Professional Documents
Culture Documents
Exhibit J
Supplemental Agreement
Huawei
D EPARTMENT
TSD P RE -O PERATIONS
AUTHOR
D AVE ALLEN
O WNER
S AM DELES
D OCUMENT REFERENCE
GVE-J-KPI
D OCUMENT RELEASE HISTORY
VERSIO
R ELEASE DATE
PURPOSE
N
1.0
15 J ULY 2015
TABLE OF CONTENTS
1.
INTRODUCTION........................................................................................................... 4
2.
METHODOLOGY.......................................................................................................... 5
2.1
GENERAL PROCESS......................................................................................................... 5
2.1.1 Drive Test Configuration............................................................................................ 6
2.1.2 Drive Test Procedures............................................................................................... 6
2.1.3 Drive Test Normalisation............................................................................................ 6
2.1.4 Drive Test Routes...................................................................................................... 6
2.1.5 Drive Test Protocol.................................................................................................... 6
2.1.6 Acceptance reports.................................................................................................... 6
3.
3.5
CLUSTER OPTIMISATION................................................................................................... 7
4.
IBS OPTIMISATION...................................................................................................... 7
5.
5.1
5.2
5.3
5.4
2G KPI TARGETS............................................................................................................ 7
3G KPI TARGETS............................................................................................................ 8
4G KPI TARGETS............................................................................................................ 9
KPI FORMULAS TO BE USED.............................................................................................9
TSD
July 2015
Project Turbo
Networks Philippines
Page 3
Smart Communications Confidential Restricted
1.
Introduction
Aim of this supplemental agreement is to define project-specific adjustments to Exhibit J,
especially valid for Huawei scope of work area as part of the Network Cluster
Optimisation Program.
All changes and additions to Exhibit J are documented in this supplemental agreement.
The supplemental agreement supersedes Exhibit J in all aspects mentioned in the
supplemental agreement. For all aspects not mentioned in the supplemental agreement,
Exhibit J is still valid.
The chapter numbering in this document is according to Exhibit J.
TSD
July 2015
Project Turbo
Networks Philippines
Page 4
Smart Communications Confidential Restricted
2.
Methodology
2.1
General Process
General Process for Network Cluster Optimisation & Verification Program is based upon a
4 + 1 week approach per cluster. The process flow as well as the specific activities and
milestones are as follows:
TSD
July 2015
Project Turbo
Networks Philippines
Page 5
Smart Communications Confidential Restricted
TSD
July 2015
Project Turbo
Networks Philippines
Page 3
Smart Communications Confidential Restricted
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
TSD
July 2015
Project Turbo
Networks Philippines
Page 3
Smart Communications Confidential Restricted
With collocated (In DT car) Mobile B for Mob2Mob calls. The above mentioned setup will
be used for Cluster Optimisation Verification purposes. The vendor is highly
recommended to follow this DT setup.
2.1.6
Acceptance reports
The Post Drive Test Reports must include:
- All relevant KPIs, given in chapter 5
- ACTIVE: All as vis--vis plots (Pre / Post) (not competitor)
- PASSIVE: All in table form (Pre / Post / Target)
3.
Cluster Optimisation
Near site stationary throughput tests are not part of the Network Cluster Optimisation
Program.
TSD
July 2015
Project Turbo
Networks Philippines
Page 4
Smart Communications Confidential Restricted
4.
IBS Optimisation
Not to be considered during Network Cluster Optimisation Verification.
5.
TSD
July 2015
Project Turbo
Networks Philippines
Page 5
Smart Communications Confidential Restricted
5.1
2G KPI Targets
The following table outline the critical/used criteria KPI for the verification of the Cluster
Optimisation in 2G:
5.2
3G KPI Targets
The following table outline the critical/used criteria KPI for the verification of the Cluster
Optimisation in 3G:
5.3
4G KPI Targets
The following table outline the critical/used criteria KPI for the verification of the Cluster
Optimisation in 4G:
5.4
TSD
July 2015
Project Turbo
Networks Philippines
Page 6
Smart Communications Confidential Restricted
5.4.1
2G KPI Formulas
TSD
July 2015
Project Turbo
Networks Philippines
Page 7
Smart Communications Confidential Restricted
5.4.2
3G KPI Formulas
TSD
July 2015
Project Turbo
Networks Philippines
Page 8
Smart Communications Confidential Restricted
5.4.3
4G KPI Formulas
TSD
July 2015
Project Turbo
Networks Philippines
Page 9
Smart Communications Confidential Restricted