMIENTA MANUAL
TRACTOR DE TIRO MF 290 34HP
CAMION IMPRIMADOR 6X2 178-210 HP 1,800 gl
BARREDORA MECANICA 10-20 HP 7 P.LONG.

%MO
hm
hm
hm

RPETA ASFALTICA EN CALIENTE DE 2"


Rendimiento 1250.000
MANO DE OBRA
CAPATAZ
OFICIAL
PEON

hh
hh
hh

MATERIALES
MEZCLADORA ASFALTICA EN CALIENTE

m3

EQUIPOS
HERRAMIENTA MANUAL
PAVIMENTADORA SOBRE ORUGA
RODILLO NEUMAT AUTO 5.5 tn 81-100HP
RODILLO TANDEM 8-12tn 94HP
TRANSPORTE MEZCLA ASFALTICA
MA DE ARENA GRUESA DE 2"

%MO
hm
hm
hm
m3
Rendimiento 1250.000

MANO DE OBRA
CAPATAZ
OFICIAL
PEON

hh
hh
hh

MATERIALES
MEZCLADORA ASFALTICA EN CALIENTE

m3

EQUIPOS
HERRAMIENTA MANUAL
PAVIMENTADORA SOBRE ORUGA
RODILLO NEUMAT AUTO 5.5 tn 81-100HP
RODILLO TANDEM 8-12tn 94HP
TRANSPORTE MEZCLA ASFALTICA

%MO
hm
hm
hm
m3

Cuadrilla

IGIENICOS
M2/da

Cantidad
Jornada

Precio
8.00

Parcial
M2
horas

Subtotal
78.08
40.16

0.1
1
2

0.0800
0.8000
1.6000

23.08
19.23
14.33

1.85
15.38
22.93
35.91

0.2000
0.0170
0.4500
0.0100
1.1050
0.3650

6.36
153.5
38.06
2.30
5.70
23.50

1.27
2.61
17.13
0.02
6.30
8.58
2.01

5.0000

PZA/da

Jornada

40.16

8.00

2.01
PZA
horas

1636.37
200.79

0.1
1
2

0.4000
4.0000
8.0000

23.08
19.23
14.33

9.23
76.92
114.64
1425.54

0.2500
1.0000
1.0000
1.0000
0.0820

32.70
600.00
16.89
800.00
5.68

8.18
600.00
16.89
800.00
0.47

0.0500

200.79

10.04

10.04

MES/da

Jornada

8.00

MES
horas

1767.83
169.84

0.4

11.8519

14.33

169.84
1597.99

0.4

11.8519

134.83

1597.99

GLB/da

Jornada

8.00

GLB
horas

#REF!
0.00

0.0000
0.0000
0.0000

23.08
19.23
14.33

0.00
0.00
0.00
#REF!
0.00

0.0500

glb/da

Jornada

0.00

8.00

0.00
glb
horas

10000.00
10000.00

1.0000

m2/da

Jornada

10000.00

8.00

10000.00
m2
horas

1.50
0.65

0.1
3
1

0.0010
0.0300
0.0100

23.08
14.33
19.96

0.02
0.43
0.20
0.66

0.0250
0.0001
0.0050
0.0264
0.0020

17.41
13.56
2.3
5.70
29.66

0.44
0.00
0.01
0.15
0.06
0.19

1
2
1

m3/da

0.0100
0.0200
0.0100
0.0300

Jornada

11.64
1.51
1.75
0.65

8.00

0.12
0.03
0.02
0.02
m3
horas

34.94
33.28

0.1
1

0.2000
2.0000

23.08
14.33

4.62
28.66
1.66

0.0500

m3/da

Jornada

33.28

8.00

1.66
m3
horas

34.94
33.28

0.1
1

0.2000
2.0000

23.08
14.33

4.62
28.66
1.66

0.0500

m3/da

Jornada

33.28

8.00

1.66
m3
horas

8.78
1.35

0.1
1
2

0.0029
0.0286
0.0571

23.08
15.94
14.33

0.07
0.46
0.82

0.0300
0.0286

1.35
258.50

0.04
7.39

7.43

m2/da

Jornada

8.00

m2
horas

2.78
0.51

1
1
4

0.0053
0.0053
0.0213

23.08
15.94
14.33

0.12
0.08
0.31
2.27

1
1
1

m2/da

0.0300
0.0053
0.0053
0.0053

Jornada

0.51
149.60
160.58
115.79

8.00

0.02
0.79
0.85
0.61
m2
horas

7.47
5.14

1
1
4

0.0533
0.0533
0.2133

23.08
15.94
14.33

1.23
0.85
3.06
2.33

0.1

0.0300
0.0053

5.14
115.79

0.15
0.61

m2/da

0.0533

Jornada

29.45

8.00

1.57
m2
horas

7.47
5.14

1
1
4

0.0533
0.0533
0.2133

23.08
15.94
14.33

1.23
0.85
3.06
2.33

0.1
1

m2/da

0.0300
0.0053
0.0533

Jornada

5.14
115.79
29.45

8.00

0.15
0.61
1.57
m2
horas

29.30
12.84

1
1
4

0.1333
0.1333
0.5333

23.08
15.94
14.33

3.08
2.12
7.64

1.1760
16.46
0.1
1

m2/da

0.0500
0.0133
0.1333

Jornada

12.84
29.45
115.79

8.00

0.64
0.39
15.43
m2
horas

3.65
0.86

1
1
4

0.0089
0.0089
0.0356

23.08
15.94
14.33

0.21
0.14
0.51

0.86
149.60
160.58
115.79

0.03
1.33
1.43

0.2600
2.79
1
1
1

0.0300
0.0089
0.0089
0.0089

m2/da

Jornada

8.00

m2
horas

41.54
15.38

1
2
1
8

0.0800
0.1600
0.0800
0.6400

23.08
19.23
15.94
14.33

1.85
3.08
1.28
9.17
24.97

0.0200
0.0200
0.1050
0.1400

2.13
2.30
229.0
5.95

0.04
0.05
24.05
0.83
1.19

m2/da

0.0500
0.0800

Jornada

15.38
5.30

8.00

0.77
0.42
m2
horas

1.86 0301010006
03012900010005

0.17 0301400006
1
2
2

0.0020
0.0040
0.0040

23.08
15.94
14.33

0.05
0.06
0.06
1.31

0.0800
0.3200
0.3200

4.08

0.0500
0.0020
0.0020
0.0020

0.17
70.27
112.90
46.56

0.00
1.31
0.00
0.38

1
1
1

m2/da

Jornada

8.00

0.01
0.14
0.23

m2
horas

1.88
1.35

3.125
2.813
6.563

0.0200
0.0180
0.0420

23.08
15.94
14.33

0.46
0.29
0.60
0.00

0.0650

0.00

0.53
1.25
1.25
1.25
0.065
m2/da

0.0500
0.0025
0.0025
0.0025

Jornada

1.35
70.27
112.90
46.56

8.00

0.07
0.18
0.28

m2
horas

1.88
1.35

3.125
2.813
6.563

0.0200
0.0180
0.0420

23.08
15.94
14.33

0.46
0.29
0.60
0.00

0.0650

0.00
0.53

1.25
1.25
1.25
0.065

0.0500
0.0025
0.0025
0.0025

1.35
70.27
112.90
46.56

0.07
0.18
0.28

Equipos
HERRAMIENTAS MANUALES

%mo

VIBRADOR DE CONCRETO 4 HP 2.40"

hm

SERVICIO DE BOMBA

m3

5.0000
1.0000

0.0800
0.1000

13.97

0.70

5.82

0.47

39.00

3.90

CODIGO
01470101
01470102
01470103
01470104
01470105

Recurso
MANO DE OBRA
CAPATAZ
OFICIAL
OPERARIO
PEON
TOPOGRAFO
MATERIALES

02390001
02
02
02010001
02020001
02020002
02130001
02210001
02320001
02380001
02380002
02430001
02430002
02800001

AGUA
CORDEL ROLLO DE 50m
GIGANTOGRAFIA DE ALTA RESOLUCION
KEROSENE INDUSTRIAL
ALAMBRE NEGRO RECOCIDO BWG N 8
CLAVO C/CABEZA P/CONSTRUCCION D. PROMEDIO
ASFALTO RC-250
CEMENTO PORTLAND TIPO I (42.5 kg)
FLETE TERRESTRE DE ASFALTO
HORMIGON
MATERIAL CLASIFICADO PARA BASE
MADERA PARA ENCOFRADO
MADERA TORNILLO
CONCRETO PREMEZ. C/CEMENTO T I, F'C=175 KG/CM2
MATERIAL PARA PORTICO DE CARTEL DE OBRA
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
PERFIL 4 DE 2.44 x 1.10 m
PINTURA ESMALTE SINTETICO
PLANCHA FIBROCEMENTO CANALON 6.5 mm 0.96 x 6.20 m
TRANSPORTE MEZCLA ASFALTICA
TRIPLAY LUPUNA 4x8x4 mm
YESO EN BOLSA DE 20 kg
BARREDORA MECANICA 10-20 HP 7 P.LONG.
BISAGRA CAPUCHINO ALUMINIO 3 1/2" x 3 1/2"
CAMION CISTERNA 4x2 (AGUA) 122HP 1500gl
CAMION CISTERNA 4x2 (AGUA) 122HP 2000gl
CAMION IMPRIMADOR 6X2 178-210 HP 1,800 gl
COMPACTADORA VIBRATORIA TIPO PLANCHA 7 HP
MEZCLADORA ASFALTICA EN CALIENTE
MIRA TOPOGRAFICA
MOTONIVELADORA 125 HP
PAVIMENTADORA SOBRE ORUGA
RODILLO NEUMAT AUTO 5.5 tn 81-100HP
RODILLO TANDEM 8-12tn 94HP

RODILLO VIBRATORIO LISO AUTOP. 101-135 HP, 1-12


TEODOLITO
TRACTOR DE TIRO MF 290 34HP
TRACTOR SOBRE ORUGAS 140-160 HP
VIBRADOR DE CONCRETO 4 HP 2.40"
JALON

Unidad
hh
hh
hh
hh
hh
m3
pza
und
gal
kg
kg
gal
bol
gal
m3
m3
p2
p2
m3
glb
glb
pza
gal
pza
m3
pza
bol
hm
pza
hm
hm
hm
hm
m3
hm
hm
hm
hm
hm

Precio
23.08
15.94
19.23
14.33
19.96
5.68
13.56
800.00
2.13
2.30
4.08
16.89
32.70
30.00
5.95
5.70
229.0
600.00
10000.00
38.06
29.66
153.5
23.50
17.41
46.56
6.36
115.79
115.79
112.90
29.45
1.75
160.58
70.27
112.90
46.56

hm
hm
hm
hm
hm
hm

149.60
11.64
70.27
258.50
5.30
1.51