You are on page 1of 4

YIELD ASSESSMENT OF THE PHOTOVOLTAIC POWER PLANT

Report number: PV-26705-1607-5


Issued: 07 July 2016 04:09 (UTC)

1. Site info

2. PV system info

Site name:

Myunda Maylalwani, India

Coordinates:
Elevation a.s.l.:
Slope inclination:
Slope azimuth:

30 22' 48.57" N, 78 33' 26.86" E


953 m
30
256 west

Annual global in-plane irradiation: 1965 kWh/m2


Annual air temperature at 2 m: 18.9 C

Installed power:
Type of modules:
Mounting system:
Azimuth/inclination:
Inverter Euro eff.:
DC / AC losses:
Availability:

1000.0 kWp
crystalline silicon (c-Si)
fixed mounting, free standing
180 (south) / 30
97.5%
5.5% / 1.5%
99.0%

Annual average electricity production:


Average performance ratio: 73.0%

1529.9 MWh

Location on the map: http://solargis.info/imaps/#tl=Google:satellite&loc=30.3801596539,78.5574603081&z=17

3. Geographic position

Google Maps 2016 Google

4. Terrain horizon and day length

Left:

Path of the Sun over a year. Terrain horizon (drawn by grey filling) and module horizon (blue filling) may have
shading effect on solar radiation. Black dots show True Solar Time. Blue labels show Local Clock Time.

Right:

Change of the day length and solar zenith angle during a year. The local day length (time when the Sun is above the
horizon) is shorter compared to the astronomical day length, if obstructed by higher terrain horizon.

2016 Solargis

page 1 of 4

Site: Myunda Maylalwani, India, lat/lon: 30.3802/78.5575


PV system: 1000.0 kWp, crystalline silicon, fixed free, azim. 180 (south), inclination 30

5. Global horizontal irradiation and air temperature - climate reference


Month
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Year

Ghm

Ghd

Dhd

T24

103
115
168
185
199
170
144
143
144
155
118
103
1747

3.32
4.10
5.42
6.16
6.43
5.67
4.64
4.61
4.79
5.00
3.92
3.33
4.78

1.20
1.53
2.09
2.67
3.00
3.09
2.90
2.66
2.14
1.62
1.22
1.01
2.10

10.1
11.6
16.1
21.5
25.6
26.7
24.5
23.0
21.6
18.7
15.1
12.0
18.9

Long-term monthly averages:


Ghm
Ghd
Dhd
T24

Monthly sum of global irradiation [kWh/m2]


Daily sum of global irradiation [kWh/m2]
Daily sum of diffuse irradiation [kWh/m2]
Daily (diurnal) air temperature [C]

6. Global in-plane irradiation


Fixed surface, azimuth 180 (south), inclination. 30

Month
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Year

Gim

Gid

Did

Rid

Shloss

147
148
193
190
188
155
132
140
156
195
165
156
1965

4.75
5.29
6.23
6.33
6.08
5.16
4.27
4.50
5.20
6.28
5.51
5.04
5.39

1.40
1.72
2.24
2.67
2.84
2.84
2.66
2.54
2.20
1.85
1.45
1.24
2.14

0.03
0.04
0.05
0.05
0.06
0.05
0.04
0.04
0.04
0.04
0.04
0.03
0.04

9.0
7.6
5.1
4.1
3.9
4.8
5.8
5.3
5.2
5.8
8.8
9.6
6.2

Long-term monthly averages:


Gim
Gid
Did
Rid

Monthly sum of global irradiation [kWh/m2]


Daily sum of global irradiation [kWh/m2]
Daily sum of diffuse irradiation [kWh/m2]
Daily sum of reflected irradiation [kWh/m2]

Shloss

Losses of global irradiation by terrain shading [%]

Average yearly sum of global irradiation for different types of surface:

Horizontal
Optimally inclined (29)
2-axis tracking
Your option

2016 Solargis

kWh/m2
1746
1966
2296
1966

Report number: PV-26705-1607-5

relative to optimally inclined


88.8%
100.0%
116.8%
100.0%

Issued: 07 July 2016 04:09 (UTC)

page 2 of 4

Site: Myunda Maylalwani, India, lat/lon: 30.3802/78.5575


PV system: 1000.0 kWp, crystalline silicon, fixed free, azim. 180 (south), inclination 30

7. PV electricity production in the start-up

Month
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Year

Esm

Esd

Etm

Eshare

PR

120
119
152
145
141
116
101
107
120
151
131
126
1530

3.88
4.25
4.89
4.84
4.56
3.86
3.25
3.46
4.00
4.88
4.37
4.08
4.19

120.2
119.1
151.5
145.1
141.3
115.9
100.8
107.2
120.0
151.2
131.2
126.4
1529.9

7.9
7.8
9.9
9.5
9.2
7.6
6.6
7.0
7.8
9.9
8.6
8.3
100.0

74.3
74.3
74.4
73.2
72.1
71.3
71.7
72.7
72.9
73.1
72.4
73.2
73.0

Long-term monthly averages:


Esm
Esd
Etm

Monthly sum of specific electricity prod. [kWh/kWp]


Daily sum of specific electricity prod. [kWh/kWp]
Monthly sum of total electricity prod. [MWh]

Eshare
PR

Percentual share of monthly electricity prod. [%]


Performance ratio [%]

8. System losses and performance ratio

Energy conversion step

Energy output

Energy loss

Energy loss

[kWh/kWp]

[kWh/kWp]

[%]

[partial %]

Performance ratio
[cumul. %]

1. Global in-plane irradiation (input)

2096

100.0

100.0

2. Global irradiation reduced by terrain shading

1966

-130

-6.2

93.8

93.8

3. Global irradiation reduced by reflectivity

1919

-47

-2.4

97.6

91.5

4. Conversion to DC in the modules

1703

-216

-11.2

88.8

81.3

5. Other DC losses

1609

-94

-5.5

94.5

76.8

6. Inverters (DC/AC conversion)

1569

-40

-2.5

97.5

74.9

7. Transformer and AC cabling losses

1546

-24

-1.5

98.5

73.7

8. Reduced availability

1530

-16

-1.0

99.0

73.0

1530

-566

-27.0

73.0

Total system performance

Energy conversion steps and losses:


1. Initial production at Standard Test Conditions (STC) is assumed,
2. Reduction of global in-plane irradiation due to obstruction of terrain horizon and PV modules,
3. Proportion of global irradiation that is reflected by surface of PV modules (typically glass),
4. Losses in PV modules due to conversion of solar radiation to DC electricity; deviation of module efficiency from STC,
5. DC losses: this step assumes integrated effect of mismatch between PV modules, heat losses in interconnections and cables, losses
due to dirt, snow, icing and soiling, and self-shading of PV modules,
6. This step considers euro efficiency to approximate average losses in the inverter,
7. Losses in AC section and transformer (where applicable) depend on the system architecture,
8. Availability parameter assumes losses due to downtime caused by maintenance or failures.
Losses at steps 2 to 4 are numerically modeled by pvPlanner. Losses at steps 5 to 8 are to be assessed by auser. The simulation
models have inherent uncertainties that are not discussed in this report. Read more about simulation methods and related uncertainties
to evaluate possible risks at http://solargis.info/doc/pvplanner/.

2016 Solargis

Report number: PV-26705-1607-5

Issued: 07 July 2016 04:09 (UTC)

page 3 of 4

Site: Myunda Maylalwani, India, lat/lon: 30.3802/78.5575


PV system: 1000.0 kWp, crystalline silicon, fixed free, azim. 180 (south), inclination 30

9. Solargis - description of the database


Solargis is high-resolution climate database operated by Solargis s.r.o. Primary data layers include solar radiation, air temperature and
terrain (elevation, horizon).
Air temperature at 2 m: developed from the CFSR data ( NOAA NCEP, USA); years: 1994 - 2011; recalculated to 15-minute values.
The data are spatially enhanced to 1 km resolution to reflect variability induced by high resolution terrain.
Solar radiation: calculated from the satellite and atmospheric data:
- Meteosat PRIME satellite ( EUMETSAT, Germany) 1994 - 2010, 15-minute or 30-minute values for Europe, Africa and Middle East,
- Meteosat IODC satellite ( EUMETSAT, Germany) 1999 - 2011, 30-minute values for Asia,
- GOES EAST satellite ( NOAA, USA) 1999 - 2014, 30-minute, partially 3-hourly values for Americas,
- MTSAT satellite ( JMA, Japan) 2007 - 2014, 30-minute values for Pacific,
- MACC-II ( ECMWF, UK) 2003 - 2014, atmospheric data,
- GFS, CFSR ( NOAA, USA), 1994 - 2014, atmospheric data.
This estimation assumes year having 365 days. Occasional deviations in calculations may occur as a result of mathematical rounding
and cannot be considered as a defect of algorithms. More information about the applied data, algorithms and uncertainty can be found
at: http://solargis.info/doc/pvplanner/.

10. Service provider


Solargis s.r.o. , Milana Mareka 3, 84108 Bratislava, Slovakia; Registration ID: 45 354 766, VAT Number: SK2022962766; Registration:
Business register, District Court Bratislava I, Section Sro, File 62765/B

11. Mode of use


This report shows solar power estimation in the start-up phase of a PV system. The estimates are accurate enough for small and
medium-size PV systems. For suntracking simulations, only theoretical options are shown without considering backtracking and shading.
For large projects planning and financing, more information is needed:
1. Statistical distribution and uncertainty of solar radiation
2. Detailed specification of a PV system
3. Interannual variability and P90 uncertainty of PV production
4. Lifetime energy production considering performance degradation of PV components.
More information about full PV yield assessment can be found at: http://solargis.info/doc/8.

12. Disclaimer and legal information


Considering the nature of climate fluctuations, interannual and long-term changes, as well as the uncertainty of measurements and
calculations, Solargis s.r.o. cannot take full guarantee of the accuracy of estimates. The maximum possible has been done for the
assessment of climate conditions based on the best available data, software and knowledge. Solargis s.r.o. shall not be liable for any
direct, incidental, consequential, indirect or punitive damages arising or alleged to have arisen out of use of the provided report.
This report is copyright to 2016 Solargis s.r.o., all rights reserved.
Solargis is a trade mark of Solargis s.r.o.

13. Contact information


This report has been generated for Rhin Solar, A-75/4, Wazirpur Industrial, 110052, New delhi, India.
This document is electronically signed by Solargis s.r.o.. The authenticity of this report can be verified here: http://solargis.info/doc/120

2016 Solargis

Report number: PV-26705-1607-5

Issued: 07 July 2016 04:09 (UTC)

page 4 of 4

You might also like