DEFINITION
EFFECTIVENESS/QUALITY
The extent to which actual performance compares with targeted performance. The degrees to which
objectives are achieved and the extent to which targeted problems are solved. In management,
effectiveness relates to getting the right things done.
EFFICIENCY
The extent time to which time or resources is used for the intended task or purposes. Measures
whether targets are accomplished with a minimum amount or quantity of waste, expense, or
unnecessary effort.
TIMELINESS
Measures whether the deliverable was done on the requirements of the law and/or
clients/stakeholders. The-related performance indicators evaluate such things as project completion
deadlines, time management skills and other time-sensitive expectations.
ADJECTIVAL
OUTSTANDING
VERY SATISFACTORY
SATISFACTORY
UNSATISFACTORY
POOR
For the rating to be objective, impartial, and verifiable, you need to indicate the operational definition or meaning of each numerical rating
under each relevant dimension (i.e., quality, efficiency, or timeliness) per performance target or success indicator
PERFORMANCE OUTPUT
1)
2)
Manages, coordination and supervision of activities concerning engineering and technical services for the agency including maintenance of
PAGASA facilities and equipment;
Direct the functions, operations, programs, activities and services of the Division;
Implements plans and programs for field station infrastructure, facilities and equipment modernization;
Implements periodic preventive maintenance of field stations equipment, facilities and instruments; and
Provide updated standards and guides on meteorological instruments and methods of observation in accordance with established international
and/or regional techniques and procedures for meteorological observing services
MANAGEMENT AND SUPERVISION
RATING
QUALITY
5
100% of disputes, issues and concerns are 100%
satisfactorily resolved.
4
85%-99% of disputes, issues and concerns are 85%99% satisfactorily resolved.
3
75%-84% of disputes, issues and concerns are 75%84% satisfactorily resolved.
2
60%-74% of disputes, issues and concerns are 60%74% satisfactorily resolved.
1
Below 60% of disputes, issues and concerns are 60%
satisfactorily resolved.
REPLY TO QUERRIES
RATING
QUALITY
5
Approved by the Division/Section Chief upon 1st
submission of draft reply letter.
4
Approved by the Division/Section Chief upon 2nd
submission of draft reply letter with 1 minor revision.
3
Approved by the Division/Section Chief upon 2nd
submission of draft reply letter with 1-2 minor errors.
2
Approved by the Division/Section Chief upon 3rd
submission of draft reply letter with 1-2 minor errors.
1
Approved by the Division/Section Chief upon 3rd
EFFICIENCY
TIMELINESS
100% settled within 3 days.
85%-99% settled within 5 days.
75%-84% settled within 7 days.
60%-74% settled within 10 days.
Below 60% settled more than 10
days.
EFFICIENCY
TIMELINESS
Replies to queries within an
average of 10 days.
Replies to queries within an
average of 11 to 14 days.
Replies to queries within 15 days.
Replies sent delayed by an
average of 1 to 7 days.
Replies sent delayed by an
3)
3)
4)
EFFICIENCY
Accomplished
10% lapses
TIMELINESS
within 2 days
within 2 days and 4 hours
25% lapses
35% lapses
50% lapses
within 3 days
within 4 days
within 5 days
PREPARATION/SUBMISSION OF SO TO, IT, DV, LIQUIDATION REPORTS and CASH ADVANCES, PR, and RIS
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
Preparation of SO, TO, IT, DV, Liquidation Reports and
No wastage
Shall be completed:
Cash Advances, PR and RIS with no grammar errors.
SO & TO within 1 hour
IT & DV within 1 hours
Liquidation Reports and Cash
Advances within 1 hour
PR & RIS within 1 hour
4
Preparation of SO, TO, IT, DV, Liquidation Reports and
With 1 to 2 wastages.
Shall be completed:
Cash Advances, PR and RIS with 1-3 minor grammar
4)
4)
With 3 to 4 wastages.
With 5 to 6 wastages.
EFFICIENCY
No wastage
With 1-2 wastages
With 3-4wastage
5-6 wastages
7 and more wastages
TIMELINESS
1 working day
1 day and 2 hours
3
2
1
4)
5)
submission
80-89% of SO, TO and Justification prepared and
submitted to the section chief without error on its first
submission
70-79% of SO, TO and Justification prepared and
submitted to the section chief without error on its first
submission
Below 70% of SO, TO and Justification prepared and
submitted to the section chief without error on its first
submission
2 days
EFFICIENCY
No wastage
TIMELINESS
Verified within 10 minutes or less
Verified
less
Verified
less
Verified
less
Verified
1-2 wastages
3-4 wastages
5-6 wastages
EFFICIENCY
TIMELINESS
Documents submitted for approval
within the day.
Documents submitted for approval
2 days after received.
Documents submitted for approval
3 days after received.
Documents submitted for approval
4 days after received.
Documents submitted for approval
more than 4 days after received.
missing documents.
6)
6)
7)
EFFICIENCY
Arrived on time.
With 1-3 times late.
With 4-6 times late.
With 7-9 times late.
With more than 9 times late.
TIMELINESS
No absent
3 times absent
4 times absent
5 times absent
More than 5 times absent
TIMELINESS
Completed within 1 hour
8)
9)
TIMELINESS
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within
10 minutes upon request
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within
15 minutes upon request
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within
30 minutes upon request
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within a
day
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within a
day
TIMELINESS
within 4 hours
EFFICIENCY
No wastage
4
3
2
1
within 1 day
within 2 days
within 3 days
Undertakes installation, maintenance and repair of the Agencys Weather Surveillance Radars, Upper-Air sounding equipment, Automatic
Weather Station, Met. satellite receving facilities and basic meteorological instruments and equipment;
Provide technical services for the maintenance of the Agencys meteorological telecommunications system(s) and facilities;
Provides technical assistance to other offices/branches primarily in the installation, repair and maintenance of various telecommunications
systems and other related electronics and communications equipment;
Undertakes designs, development and maintenance of the agencys network infrastructure and other services pertaining to ICT; and
Formulates, updates and implements an effective and efficient agency Information System Strategic Plan.
1)
REPAIR AND MAINTENANCE WORKS OF METEOROLOGICAL INSTRUMENTS /EQUIPMENT AND TELECOMMUNICATIONS EQUIPMENT
INCLUDING SUPPORT FACILITIES
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
100% of targeted work planned repair and
With no breakdown within 6
100% of targeted plan completed
maintenance works
months.
1 week
completed with no breakdown within 6 months.
before deadline.
4
85%-99% of targeted work planned repair and
With 5% breakdown within 6
85%-99% of targeted plan
maintenance
months.
completed
works completed with 5% breakdown within 6 months.
before deadline.
3
75%-84% of targeted work planned repair and
With 10% breakdown within
75%-84% of targeted plan
maintenance
6 months.
completed before deadline.
works completed with 10% breakdown within 6
months.
2
60%-74% of targeted work planned repair and
With 20% breakdown within
60%-74% of targeted plan
maintenance
6 months.
completed before deadline.
works completed with 20% breakdown within 6
months.
1
Below 60% of targeted work planned repair and
With more than 20%
Below 60% of targeted plan
maintenance
breakdown within 6 months.
completed before deadline.
works completed with more than 20% breakdown
within 6 mons.
1)A
CLEAN, CALIBRATION, REPAIR AND MAINTENANCE OF BASIC METEOROLOGICAL INSTRUMENTS (SYNOPTIC AND AGROMET)
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
Cleaned/ Repaired/ Calibrated and Maintenance of Meteorological
100% Preventive and Corrective
Instrument/ Equipments in the field station
Maintenance of Meteorological
w/in 3 working days
Basic Instrument
4
Cleaned/ Repaired/ Calibrated and Maintenance of Meteorological
85-99% Preventive and Corrective
Instrument/ Equipments in the field station
Maintenance of Meteorological
w/in 5 working days
Basic Instrument
3
Cleaned/ Repaired/ Calibrated and Maintenance of Meteorological
75-84% Preventive and Corrective
Instrument/ Equipments in the field station
Maintenance of Meteorological
w/in 7 working days
Basic Instrument
2
Cleaned/ Repaired/ Calibrated and Maintenance of Meteorological
60-75% Preventive and Corrective
Instrument/ Equipments in the field station
Maintenance of Meteorological
Completed within 2 weeks
Basic Instrument
1
Cleaned/ Repaired/ Calibrated and Maintenance of Meteorological
50-60% Preventive and Corrective
Completed within 3 weeks
Instrument/ Equipments in the field station
Maintenance of Meteorological
Basic Instrument
1)B
CLEAN, REPAIR, CALIBRATION OF BASIC METEOROLOGICAL INSTRUMENTS THAT COULD BE USED FOR THE REPLACEMENT AT
DIFFERENT STATION
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
Cleaned, repaired, calibrated basic meteorological instruments that
100% Completed
w/in 2 working days
could be used for the replacement at different station
4
Cleaned, repaired, calibrated basic meteorological instruments that
85-99% Completed
w/in 3 working days
could be used for the replacement at different station
3
Cleaned, repaired, calibrated basic meteorological instruments that
75-84% Completed
w/in 5 working days
could be used for the replacement at different station
2
Cleaned, repaired, calibrated basic meteorological instruments that
60-75% Completed
Completed within 3 weeks
could be used for the replacement at different station
1
Cleaned, repaired, calibrated basic meteorological instruments that
50-60% Completed
Completed within the Month
could be used for the replacement at different station
2)
URGENT REQUEST/UN SCHEDULED REPAIR AND MAINTENANCE WORKS OF METEOROLOGICAL INSTRUMENTS /EQUIPMENT AND
TELECOMMUNICATIONS EQUIPMENT
INCLUDING SUPPORT FACILITIES (INTERVENING)
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
100% of unplanned/urgent repair and maintenance
No breakdown within 6
Completed 4 weeks upon
works
months.
request /notice
completed with no breakdown within 6 months.
4
85%-99% of unplanned/urgent repair and maintenance With 5% breakdown within 6
Completed 6 weeks upon
works
months.
request/notice
completed with 5% breakdown within 6 months.
3
75%-84% of unplanned/urgent repair and maintenance With 10% breakdown within
Completed 8 weeks upon
works
6 months.
request/notice
completed with 10% breakdown within 6 months.
2
60%-74% of unplanned/urgent repair and maintenance With 15% breakdown within
Completed 10 weeks upon
works
6 months.
request/notice
with 15% breakdown within 6 months.
1
Below 60% of unplanned/urgent repair and
With 20% breakdown within
Completed more than 10 weeks
maintenance works
6 months.
upon request/notice
completed with 20% breakdown within 6 months.
3)
TIMELINESS
100% completed within the set
deadline.
90%-99% completed within the
3
2
1
3)A
4)
FABRICATION OF STAINLESS WIND MAST AND LIGHTNING ARRESTER FOR WING MAST
RATING
QUALITY
EFFICIENCY
5
Fabrication of Stainless Wind Mast and Lightning Arrester
completed with 100% acceptability and satisfaction based 100% Completed
on quality standard.
4
Fabricated of Stainless Wind Mast and Lightning Arrester for wind
85-99% Completed
mast pole
3
Fabricated of Stainless Wind Mast and Lightning Arrester for wind
75-84% Completed
mast pole
2
Fabricated of Stainless Wind Mast and Lightning Arrester for wind
60-75% Completed
mast pole
1
Fabricated of Stainless Wind Mast and Lightning Arrester for wind
50-60% Completed
mast pole
PLANNED INSTALLATION OF EQUIPMENT, INSTRUMENT AND OTHER SUPPORT FACILITIES
RATING
QUALITY
EFFICIENCY
5
100% of planned installation works completed with no Savings of 10% of project
back job.
cost.
4
3
2
1
Savings of 8% of project
cost.
Savings of 6% of project
cost.
Savings of 4% of project
cost.
Savings of less than 4% of
project cost.
set deadline.
80%-89% completed within the
set deadline.
70%-79% completed within the
set deadline.
Below 70% completed with the
set deadline
TIMELINESS
w/in 3 working days
w/in 5 working days
w/in 7 working days
Completed within the Month
Completed within the Month
TIMELINESS
100% of planned installation
works completed 1 week before
deadline.
85%-99% of the planned
installation
works completed 1 month after
deadline.
75%-84% of the planned
installation works completed 2
months after deadline.
60%-74% of the planned
installation works completed 3
months after deadline.
Below 60% of the planned
installation works completed more
than 3 months after deadline.
4)A
5)
EFFICIENCY
No modifications and
program compilation errors
- No comments from enduser.
- Complied with logical
concept
- Full feature functionality
Minimal modifications and
program compilation errors
- Complaint with logical
concept
- Features/functions are
generally acceptable
TIMELINESS
TIMELINESS
100% completed before the
assigned deadline
6)
7)
EFFICIENCY
No downtime in the
operations office work
services
Downtime period is
experience for one (1) day
Downtime is expected up to
five (5) days
Downtime is expected up to
ten (10) days
EFFICIENCY
No requisition of parts
Purchase of spare parts
needed
TIMELINESS
Maintenance being done on time
as schedule
Delayed in
preventive
day
Delayed in
preventive
days
Delayed in
preventive
days
Delayed in
preventive
days
the conduct of
maintenance for (1)
the conduct of
maintenance for (3)
the conduct of
maintenance for (5)
the conduct of
maintenance for (10)
TIMELINESS
Regular checking of network being
done every day as per plan
Delayed render maintenance for
(1) day
3
2
1
8)
9)
10)
9)A
EFFICIENCY
Inspected/visited with very
satisfactory feedback
Inspected/ visited with
satisfactory feedback
Inspected/visited with good
feedback
Inspected/visited with fair
feedback
Inspected/visited with not
satisfied feedback
TIMELINESS
Conducted ahead of schedule
planned
Conducted 100% of schedule
planned
Conducted 7 days delayed of
schedule planned
Conducted 15 days delayed of
schedule planned
Conducted 1 month delayed of
schedule planned
EFFICIENCY
Accomplished
10% lapses
TIMELINESS
within 2 days
within 2 days and 4 hours
25% lapses
35% lapses
50% lapses
within 3 days
within 4 days
within 5 days
TIMELINESS
within 2 days
within 2 days
within 3 days
within 4 days
within a day
RATING
5
4
3
2
1
QUALITY
no error
1-3 minor errors
4-6 minor errors
7-9 minor errors
EFFICIENCY
No wastage
With 1-2 wastages
With 3-4wastage
5-6 wastages
100%
100%
100%
100%
acted
acted
acted
acted
upon
upon
upon
upon
with
with
with
with
TIMELINESS
Acted upon within 3 hours or less
Acted upon within 4 hours
Acted upon within 5 hours
Acted upon within an average of
6-8 hours
Acted upon beyond 1 day
TIMELINESS
1 working day
1 day and 2 hours
1 day and 4 hours
1 day and 6 hours
2 days
10)B PREPARATION OF TRAVEL ORDER, DISBURSEMENT VOUCHER, ITINERARY OF TRAVEL, COMPLETE STAFF WORK AND
JUSTIFICATION
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
100% TO, DV, TEV, CSW and Justification prepared and submitted
Accomplished
1 working day
to the Section Chief without error of its first submission
4
90-99% TO, DV, TEV, CSW and Justification prepared and
With 1-10 wastage
1 day and 2 hours
submitted to the Section Chief without error of its first submission
3
80-89% TO, DV, TEV, CSW and Justification prepared and
With 11-20 wastage
1 day and 4 hours
submitted to the Section Chief without error of its first submission
2
70-79% TO, DV, TEV, CSW and Justification prepared and
With 21-30 wastage
1 day and 6 hours
submitted to the Section Chief without error of its first submission
1
Below 70% TO, DV, TEV, CSW and Justification prepared and
With more than 30 wastage
2 days
submitted to the Section Chief without error of its first submission
11)
TIMELINESS
12)
EFFICIENCY
No wastage
TIMELINESS
Verified within 10 minutes or less
Verified
less
Verified
less
Verified
less
Verified
1-2 wastages
3-4 wastages
5-6 wastages
13)
14)
EFFICIENCY
No wastage
TIMELINESS
within 4 hours
within 1 day
within 2 days
within 3 days
15)
OTHER INTERVENING FUNCTIONS (DRAWING, ESTIMATE, IMPLEMENTATION/MONITORING OF INFRA PROJECT, WEATHER
INSTRUMENTS INSTALLATION
AND ACT AS SDO)
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
100% of the unscheduled/ emergency repair works are 120% acceptability
Within 120% of estimated time
completed with 100% acceptability and satisfaction
schedule
4
3
2
1
100% acceptability
80% acceptability
70% acceptabilty
60% acceptability
C.
Coordinates the planning, management and supervision on matters concerning the maintenance, repair and rehabilitation of the agencys
critical support facilities and equipment, power generators, air-conditioning and refrigeration and other office equipment;
Fabricates wing masts and similar support facilities for basic meteorological instruments and spare parts and related products necessary and/or
requires for the maintenance of facilities;
Provides technical services for the repair and/or maintenance of the Agencys service vehicles;
Undertakes planning, design and implementation of infrastructure programs and projects of the Agency.
1)
PLANNED REPAIR AND MAINTENANCE WORKS OF MECHANICAL/ELECTRICAL GENERATING SYSTEM, MOTOR VEHICLES AND OTHER
SUPPORT FACILITIES
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
100% of targeted work planned repair and
With no breakdown within 6 100% of targeted plan completed
maintenance works
months.
1 week before deadline.
completed with no breakdown within 6 months.
4
85%-99% of targeted work planned repair and
With 5% breakdown within 6
85%-99% of targeted plan
maintenance
months.
completed
works completed with 5% breakdown within 6 months.
before deadline.
3
75%-84% of targeted work planned repair and
With 10% breakdown within
75%-84% of targeted plan
maintenance
6 months.
completed before deadline.
works completed with 10% breakdown within 6
months.
2
60%-74% of targeted work planned repair and
With 20% breakdown within
60%-74% of targeted plan
maintenance
6 months.
completed before deadline.
works completed with 20% breakdown within 6
months.
1
Below 60% of targeted work planned repair and
With more than 20%
Below 60% of targeted plan
maintenance
breakdown within 6 months.
completed before deadline.
works completed with more than 20% breakdown
within 6 mons.
2)
URGENT REQUEST/UN SCHEDULED REPAIR AND MAINTENANCE WORKS OF EQUIPMENT INCLUDING VEHICLES (INTERVENING)
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
100% of unplanned/urgent repair and maintenance
No breakdown within 6
Completed 4 weeks upon
works
months.
request/notice
completed with no breakdown within 6 months.
4
85%-99% of unplanned/urgent repair and maintenance With 5% breakdown within 6
Completed 6 weeks upon
works
months.
request/notice
completed with 5% breakdown within 6 months.
3
75%-84% of unplanned/urgent repair and maintenance With 10% breakdown within
Completed 8 weeks upon
works
6 months.
request/notice
2
1
3)
PLANNED INSTALLATION OF EQUIPMENT, INSTRUMENT SHELTER AND OTHER SUPPORT FACILITIES AND OTHER SUPPORT
FACILITIES
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
100% of planned installation works completed with no Savings of 10% of project
100% of planned installation
back job.
cost.
works completed 1 week before
deadline.
4
85%-99% of planned installation works completed
Savings of 8% of project
85%-99% of the planned
with no back
cost.
installation
job.
works completed 1 month after
deadline.
3
Savings of 6% of project
75%-84% of the planned
75%-84% of planned installation works completed
cost.
installation works completed 2
with 1 back job.
months after deadline.
2
Savings of 4% of project
60%-74% of the planned
60%-74% of planned installation works completed
cost.
installation works completed 3
with 2 back jobs.
months after deadline.
1
Below 60% of planned installation works
Savings of less than 4% of
Below 60% of the planned
completed with more than 2 back jobs.
project cost.
installation works completed more
than 3 months after deadline.
Note: Including carpentry and plumbing works and etc.
Note: When rated, the number of back jobs will prevail over output.
4)
2
1
set deadline.
Project completed 7 months after
set deadline.
Projects completed more than 7
months from set deadline.
5)
6)
TIMELINESS
Completed:
Above P350,000.00 P 1 M 15 days
2
Prepared all plans, design and specifications and
estimates with 4 revisions.
1
Completed:
P 350,000.00 P 1 M - 25
days
Above P 1M - 1.5 months
Completed:
P 350,000.00 P 1 M - 30
days
Above P 1M - 2 months
Completed:
P 350,000.00 P 1 M - 35
days
Above P 1M 2.5 months
Completed:
Above P 350,000.00 P 1 M 40 days
Above P 1M - more than 2.5
months
7)
TIMELINESS
100% completed within the set
deadline.
90%-99% completed within the
set deadline.
80%-89% completed within the
set deadline.
70%-79% completed within the
set deadline.
Below 70% completed with the
set deadline
8)
9)
10)
EFFICIENCY
No back job.
No back job.
EFFICIENCY
With 1 revision
With 2 revisions.
TIMELINESS
100% completed within the set
deadline.
TIMELINESS
Report shall be completed
day.
Report shall be completed
days.
Report shall be completed
days.
Report shall be completed
days.
Report shall be completed
than 4 days.
within 1
within 2
within 3
within 4
more
TIMELINESS
Completed:
Below P 50,000.00 5 days
Above P 50,000.00 - 10 days
Completed:
Below P 50,000.00 - 7 days
Above P 50,000.00 - 15 days
Completed:
11)
12)
With 3 revisions.
Completed:
Below P50,000.00 15 days
Above P 50,000.00 25 days
Completed:
EFFICIENCY
No traffic violations.
TIMELINESS
Always available and on time.
4 - 6 times late.
EFFICIENCY
Accomplished
10% lapses
TIMELINESS
within 2 days
within 2 days and 4 hours
25% lapses
35% lapses
50% lapses
within 3 days
within 4 days
within 5 days
EFFICIENCY
inspected/surveyed/visited
with very satisfactory
feedback
inspected/surveyed/visited
with satisfactory feedback
TIMELINESS
Conducted ahead of schedule
planned
13)
3
2
1
14)
16)
15)
TIMELINESS
1 working day
1 day and 2 hours
1 day and 4 hours
1 day and 6 hours
2 days
TIMELINESS
17)
18)
EFFICIENCY
No wastage
TIMELINESS
Verified within 10 minutes or less
Verified
less
Verified
less
Verified
less
Verified
1-2 wastages
3-4 wastages
5-6 wastages
3
2
1
19)
20)
etc.
Attend training, workshops, conferences, meetings,
etc.
Attend training, workshops, conferences, meetings,
etc.
Attend training, workshops, conferences, meetings,
etc.
80% completed
70% completed
60% completed
EFFICIENCY
No wastage
TIMELINESS
within 4 hours
within 1 day
within 2 days
within 3 days
TIMELINESS
Within 120% of estimated time
schedule
100% acceptability
80% acceptability
70% acceptabilty
60% acceptability
Undertakes quality control of surface synoptic, upper-air, marine, aeronautical, agrometeorological, precipitation and weather radar observation
data in accordance with national/regional/international standards for real-time and other uses by the Agencys major units;
Coordinates and monitors status of station operations and recommends solutions and alternatives to maintain field station operations;
Provide updated guidelines and procedures on weather data acquisition and reporting and weather instruments and methods of observation in
accordance with WMO standards.
1)
DATA RECEIVED/INDEXED/ DISTRIBUTED ACTIVITIES ( BOTH SYNOP, AGROMET, CLIMAT & RAIN STATIONS)
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
Received/ Indexed/ Distributed to Quality controllers
100% of submitted reports
Indexed/ distributed to quality
assigned, submitted reports from field stations
monthly from field stations
controllers assigned within 1-2
(Synoptic, Agromet, Climat Station) w/ no errors
days upon receipt
4
Received/ Indexed/ Distributed to Quality controllers
85-99% of submitted reports w/in 3 working days
assigned, submitted reports from field stations
from field stations
(Synoptic, Agromet, Climat Station) w/ 2- 4 minor
errors
3
Received/ Indexed/ Distributed to Quality controllers
75-84% of submitted reports w/in 5 working days
assigned, submitted reports from field stations
from field stations
(Synoptic, Agromet, Climat Station) w/ 5- 7minor
errors
2
Received/ Indexed/ Distributed to Quality controllers
60-75% of submitted reports Completed within the month
assigned, submitted reports from field stations
from field stations
(Synoptic, Agromet, Climat Station) w/ major errors
1
Received/ Indexed/ Distributed to Quality controllers
50-60% of submitted reports Completed within the month
assigned, submitted reports from field stations
from field stations
(Synoptic, Agromet, Climat Station) w/ major errors
2)
EFFICIENCY
TIMELINESS
5
4
3
2
1
Quality control
days
Quality control
days
Quality control
days
Quality control
days
Quality control
than 6 days
completed in 3
completed in 4
completed in 5
completed in 6
completed in more
Note: To include Synoptic Form 1001 & 1201, AGROMET Forms 8008, 8007, 8007-A, Rain/CLIMAT Forms 1051
3)
RE-ORIENTATION / BRIEFING ON ERRONEOUS REPORTS AND AS RESOURCE PERSON REGARDING WEATHER OBSERVATION IN
ACCORDANCE WITH WMO STANDARD
RATING
QUALITY
EFFICIENCY
TIMELINESS
5
100% of station field personnel briefed/oriented on
Briefings conducted before set
erroneous observed data are very satisfied
schedule.
4
90-99% of station field personnel briefed/oriented on
Briefings conducted on the set
erroneous observed data with a satisfactory feedback
schedule.
3
80-89% of station field personnel briefed/oriented on
Briefings conducted after the set
erroneous observed data with a good feedback.
schedule.
2
70-79% of station field personnel briefed/oriented on
Briefings conducted 1 month after
erroneous observed data with a fair feedback.
the set schedule.
1
Below 70% of station field personnel briefed/oriented
Briefings conducted more than 1
on erroneous observed data.
month after set schedule.
4)
5)
EFFICIENCY
Inspected/visited with very
satisfactory feedback
Inspected/ visited with
satisfactory feedback
Inspected/visited with good
feedback
Inspected/visited with fair
feedback
Inspected/visited with not
satisfied feedback
TIMELINESS
Conducted ahead of schedule
planned
Conducted 100% of schedule
planned
Conducted 7 days delayed of
schedule planned
Conducted 15 days delayed of
schedule planned
Conducted 1 month delayed of
schedule planned
RENDERS TECHNICAL ASSISTANCE TO TELEPHONE/WALK-IN/ VISITING CLIENTS WITH REGARDS TO WEATHER OBSERVATION
RATING
5
6)
FOR
QUALITY
Attended to request for information/technical
assistance or referred to the proper office/employee
concerned, accomplished with no error
EFFICIENCY
100% of the request for
information assistance or
referral to the proper
office/employee concerned
attended to
90-99% of the request for
information assistance or
referral to the proper
office/employee concerned
attended to
80-89% of the request for
information assistance or
referral to the proper
office/employee concerned
attended to
70-79% of the request for
information assistance or
referral to the proper
office/employee concerned
attended to
60-70% of the request for
information assistance or
referral to the proper
office/employee concerned
attended to
TIMELINESS
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within
10 minutes upon request
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within
15 minutes upon request
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within
30 minutes upon request
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within a
day
Attended to request for
information assistance or referred
to the proper office/ employee
concerned, accomplished within a
day
UPDATE OF WMO TECHNICAL REGULATION/ TABLES OF METEOROLOGICAL STANDARD AND PRACTICES ( MASSO, SPECIAL TABLE
HIGH ELEVATION STATION, AGROMET MANUALS & AGROMET TABLES)
RATING
QUALITY
EFFICIENCY
5
100% of the targeted number of technical
No errors committed.
regulation/tables of meteorological standards were
completely and satisfactorily updated.
4
90% -99%of the targeted number of technical
With 1-5 minor errors
regulation/tables of meteorological standards were
committed.
completely and satisfactorily updated.
3
80% -89%of the targeted number of technical
With 6-10 minor errors
regulation/tables of meteorological standards were
committed.
completely and satisfactorily updated.
2
70% -79%of the targeted number of technical
With 1-5 major errors
regulation/tables of meteorological standards were
committed.
completely and satisfactorily updated.
TIMELINESS
Completed before the set
deadline.
Completed on the set deadline
Completed 1 month after the set
deadline
Completed 2 months after the set
deadline
7)
8)
9)
EFFICIENCY
Accomplished
10% lapses
TIMELINESS
within 2 days
within 2 days and 4 hours
25% lapses
35% lapses
50% lapses
within 3 days
within 4 days
within 5 days
TIMELINESS
1 working day
1 day and 2 hours
1 day and 4 hours
1 day and 6 hours
2 days
TIMELINESS
Acted upon within 3 hours or less
Acted upon within 4 hours
Acted upon within 5 hours
Acted upon within an average of
6-8 hours
1
10)
11)
EFFICIENCY
No wastage
1-2 wastages
TIMELINESS
within 10 minutes or less
within 11-15 minutes or
3-4 wastages
5-6 wastages
Verified
Verified
less
Verified
less
Verified
less
Verified
EFFICIENCY
No wastage
TIMELINESS
within 4 hours
within 1 day
within 2 days
within 3 days
12)
13)
OTHER INTERVENING FUNCTIONS (DRAWING, ESTIMATE, IMPLEMENTATION/MONITORING OF INFRA PROJECT, WEATHER
INSTRUMENTS INSTALLATION
AND ACT AS SDO)
RATING
5
4
3
2
1
QUALITY
100% of the unscheduled/ emergency repair works are
completed with 100% acceptability and satisfaction
EFFICIENCY
120% acceptability
TIMELINESS
Within 120% of estimated time
schedule
100% acceptability
80% acceptability
70% acceptabilty
60% acceptability
Prepared by:
LOPE H. DACANAY JR.
Planning Offices, ETSD
PANFILA E. GICA
Chief, MGSS
JESSIE B. ARCE
Chief, MEIES
ARNEL R. MANOOS
OIC, METTSS
Recommending Approval
Approved by:
EDWIN F. MANRESA
OIC, ETSD
CATALINO L. DAVIS
Chair, Performance Management Team