Sr.
Check List Description
No.
1
Check flow arrow as per P&ID, North direction, key
plan as per Plot plan.
2
Check the Grid & column numbers are in line with
Eqpt layout & Civil drawings. Check the Coordinates
are as per Eqpt layout/Plot plan
3
Make sure proper notes, Legends & holds are added.
Mention Eqpt layout, match line piping GA drgs as
minimum in reference drg.
4
Make sure the 3D draft is made at correct Elevations.
Designer to double check this.
5
Make sure all equipments are properly located with
coordinate
6
Show secondary (major) pipe support with tag as
minimum. Follow Client Go by or requirement on
extends of detailing.
7
The cryogenic pipelines require very large insulation
thickness & hence it is very important to space
these lines as per actual thickness
8
All pipe supports requiring ROCK foundations are
detailed on the drawing.
9
For major pipe supports & pipe racks suspended
from beams and columns, details are indicated on the
drawing. MPS no identified
10
Alignment bellows are added for large size (10"NB
&above) piping connected to machines, in
consultation with piping ''Lead Engineer".
11
Underground /Above ground piping interfaces are
clearly identified in the piping GA along with
Insulating joint with proper SPO item number
12
Piping interfaces with others is properly identified with
coordinates & B/L flanges ( or Valves). Make sure it is
properly conveyed to relevant parties.
13
For Underground piping GA, make sure the valve pits
are added with all detailed & Pit numbers. Make sure
the same properly conveyed to Civil.
14
Monorails are clearly marked with center line. Make
sure no piping is passing under the monorail. Space
below monorails is kept clear for easy removal of
equipment.
15
Identify access way , tube removal, drop out zone,
parking area , turning radius, eqpt un-loading zone,
maintenance space, etc. properly & make sure no
piping is routed in this area.
16
Make sure the all master print comments, Client
comments are taken care while revising the piping
GA drg.
17
Check the Line numbers, Equipment nos, Nozzle
numbers & sizes are shown are as per P&ID.
18
19
Page 1of2
Compliance
Originator Checker
Remarks
Sr.
No.
20
Compliance
Originator Checker
21
22
23
24
25
26
27
28
29
Page 2of2