You are on page 1of 8

Central Air Conditioning Terminals

BROAD AIR CONDITIONING


INDOOR UNITS

BROAD Indoor Units have obtained international


certificates of ISO, CE, ETL and so on

Design & Model selection Manual

FUNCTION
Air conditioning, air purification
STRUCTURE
Fan coils + electrostatic
cleaner + intelligent control
system+ movable metal shell
COOLING CAPACITY
2.7kW ~130kW
(7 chilled water and 65OC
hot water can be supplied)
UNIQUE ADVANTAGES
Exposed installation of fan
coils, movable shell which
enables easy dust cleaning &
bacteria killing, eliminates the
"air-conditioning disease"
Equipped with electrostatic
cleaner purifying indoor air
effectively
Equipped with CO2 sensor
monitoring oxygen deficiency
Inverter-controlled fan, very
energy efficient
100% steel structure,
automobile stylish quality
baking finish
Plug and play concept

100g

In order to protect forests and


water resources, please follow
us to use thin, unlaminated
printing80g
paper.
BROAD Town, 410138,Changsha, China www.broad.com
Tel: +86-731-84086175 Fax: 84086387 terminals@broad.net

2011.07 First edition NO.:10,000


BY169-11 C 2011

2011.07 EN

INDOOR UNIT PRODUCT OVERVIEW

UNIQUE TECHNOLOGIES
BROAD Air Conditioning indoor units are Central Air Conditioning Terminal products. Their unique air quality
technologies have rewritten the century-old air conditioning history. They have met needs of modern architecture
with their exquisite & various models, easy installation & maintenance.

Model Code

CO2 Sensor
Electrostatic
cleaning device

Coarse filter
Electrostatic
Cleaner
Active
Carbon filter

Fan
Coils

A/C capacity

Areas (recommended) m2

Cooling

Heating

kW

kW

Common Energy
building
Efficient
building

Dimensions
Super energy (LWH)
efficient
mm
building

Flat DC3.6

3.6

5.3

20

40

80

520x320x940

DC5.4

5.4

8.1

30

60

120

520x320x1310

DC7.2

7.2

10.8

35

75

150

520x320x1500

DC12

12

18

50

100

200

520x320x2250

Oval DQ5.4

5.4

8.1

30

60

120

1670x320x700

DQ12

12

18

50

100

200

2600x320x840

Horizontal DE12
Long-range

12

18

70

150

300

2250x360x520

Vertical DF12
long-range

12

18

60

120

250

520x360x2250

Curve AD2.7

2.7

12

25

40

1560x195x340

Large EH18

18

27

70

150

300

380x840x2590

EH25

25

37.5

100

200

400

380x840x3200

EH40

40

60

150

300

650

380x840x5000

60

90

250

500

1000

2000x1900x3920

130

195

400

800

1600

3800x1900x3920

Super large EC60


EC130

AIR PURIFICATION PRINCIPLE :


Note: 1.Areas (recommended m2) need engineers to do detailed calculation, it's for your reference.
2.Super energy efficient building refers to envelop enclosure with thermal insulations and heat recovery
fresh air which have reached the highest building levels .
3.Large Model, Super large Model: areas suitable for a 4~6m height building.

Electrostatic dust cleaning:Tungsten

W
A/C
CW

A/

t
utle
.o
let

. in

te

sa
en
nd
Co et
tl
ou

filaments of electrostatic cleaners


continuously release high voltage static
electricity. All particles in the air are
positively charged, then adsorbed by
negative plates. Particles tinier than
human cells and pollens are filtered,
which can protect the respiratory system,
and reduce drastically the cancer risks.
Electrostatic Bacteria Killing: Tungsten
filaments of electrostatic cleaners
continuously release high voltage static
electricity at 6,000v. It kills instantly
bacteria, viruses, and can stop all kinds
of airborne diseases.
Active Carbon Filter eliminates
formaldehyde: traps all kinds of toxic
gases like benzene, nicotine, etc.

CLEANING ELECTROSTATIC CLEANER

CONTROLLER
A/C W inlet temp

Outdoor temp

To maintain constant purification efficiency, once the cleaner is very dusty, it has to be taken out and cleaned
(once per month). Easy to wash with detergent or ultrasonic cleaner. Each time it only takes a few minutes.

A/C W outlet temp

Indoor temp
Timer

Real-time cooling capacity (heating capacity)

Indoor humidity

A/C W flow rate

Cooling
Heating

Indoor CO2 level (monitor oxygen deficiency)


Fan frequency10~50Hz

Set temp

Infrared window

Five-position switch

OK
Green light - Operation
Red light Alarm
Light off when unit off

PRODUCT STRUCTURE
CO2 sensor
Inverter fan

Auto vent

Humidity sensor
Indoor temp sensor

Controller

T1

Coarse filter
insect mesh

Remote
control

Positively charged
tungsten filaments
Negatively charged
aluminum plates

Electrostatic
cleaner

Air purification
system

Active carbon filter

Clean air outlet

Dirty air inlet

Fan

Open shell by a slight touch

Coils
the only shared part with
conventional products

Motor valve
adjust room temp and avoid A/C
water circulation when the unit is off
to save pump electricity

Stainless steel bellows


Manual valve
adjust flow rate, for shutoff in
maintenance

A/C W outlet

Air conditioning
system

A/C W inlet
Condensate outlet
Manual valve
balance water system, for shutoff in
maintenance

Water filter
Water pan Heat meter
consists of ultrasonic flow meter
and thermometer

Easy to take out electrostatic cleaner

Use detergent and water to wash

FLAT MODEL (DC3.6DC5.4DC7.2DC12)

RATED PARAMETERS
Model

Code

A/C Capacity

A/C water

Cooling Heating CircukW


kW
lation
kg/h
Flat

Oval

DC3.6 3.6

5.3

442

Fan

Air flow
m3/h

A/C
tube
mm

25~98

650

16 16

33

40

Power
Resis- Power
tance demand consumption
W
kPa
W

30

130

Condensate N.W.
tube mm
kg

White

DC5.4 5.4

8.1

663

40

140

30~105

970

22 16

45

54

DC7.2 7.2

10.8

884

40

140

40~110

1300

22 16

52

63

DC12 12

18

1473

50

260

60~200

2160

28 16

73

86

DQ5.4 5.4

8.1

663

40

140

30~105

970

22 16

46

56

DQ12 12

18

1473

50

350

70~280

2160

28 16

88

102

Wine red

Horizontal
DE12
Long-range

12

18

1473

50

450

100~360

2160

28 16

79

92

White

Vertical
DF12
Long-range

12

18

1473

50

450

100~360

2160

28 16

79

92

White

Curve

AD2.7 2.7

331

30

50

15~40

540

16 16

24

28

White

Large

EH18 18

27

2210

60

450

130~380

2700

28 22

238

252

White

Super large

Magnificent, economic (as per cooling capacity), suitable for all kinds of buildings.

Ship. W Standard
kg
color

EH25 25

37.5

3100

60

620

180~520

3750

35 22

298

315

EH40 40

60

4960

60

1070

310~850

6000

42 22

478

505

EC60 60

90

7440

70

4800

960~4080

10800

42 22

800

860

EC130 130

195

16100 80

6730

1950~5640 23400

76 28

1300 1410

Silver
grey

Notes: 1. Rated conditions for cooling: outlet/inlet water temp14/7, inlet air dry bulb temp 27, wet bulb temp 19.5
Rated conditions for heating: outlet/inlet temp 55/65, inlet air dry bulb temp 21.
2. External residual pressure of Super large series EC60 & EC130: 90Pa and 150Pa respectively(in operation with ducting system).
3. Standard flat model designed as right side air blow, optional to choose left side air blow when an order is placed, letter
B must be added after the model.
4. Standard super large series designed as direct blow, optional to choose ducting, letter F must be added after the model.

MODEL SELECTION GUIDANCE

PERFORMANCE CURVES

LOAD
Load selection cannot be roughly estimated, it is
closely related to building thermal insulation level
rather than building areas.
If a fast model selection is needed, please refer to P 2
Areas(recommended m2).

Chilled water flowrate vs. Cooling capacity

100

ENERGY SAVING
Inverter-controlled fan cuts energy consumption
drastically at low load operation.
Actually, air conditioners are running at low load
during 90% operation time.
Optional pre-set energy saving mode saves energy by
20%~30%.

90
85

520

80

320

75
70
50

60

70

80

90

100

4 bolts M8

Flowrate %
Power input

Chilled water temp vs. Cooling capacity

140

OPTIONS
Remote control: adjust temperature and air flow,
USD13/pc. One pc is recommended for one room,
for a room equipped with multiple fan coils, one is
recommended for 3 pcs. In public rooms like hotels
can use control panel instead.
Color: products have standard color please read
Rated Parameters, if customers prefer different colors,
additional 7% will be billed. It is also optional to choose
special panels, for instance, stainless steel, titanium, goldplating, price is high, lead time is longer.

80

A/C W return A
Condensate

35

60
40
23

24

25

26

Return air temp.

27

28

B
185

Air flow vs. Air pressure ( for super large series ducting model)
External static pressure (Pa)

100

Cooling capacity%

COMFORT
Air cannot be blown directly to people.
Inverter-controlled fan makes the quiet operation.

A/C W supply A

5
6
7
8
9
10

120

100~600

88

130

95

26

QUANTITIES
One unit per room is recommended.
More units might be recommended for spacious room
with more furniture.

Cooling capacity%

65

300

Air inlet

ECF130

Model

200
ECF50
100
(illustrated model is 5.4kW)
Air outlet

Dimensions (mm, the same


on the following pages)

60
Air flow %

100

140

DC3.6

940

16

48

DC5.4

1310

22

60

DC7.2

1500

22

60

DC12

2250

28

70

Note: If it cant be wall-mounted,


choose floor bracket, 5% price more.

HORIZONTAL LONG-RANGE MODEL (DE12)

Magnificent & stylish. Choices with special elegant panel (as mirror-style stainless steel,
brushed stainless steel, even titanium plate).

Adjustable nozzles, suitable for densely-stuffed rooms.

A/C W supply Condensate


22 28

Air inlet

16
Air outlet
(adjustable
any direction)

700

60 70

Power input

A/C W return
28

4 bolts M8

Condensate
2250

2040

1670

2600

28

16

26

259 251

320

1700~2000

1100

1400~1900

Air outlet

A/C W
supply

130

120

840

82

368 720

105

244 287

300

230 222

65

520

22 28

360

A/C W return

70

6 bolts M8

88

Power input
Air inlet

185

OVAL Model (DQ5.4,DQ12)

Note: Two data of dimension for DQ5.4 and DQ12 respectively.

(illustrated model is 5.4kW)

VERTICAL LONG-RANGE (DF12)

LARGE MODEL (EH18EH25EH40)

Adjustable nozzles, suitable for densely-stuffed rooms.

Suitable for open space, nozzles can be adjusted, especially suitable for airport, supermarket. Either
placing independently or against the wall, the body can be used for billboards.

520
360

840

840

200

200

380

380

88

Air outlet direct


Air outlet
to thedirect
lobbyto the lobby

65

(adjustable)(adjustable)

4 bolts M8

5000

Air inlet

2590

2590

2250

3200

Air inlet

3200

Air outlet Air outlet


(adjustable)(adjustable)

5000

Power input

A/C W supply 28
Return water
Return
tube water tube
28 35 28
42 35 42

A/C W return 28
Condensate 16

Supply water
Supply
tube water tube

342

10

Condensate
Condensate
20
20

770

80

80

Note:There are 3 dimensions:


EH18,EH25 and EH40

Air inlet

342
4 bolts M12 4 bolts M12
135

90

30

Air outlet
(adjustable
any direction)

135

770

(illustrated model
(illustrated
is 25kW)
model is 25kW)

185

90

70

130

35

26

100~1500

28 35 28
42 35 42

70
70
Power input Power input
Maintenance
Maintenance
access
access
Maintenance
Maintenance
access
access

SUPER LARGE MODEL (EC60EC130)


Suitable for large open space, nozzles can be adjusted, can be connected to ducting system. Body can
be used as billboards.

2000

3800

Air outlet

1900

Air outlet

Air outlet

Air outlet

Air outlet direct


to the lobby
(adjustable)
Paper filter

3920

Coil

A/C W supply

Electrostatic
cleaner

42 76

Coarse filter

A/C W return
42 76
Air inlet

Air inlet

Air inlet
Air inlet

300
(illustrated model is EC60)

Maintenance
access

Maintenance
access

Maintenance
access

160

Power input

Maintenance
access

Note: Two data of dimension for


EC60 and EC130 respectively.

11

Condensate 22 28

150 200

12

CURVE MODEL (AD2.7)

INSTALLATION TIPS

Low position installation, low position air outlet, super energy-efficient

1. Installation procedures

3. Tips for shell installation

Pre-installed piping and wiring

During the construction, A/C water supply & return tubes (with
pre-installed valve), condensate tubes, power supply cable,
signal wire shall be implemented to the location of indoor
units.Water pumps must be started circulation for 5 days at
least so that impurities inside tubes can be collected.

4. Tips for piping connection

Shell installation
Indoor units are to be installed after the room decoration.
Handle them with care to avoid any damage. Locate and
drill holes on the wall against the screw holes on the shell
back first, then insert expansion bolts and mount the unit.
(Large model must be equipped with anchor bolts whereas
super large model may not apply them) .

Keep the shell horizontal with no more than 2 mm gradient.


The expansion bolts should be strong enough to support at
least 3 times the weight of the shell (as there might be an
impact when the cover is opened).

Shut off the pre-installed valves (water return/ supply


valves), take out and wash water filter, then fix them back.
Take out the bellows for temporary circulation and send it
back to BROAD.
Connect the pre-installed valves with indoor units by 2
stainless steel bellows of proper length.
The condensate tube must be with a certain gradient.

Tube connection
Connect the pre-installed water supply tube, water return
tube and condensate tube to the indoor units. Check
&clean impurities of the water filter.Water return & supply
tubes can be connected with flexible stainless steel bellows
Stainless steel bellows (BROAD supply)

Power connection
Lead power cable from the wiring terminal to indoor power
supply. The power cable must comply with the local codes
and standards.

5. Electric wiring(List of site work)

Outdoor thermometer installation

External Wiring
power
terminal

Lead a 20.3mm2 cable from indoor unit wiring terminal.


Install the sensor outside the window and avoid direct
sunshine. The length of the cable should be less than 30m.
(If thermometer is separately purchased from BROAD,it must
be mounted in the sunshade box from BROAD).

Controller installation(most models have installed


controllers before shipment).
The controller can be installed on a supporter supplied with
the unit, or lead 30.15mm2 control cable from the wiring
terminal and install the controller onto the wall nearby. The
location should be convenient to operate.

2. Tips for piping and wiring pre-installation

A/C W supply 16

Fix the reserved location of pipeline wire and installation


height, then Install pipeline.
Copper tubes must be adopted in supply/ return water
tubes. Low temperature brazed welding is recommended
in connecting the tubes (450 hot air guns welding). The
A/C W. tubes should be covered with 30mm-80mm rubber
plastic cold insulation material and non-metal tubes can
be used for condensate tubes.
BROAD pre-installed valve should be installed at the end of
pipeline(as shown below). Water supply valve is also a flow
regulating valve which can balance the flow rate of each
indoor unit. It also has a shutoff function which facilitates
filter washing. The valve must be reset each time.
W. return valve

A/C W return 16

195
Air inlet

1560

Elbow for
temporary
circulation

179

340

115

71

W. supply valve

48

4 bolts M8

200~300

Water filter
Air outlet

Power input

Condensate 16

Pre-installed valve (BROAD supply)


Note: Please follow the marks to install and make sure not
to mix up the supply & return W. tubes, otherwise
coils will be clogged!

13

14

After completion of whole building installation, keep the


chilled water pump running continuously for min. 5 days to
accumulate impurities at each filter. Wash the filters before
indoor units are installed.

Item

Installation Material
position

Controller Wiring
terminal

Applicable Material Scope


source

31.0mm2

2.7~7.2kW User

31.5mm2

9~18kW

32.5mm2

25~40kW

54.0mm2

60kW

56.0mm2

130kW

30.15mm2
All
communication
cable

Installer

BROAD Installer

Notes:
All electric materials and methods for installation must comply
with the local codes and standards.
Specific connection refers to Exterior wiring diagram
attached with unit.
All the units must be of reliable grounding.

6. Power on inspection

After the installation is completed, check the settings in


indoor unit controller item by item according to Parameter
Setting from User's Manual.
Pay special attention to the fan motor noise, outdoor/
indoor temperature and CO2 concentration.
Check indoor unit and lighting on/off through controller or
remote control.

7. A/C hydraulic balance commissioning


Start up all indoor units in the whole building for cooling or
heating operation.
Check that whether the output of each indoor unit is
consistent. Use an infrared thermometer to test whether the air
outlet temp from each indoor unit is the same.
Turn up its flow regulating valve or turn down valves of nearby
indoor units if the air temp from an indoor unit cannot reach
the target. Repeat the adjustment till a hydraulic balance is
reached.
Generally the valve openness of those indoor units closer to
the chiller should be smaller.

8. Air purification commissioning


Compare particles from the outlet and inlet with particle
detector (or Particles instrument).
Take out the electrostatic cleaner after operating for a day
and check dust collection.
If not, there might be some faults. Please notify BROAD or
BROAD authorized service provider.

You might also like