: HAYDARIA
Report No. : 23
Date
: Mon 08/02/2012
Man power
Sub Contractor
Admin.
2
Engineer
7
Surveyor
1
Admin.
Engineer
Surveyor
FBC
MO
Eng.
in
power
charge
Max:19 Min:7
Pr
en
t
Man
Eq
ui
pm
Section
No.
Civil works
Mobilization
1
2
3
4
8
supplying sub base for storage area ( today have supplied 95 cubic meters)
spreading and leveling sub base for storage area .
wetting & compacting for storage area .
continue civil work for building toilets and in camp area .
continue caravans installation , install structure basement on camp foundation
Eng.Wissam
Eng.Ali Omran
surveyor Karar
shovel
water tank
compactor
Excavator
50
50
47
8
4
soil investigation
still waiting for receiving the comments from Dr.Saffa
about soil investigation report .
1
2
3
95
9
30
directorate to check Then samples from 11KV line materials will be taken next Sunday for test in Baghdad.
receiving materials
arrange container to be point guard in the site .
admin. Hamza
documents
Eng.Ali Hanoon
civil works
continue supplying sub base for storage area.
spreading and leveling sub base for storage area .
wetting and compacting sub base for storage area .
continue building works for toilets foundation (wooden frame work ).
continue caravans installation works in site.
1
2
electrical works
waiting for receiving remaining materials of 11KV feeding line from contractor( underground cable)
continue civil works for installing 11KV line from tire plant to site area by contractor
Foreman
0
technician
1
worker
1
Total
12
Foreman
1
1
technician
5
1
worker
4
4
Total
10
6
16
Max:19 Min:7
en
t
Progress
Plan
Actual
start
finish
start
1/23/2012
1/25/2012
12/28/2011
1/28/2012
2/7/2012
2/4/2012
2/6/2012
1/20/2012
2/12/2012
3/29/2012
1/23/2012
1/25/2012
12/28/2012
2/4/2012
2/7/2012
12/9/2011
2/15/2012
12/9/2011
1/3/2012
1/26/2012
1/25/2012
2/18/2012
1/4/2012
2/4/2012
1/23/2012
1/30/2012
2/7/2012
finish