You are on page 1of 12

Project Turbo

Exhibit J
Supplemental Agreement
Huawei

D EPARTMENT
TSD P RE -O PERATIONS
AUTHOR
D AVE ALLEN
O WNER
S AM DELES
D OCUMENT REFERENCE
GVE-J-KPI
D OCUMENT RELEASE HISTORY
VERSIO
R ELEASE DATE
PURPOSE
N

1.0

15 J ULY 2015

1ST D RAFT BY DETECON

Exhibit J Supplemental Agreement

TABLE OF CONTENTS
1.

INTRODUCTION........................................................................................................... 4

2.

METHODOLOGY.......................................................................................................... 5

2.1
GENERAL PROCESS......................................................................................................... 5
2.1.1 Drive Test Configuration............................................................................................ 6
2.1.2 Drive Test Procedures............................................................................................... 6
2.1.3 Drive Test Normalisation............................................................................................ 6
2.1.4 Drive Test Routes...................................................................................................... 6
2.1.5 Drive Test Protocol.................................................................................................... 6
2.1.6 Acceptance reports.................................................................................................... 6
3.

MACRO SITE OPTIMISATION......................................................................................7

3.5

CLUSTER OPTIMISATION................................................................................................... 7

4.

IBS OPTIMISATION...................................................................................................... 7

5.

KPI ACCEPTANCE CRITERIA.....................................................................................7

5.1
5.2
5.3
5.4

2G KPI TARGETS............................................................................................................ 7
3G KPI TARGETS............................................................................................................ 8
4G KPI TARGETS............................................................................................................ 9
KPI FORMULAS TO BE USED.............................................................................................9

TSD
July 2015

Project Turbo
Networks Philippines
Page 3
Smart Communications Confidential Restricted

Exhibit J Supplemental Agreement

1.

Introduction
Aim of this supplemental agreement is to define project-specific adjustments to Exhibit J,
especially valid for Huawei scope of work area as part of the Network Cluster
Optimisation Program.
All changes and additions to Exhibit J are documented in this supplemental agreement.
The supplemental agreement supersedes Exhibit J in all aspects mentioned in the
supplemental agreement. For all aspects not mentioned in the supplemental agreement,
Exhibit J is still valid.
The chapter numbering in this document is according to Exhibit J.

TSD
July 2015

Project Turbo
Networks Philippines
Page 4
Smart Communications Confidential Restricted

Exhibit J Supplemental Agreement

2.

Methodology

2.1

General Process
General Process for Network Cluster Optimisation & Verification Program is based upon a
4 + 1 week approach per cluster. The process flow as well as the specific activities and
milestones are as follows:

TSD
July 2015

Project Turbo
Networks Philippines
Page 5
Smart Communications Confidential Restricted

TSD
July 2015

Project Turbo
Networks Philippines
Page 3
Smart Communications Confidential Restricted

2.1.1

Drive Test Configuration


Instead of The mobile phones/CPE used must be latest generations capable of 2G/3G
and LTE requirement is defined as: The mobile phones/CPE used must be capable to
support all required measurements in 2G/3G and 4G.

2.1.2

Drive Test Procedures


"IDLE Mode Drive Test shall NOT be part of the Network Cluster Optimisation Activity.
Stationary Throughput Tests shall NOT be part of the Network Cluster Optimisation
Program.
The drive testing shall be carried out during Monday to Friday (8:30AM-4:30PM), usually.
Pre- & Post optimization DT should be done within a similar time frame, i.e. similar day of
the week and similar time of the day.

2.1.3

Drive Test Normalisation


The Drive Test Normalisation shall be done in a spatial way only. Depending on the
average drive test speed of a cluster, the used spatial resolution distance can vary from 5
(CBD) to 15 (rural area) meters.
The Aggregation rules for the raw measurements shall be reasonable (averaging, most
common, ...).

2.1.4

Drive Test Routes


Stationary throughput test locations need NOT to be submitted.
The vendor has to propose DT routes to Smart before starting with DT. Smart will then
review and adopt the routes, if needed. The vendor shall use the approved routes only.
During post-processing of DT results only the measurement sample should be taken into
account which are located on the approved DT route.

2.1.5

Drive Test Protocol


Neither competitor nor stationary measurements required.
Recommended configuration and measurement description as follows:

TSD
July 2015

Project Turbo
Networks Philippines
Page 3
Smart Communications Confidential Restricted

With collocated (In DT car) Mobile B for Mob2Mob calls. The above mentioned setup will
be used for Cluster Optimisation Verification purposes. The vendor is highly
recommended to follow this DT setup.
2.1.6

Acceptance reports
The Post Drive Test Reports must include:
- All relevant KPIs, given in chapter 5
- ACTIVE: All as vis--vis plots (Pre / Post) (not competitor)
- PASSIVE: All in table form (Pre / Post / Target)

3.

Macro Site Optimisation

Cluster Optimisation
Near site stationary throughput tests are not part of the Network Cluster Optimisation
Program.

TSD
July 2015

Project Turbo
Networks Philippines
Page 4
Smart Communications Confidential Restricted

The approval to proceed with the Cluster Optimisation is given as follows:

(Remark: IBS are excluded in calculation)

4.

IBS Optimisation
Not to be considered during Network Cluster Optimisation Verification.

5.

KPI Acceptance Criteria


The herewith mentioned set of KPI is a subset from the existing set of defined KPI from
Exhibit J. This subset is defined and used as critical KPI for Cluster Optimisation
Verification.
The KPIs are outlined per technology so that there is no ambiguity and the following
conditions are to be met with respect to achieving the respective KPI values:
No criteria on cell level used
For clusters, OSS KPIs are to be computed based on weighted average (overall
sum of all events in one specific cluster)

OSS KPIs follow a weekly aggregation (7 consecutive days)


Xxx (Embedded Excel-File)

TSD
July 2015

Project Turbo
Networks Philippines
Page 5
Smart Communications Confidential Restricted

5.1

2G KPI Targets
The following table outline the critical/used criteria KPI for the verification of the Cluster
Optimisation in 2G:

5.2

3G KPI Targets
The following table outline the critical/used criteria KPI for the verification of the Cluster
Optimisation in 3G:

5.3

4G KPI Targets
The following table outline the critical/used criteria KPI for the verification of the Cluster
Optimisation in 4G:

5.4

KPI formulas to be used


The following table outline the critical/used criteria KPI for the verification of the Cluster
Optimisation in 4G:

TSD
July 2015

Project Turbo
Networks Philippines
Page 6
Smart Communications Confidential Restricted

5.4.1

2G KPI Formulas

TSD
July 2015

Project Turbo
Networks Philippines
Page 7
Smart Communications Confidential Restricted

5.4.2

3G KPI Formulas

TSD
July 2015

Project Turbo
Networks Philippines
Page 8
Smart Communications Confidential Restricted

5.4.3

4G KPI Formulas

TSD
July 2015

Project Turbo
Networks Philippines
Page 9
Smart Communications Confidential Restricted

You might also like