Professional Documents
Culture Documents
Board Design
Schematics Preparation
Board Bring up and Testing
EMI/EMC Testing
Component Engineering
Reverse Engineering
EDUCATION
B.Tech with specialization in Electronics and Communication engineering from SRM University in 2008
with First Class Distinction
TOOLS
Schematics Design Tools:
PCB Design Tool
:
PROJECTS
1. Project:
Role:
Duration:
Description:
Involved in designing Dual redundant Ethernet board(DREB) which facilitates the implementation of SHP,
RSTP and PRP protocols in order to avoid failure in the data transfer to the SCADA system.
Responsibilities:
Various design analysis document prepared such as loading analysis, power analysis, voltage
compatibility analysis and de-rating analysis.
Circuit simulations.
2. Project:
Role:
Duration:
TABLET PC
Hardware Design
8 months
Description:
Involved in Designing and testing a tablet. OMAP4460 Processor as System Controller.The OMAP4460
processor supports Streaming video up to full high definition (HD) (1920 × 1080 p, 30 fps), 2dimensional (2D)/3-dimensional (3D) mobile gaming, Video conferencing, High-resolution still image (up to 16
Mp). The Tablet supports LCD with touch screen of capacitive type control through GUI. It provides the LCD
displays which include the low-power, high-ESD protection touch screen controllers, display interface
products, and LCD bias and backlight solutions.
Responsibilities:
Layout and placement guidelines for analog, digital, Flex cables and power supply circuits.
3. Project:
Role:
Duration:
Combo UI
Hardware Design
5 months
Description
Combo UI (User Interface) consists of Hardware and Software of Combo washer/Dryer. There are two types
of user Interfaces to be developed; the software to be developed shall be configurable for each of the boards.
Combo Interface boards shall communicate with the Appliance Control Unit (ACU) over a proprietary Wide
and Reveal protocol. The interfaces on the Combo Interface hardware shall consist of LEDs Seven Segment
Display, Chime, Lighting modules, Smart Grid and GP Expansion modules, The ACU is reading continuously
information from the user IO related to selected wash cycle and modifiers. It will send also information to the
user IO related to the current program status, errors, estimated remaining time and wash process information.
The information exchange will be managed by GVAL protocol.
Responsibilities:
Requirements Document study
Architecture design of the LEDs control, Touch sensor, Proximity sensor, GMR sensor, Encoder control, Drum
Light.
Component Selection.
Schematic design(DxDesigner 2005) and layout Design (Board expedition ver 7.9)
4. Project:
3 phase Smart Energy Meter
Role:
Hardware Design And Testing
Duration:
7 months
Description:
To Design & Develop a product which can read 3 AC load parameters(Voltage, Current, Power factor and
Power) and six analog channels . The data can be sent to host via wireless .It has EM773 Chip for Reading 3
AC parameters ,On board Mbed module- ARM Cortex-M3 which can read six 4 to 20mA or Ratiometric analog
input channels and On board RF transceiver 2.4Ghz which can send data wirelessly at a distance of 100 to
200meters . The hardware is connected to host network manager using wireless Dust API protocol
Responsibilities:
Layout and placement guidelines for Analog, Digital and power supply circuits
5. Project:
Industrial cinematography camera
Role:
Hardware Design and Testing
Duration:
1 Year & 6 months
Description:
Involved in Designing a Industrial cinematography camera that provides high quality video and audio for digital
still and motion picture applications. OMAP processor OMAP3525 is the application processor used for the
camera system This card has various electronic interfaces like LVDS, XAUI, DDR3, SPI, I2S and I2C.
Responsibilities:
Layout and placement guidelines for analog, digital, Flex cables and power supply circuits.
Involved in board bring up & testing for Analog and Digital boards.
Created documents on design and testing as per customer specifications and request.
6. Project:
Reverse Engineering for IO modules and Drives
Role:
Reverse Engineering
Duration:
6 months
Description:
Responsibilities:
Involved in preparing Block diagram and functional grouping for the drives and IO modules(include Analog
input, Analog output, Digital input and Digital output) from the PCB based on component identification.
7. Project:
Mobile Backhaul
Role:
Test Engineer
Duration:
6 months
Description:
Responsibilities:
Involved in Various Testing like Radiated Emission, Radiated Immunity, Conducted Emission, Conducted
Immunity, Electrostatic Discharge, Surge, Electric Fast Transient Testing