Professional Documents
Culture Documents
Faculty of Engineering
CHAPTER TWO
PILE FOUNDATION
1. Design a pile foundation for the following soil profile and column load at foundation level.
+ 0 .0 m
F ill
C =0, =30
= 1 7 .0 K N /m
- 2 .0 m
M =200K N m
y
S tif f c la y
- 1 0 .0 m
q =150K Pa,
u
3
= 1 7 .0 K N /m
S tif f c la y
D ense S and
=30
- 3 0 .0 m
= 1 9 .0 K N /m
600m m
- 2 0 .0 m
Use
Concrete C-30
Steel S-300
q =300K Pa,
u
3
= 1 9 .0 K N /m
M =300K N m
x
P=2000K N
400m m
B a s a lt
= 1 0 ,0 0 0 K P a
u lt
F ig u r e a : S o il D a t a
F ig u r e b : L o a d D a t a
Solution: The following assumptions are made for the soil data to compute individual pile
capacity
P
+ 0 .0 m
A ssum e
F ill
/ 3
3
= 1 7 .0 K N /m K s = 1 .0
C =0, =30
- 2 .0 m
S tif f c la y
A ssum e
S tif f c la y
A ssum e
q =300K Pa,
u
3
= 1 9 .0 K N /m
- 2 0 .0 m
D ense S and
=30
= 1 9 .0 K N /m
- 3 0 .0 m
1
2
h k s tan
1
2
* 17 * 2 * 1 * tan( 2 * 30 / 3 ) 6 . 19 Kpa
q = 1 5 0 K P a ,
u
3
= 1 7 .0 K N /m
- 1 0 .0 m
bu
qu
2
qu
2
0 . 45 *
0 . 45 *
150
2
300
2
33 . 75 Kpa
67 . 5 Kpa
B a s a lt
u lt
= 1 0 ,0 0 0 K P a
2(Kpa)= 33.75
L2(m)= 8
3(Kpa)= 68 4(Kpa)=
L3(m)= 3
L4(m)=
2 L2 3L3 4 L4 5 L5
* Perimeter
Qall 1L1
FS( 2)
Faculty of Engineering
0 .5
0 .5
1 .2
0 .5
B
1 .2
0 .6
1 .2
Pi
0 .5
2
M yx
4 1 .8 0 .6
14.4m
8 0 .6
2.88m
0 .4
M xy
1 .2
4 .6
Pi
Pi
2127
8
PA1 -0.6
PA2 0.6
PB1 -0.6
PB2 0.6
300y
14 . 4
Value
1.8
261.7
1.8
345.0
0.6
236.7
0.6
320.0
200x
2 . 88
Pi
Value
PC1 -0.6
PC2 0.6
-0.6
211.7
-0.6
295.0
PD1 -0.6
PD2 0.6
-1.8
186.7
-1.8
270.0
Thus Pmax =345KN < Pall =366.15KN OK! (8 piles would be enough)
Check pile group capacity
Pile group capacity is considered for the right figure.
Thus Pug =fsu Li P +qbu Ab - i hi A
Pall g = fsall Li P +qball Ab - i hi A
First lets evaluate qbu:
qbu= CNc = 150*9 = 1350Kpa
qball=1350/2=675Kpa
Group perimeter, P =2*(1.6+4) =11.2m;
P ug
0 .2
4320.0 1452.8
5374.5KN
P applied
P w P A1 P A2
v
Pw
bd
400
850.26
2.2 * 0.325
P B2
0 .2
0 .4
1 .2
0 .2
4m
B
17 * 2 17 * 8 19 * 3 * ( 4 * 1 . 6 )
2127KN
2 .2
0 .5
1 .2
0 .5
S
0 .5
A
y
1 .2
B
d
L
1 .2
0 .6
850 . 26 KN
0 .4
1 .2
0.005;
0 .5
1189.17KPa
Assume
f ctd
0.35
f ck
c ( 1 .5 )
1.28MPa
0 .2
4 .6
P B1
1 .2
0 .6
1 .6 m
1 .2
33.75 * 8 67.5 * 3
- 6.19 * 2
* 11 . 2 675 * ( 4 * 1 . 6 )
2
P ug 2507.34
1 .2
Faculty of Engineering
v all 480Kpa
vw
increase
D.
vw
479 . 6 KPa
2.2 * 0.575
v all
OK!
25
P 2A
400
vw
P 2B P 2C P 2D
76.88
3 3 . 42 KPa
4 * 0.575
76 . 88 KN
v all
OK!
P pu 2 127
v pu
7 . 24
100
P 1B
P 2B P 1C P 2C
7 . 24
100
P 1B
2 0.975 1.175
ctd
P pu 2 127
v pu
1 50
10
100
P 2B P 1C P 2C
bd
0 .6
* 0575
800Kpa
4 .6
Increase
1 .2
P 2B P 1C P 2C
765.4KPa
OK!
1063.11
2.2 * 0.6
0 .4
0 .4 + d = 9 7 5 m m
0 .6
0 .4
D! Use D 775mm
1 .2
2020.65KN
d 600mm
and
36 . 64
Km= 36.64
K s= 4.08 As(mm2)=
# 24=
16.0
0 .5 d
0 .5
P 1B
829 . 12 Kpa
use D 775mm
0 .5 d
2 1 . 0 1.2 * 0 . 6
0 .5
0 .5
2050KN
Reinforcement
a) In the long direction:
Critical section is at the face of the column
M max P A1 P A2 * 1 . 5 P B1 P B2 * 0 . 3 1063
K
1 .2
1 .2
P pu
Therefore
2 .2
0 .5
P pu
v all, p 0.5f
0 .6 + d = 1 1 7 5 m m
P pu P applied
and with
. 11 KN m
C - 30 and S - 300,
7224.01
Use 16bars in the long direction; better to use more bars directly above the piles.
b) In the short direction:
M max P A2 P B2 P C2 P D2 * 1 . 0 1230 . 70 KN m
Km= 27.26
K s= 3.99 As(mm2)=
# 24=
18.1
8189.514
Use 18bars in the short direction; better to use more bars directly above the piles.
Faculty of Engineering
1 .2
0 .5
635
0 .5
424
1 .2
524
1 .2
524
b
a
S e c tio n A -A
1 .2
600
1624, L = 5730
4460
8 2 4
8 2 4
4 .6
600
1824, L=3260
2060
4 2 4
0 .5
2 .2
635