You are on page 1of 5

Ruj.

Kami: 2016 (18)


Tarikh:18 Januari 2016
KEPADA SESIAPA YANG BERKENAAN
Y. Bhg. Dato/Tuan/Puan,
PERKARA: JEMPUTAN MENGHADIRI BENGKEL MSMA JPS YANG BERTAJUK SUSTAINABLE
URBAN STORMWATER MANAGEMENT BAGI TAHUN 2016
Dengan segala hormatnya merujuk kepada perkara di atas.
2.
Untuk makluman tuan/puan, pihak Jabatan Pengairan dan Saliran Malaysia (JPS Malaysia) dan
Pertubuhan Saliran Mesra Alam Malaysia (MSO) akan menganjurkan bengkel tersebut dengan kerjasama
pengurus program CP Development. Butiran bengkel adalah seperti yang dilampirkan.
3.
Sekiranya tuan/puan berminat untuk menghadiri bengkel ini, tuan/puan boleh menghubungi Cik
Athirah di talian 016-2273304 atau email kepada kami jps.msmabengkel@gmail.com.
Kerjasama dan kehadiran daripada pihak tuan/puan amatlah dihargai dan didahului dengan ribuan terima
kasih.
Sekian, terima kasih.

Saya yang menjalankan tugas,

___________________________
Low Koon Sing
Pengarah
JPS Bahagian Saliran Mesra Alam (MSMA)

1/5

Organizers:

CoOrganizers:

JPS MSMA Workshops on


Sustainable Urban Stormwater Management (Year 2016)
Fee: RM800 per lesson per pax
Early Bird Promotion: RM700 per lesson per pax
** No GST

Date: As per scheduled


Early bird date: As per scheduled
Time: 8.00 am 6.00 pm
Venue: Jabatan Pengairan dan Saliran Ampang, Kuala Lumpur

With

CPD

Points

Synopsis:
This workshop is organized by JPS (Bhgn Saliran Mesra Alam) & Malaysian Stormwater Organization (MSO) in
order to further promote the application of Urban Stormwater Management Manual for Malaysia @ MSMA
2ndEdition to Engineers. This workshop is also co-organized by Department of Environment (DOE) Malaysia and
REDAC, USM. Participants will be exposed to both the theoretical and practical application of MSMA2 in the real
project.

Workshop Main Speakers:


Lesson 1 :
Prof. Dr. Nor Azazi Zakaria
Founder and Director of REDAC,
AJK MSO & Main Contributor of MSMA2
Lesson 3 :
Ir Azman Abu Bakar
Principal of Perunding Azman, Ooi & Rao Sdn Bhd,
International Member of International Erosion Control
Association (Malaysian Chapter) & AJK MSO
Lesson 5 :
Ir. Leong Kwok Wing
Main Trainer for CPESC and
CESSWI programs & AJK MSO

Lesson 2 :
Ir. Chong Sun Fatt
Co-Founder of G&P Water & Maritime S/B,
AJK MSO & Main Contributor of MSMA2
Lesson 4 :
Ir. Dr. Wong Wai Sam
Director of Mega Consult S/B, AJK MSO &
Main Contributor of MSMA2

2/5

Date schedule:
Lesson

Date

Early Bird Date

7-8 March 2016

26 February 2016

14-15 March 2016

26 February 2016

28-29 March 2016

18 March 2016

4-5 April 2016

18 March 2016

11-12 April 2016

25 March 2016

Program schedule:

JPS KL (7-8 March 2016)


Early bird date: 26 February 2016

JPS KL (14-15 March 2016)


Early bird date: 26 February 2016

Day 1
8.00am

Registration

08.00am Registration

9.00am

08.30am Opening Speech


Earl
08.45am Introduction to On-Site Detention (OSD)

10.15am

Opening Speech
Introduction to Urban Stormwater Management In
Malaysia
Break 1

10.30am

Overview of MSMA 2nd Edition

10.30am OSD Design Procedure

12.00am

MSMA Concept & Design Requirement

01.00pm Lunch

1.00pm

Lunch

2.00pm

Rainfall estimation

3.30pm

Break 2

4.00pm

Intensity-Duration-Frequency Curve Development

5.30pm

Q&A Session

6.00pm

End

9.15am

L
e
s
s
o
n
1

Day 1

Day 2

10.15am Break 1

L
e
s
s
o
n

02.00pm OSD Design - Part 1


03.45pm Break 2
04.00pm OSD Design - Part 2
5.45pm

Q&A Session

06.15pm End
Day 2
08.00am Registration

8.00am

Registration

8.45am

Peak Discharge Estimation

10.15am

Break 1

10.30am

Rational Hydrograph Method

1.00pm

Lunch

2.00am

Time Area Hydrograph Method Part 1

01.00pm Lunch

3.45pm

Break 2

02.00pm RWH Design - Part 1

4.00pm

Time Area Hydrograph Method Part 2

03.45pm Break 2

5.45pm

Q&A Session

04.00pm RWH Design - Part 2

6.00pm

End

05.45pm Q&A Session

08.30am Introduction to Rainwater Harvesting (RWH)


10.15am Break 1
10.30am RWH Design Procedure
11.30am OSD & RWH Submission Requirement

3/5

JPS KL (28-29 March 2016)


Early bird date: 18 March 2016

JPS KL (4-5 April 2016)


Early bird date: 18 March 2016

Day 1

L
e
s
s
o
n

Day 1

08.00am

Registration

08.00am

Registration

08.45am

Opening Speech

08.45am

Opening Speech

09.00am

Introduction of Conveyance

09.00am

Introduction of Detention Pond

10.15am

Break 1

10.15am

Break 1

10.30am

Drainage Submission Requirement

10.30am

Detention Pond Submission Requirement

12.00pm

Swale Design Criteria

12.00pm

Design Consideration

01.30pm

Lunch

01.30pm

Lunch

02.15pm

Structural & Composite Drain

02.15pm

Sizing Flood Detention Site

03.30pm

Break 2

03.30pm

Break 2

03.45pm

Engineered Channel

03.45pm

Erosion Protection

05.45pm

Q&A Session

05.45pm

Q&A Session

06.15pm

End

06.15pm

End

08.00am

Registration

08.00am

Registration

L
e
s
s
o
n

Day 2

3 08.30am Sustainable Green Stormwater System (SGSS)

Day 2

4 08.30am Rational Method - Part 1

10.30am

Break 1

10.30am

Break 1

11.00am

Introduction of Bio-Ecological Drainage System

11.00am

Rational Method - Part 2

01.00pm

Lunch

01.00pm

Lunch

02.00pm

Sub-surface Drainage System

02.00pm

Time-Area Method - Part 1

04.00pm

Break 2

04.00pm

Break 2

04.15pm

Bio-Filter Drain Design for Fields/Lawn

04.15pm

Time-Area Method - Part 2

05.45pm

Q&A Session

05.45pm

Q&A Session

06.15pm

End

06.15pm

End

JPS KL (11-12 April 2016)


Early bird date: 25 March 2016
Day 1
08.00am

Registration

08.45am

10.15am

Opening Speech
Introduction of Erosion and Sediment Control Plan
(ESCP)
Break 1

10.30am

ESCP Submission Requirement Part 1

12.00pm

ESCP Submission Requirement Part 2

01.30pm

Lunch

03.30pm

Break 2

03.45pm

CESSWI & CPSWQ

05.45pm

Q&A Session

06.15pm

End

09.00am

L
e
s
s
o
n

JPS KL (11-12 April 2016)


Certified Professional In Erosion and Sediment
02.15pm Early bird date: 25 March 2016
Control (CPESC)

Day 2

5 08.00am
08.30am

Registration
Preparation of ESCP - Part 1

10.30am

Break 1

11.00am

Preparation of ESCP - Part 2

01.00pm

Lunch

02.00pm

Dry Sediment Basin Design

04.00pm

Break 2

04.15pm

Wet Sediment Basin Design

05.45pm

Q&A Session

06.15pm

End

4/5

CP Development (002301630-X)
13A-C, Jalan Kenari 2, Bandar Puchong Jaya,
47100 Puchong, Selangor, Malaysia.
Tel: 03-58851250 (4 lines) Fax: 03-58851251

Contact Person: Athirah


(016-227 3304)
Bryan Ewe (016-338 4033)
Email: jps.msmabengkel@gmail.com
jpsworkshop@msowater.org

Lesson 1: MSMA2 Overview & Runoff Estimation (Course Code: 109) 7-8 March 2016
Lesson 2: On-Site Detention, Rainwater Harvesting & Submission Requirement (Course Code: 209) 14-15 March 2016
Lesson 3: Drainage Design & Submission Requirement/Sustainable Green Stormwater System (Course Code: 309)
28-29 March 2016
Lesson 4: Detention Pond Design & Submission Requirement (Course Code: 409) 4-5 April 2016
Lesson 5: Erosion Sediment Control Plant Design & Submission Requirement (Course Code: 509) 11-12 April 2016

Registration Form
JPS MSMA Workshops on Sustainable Urban Stormwater Management
I/We would like to participate the above workshop organized by JPS Malaysia and MSO. Enclosed here with
(Cheque No. _____________) in the amount of RM___________ issued in favour of CP Development"
(CIMB: 8601891202). I/We understand that the fee is not refundable if I/we withdraw after application is
accepted by CP Development. However, substitution of participants is allowed. If I/we fail to attend the seminar,
I/we will still settle the registration fee in full. I/We also agree with the Registration Steps below.
Registration Steps:
1. Fill in this form and make payment.
2. Fax / email the form together with receipt of payment.
3. Registration is confirmed once payment cleared.

Reminder:
Please bring your own laptop
for hands-on training.

Company Name: .......................................................................................................................................................


Company Address: ....................................................................................................................................................
...................................................................................................................................................................................
Participant Name:

Contact No.:

Course Code No.:

1).................................................................................

....................................................

.......................

2).................................................................................

....................................................

.......................

3).................................................................................

....................................................

.......................

4).................................................................................

....................................................

.......................

5).................................................................................

....................................................

.......................

6).................................................................................

....................................................

.......................

Contact Person: ......................................................................

Tel/Hp No.: ...................................................

Email Address: .......................................................................


Date: ...................................................

Signature: ..................................................
5/5

You might also like