You are on page 1of 16

BE Form 01

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017

BRIGADA ESKWELA
PHYSICAL FACILITIES AND MAINTENANCE NEEDS ASSESSMENT FORM
Instruction: Conduct an ocular inspection of the school physical listed below. Then provide the needed information to facilitate the
improvement to be done on these identified facilities. (If needed you may use separate forms for each classroom or school facility).

CONDITION
(Check One)
FACILITIES

Roofs/Gutters
Ceilings
Walls
Blackboards
Chairs/desks/tables
Water facilities/
Drainage System
Signages

Satisfacto
ry

Unsatisfact
ory

Remarks
If
Unsatisfactory,
describe the
problem

Nature of
improvement
Needed
(e.g. repair,
repainting,
replacement,
etc)

Material
Resources
Needed (Indicate
kind and quality)

Manpower
Needed(Indicate
quantity and
nature of labor
services needed)

School garden

FACILITIES

CONDITION
(Check One)
Satisfactor Unsatisfactor
y
y

Remarks
If Unsatisfactory,
describe the
problem

Nature of
Improvement
Needed
(e.g. repair,
repainting,
replacement)

Material Resources
Needed (Indicate
kind and quality)

Manpower Needed
(Indicate quantity
and nature of labor
services needed)

Lighting
Windows
Doors
Comfort Rooms
School Grounds
School Canteen/Clinic
School Fence/ wall
Electricity
Alternative gate
Reference Materials
Laboratory equipment

Prepared by:
MARDY SON PUNZALAN
School Physical Facilities Coordinator

Noted:
_________________
Date of Inspection

BENITO C. HERNANDEZ
School Head

BE Form 02

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017

BRIGADA ESKWELA
SCHOOL WORK PLAN
Instruction: List down all the specific activities that you will be undertaking in relation to the conduct of Brigada Eskwela in your school
and fill in the required information. Add another sheet if needed. Once completed, submit a copy to the adopt-A-School Program coordinator or
Brigada Eskwela coordinator of your division on or before _________.
KRA

Activities

Timeline

Persons
Responsible

1.Advocacy and
Marketing
2.Resource
Mobilization
3. Implementation
4. Monitoring and
Evaluation
5. Reporting
Prepared by:
AMIE B. BUCO
__________________________________________

Noted by:
_________________________

Materials
Needed

Budget

Signature over Printed name

Date Prepared

ASP Division Coordinator/ BE coordinator

BE Form 03

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017

BRIGADA ESKWELA
RESOURCE MOBILIZATION FORM
Instruction: Using the completed BE Form 01: Physical Facilities Needs Assessment as basis, summarize the resources (materials and
manpower) needed and list down the potential source or partners to be tapped. Add additional sheet if needed. The Status and Remarks
columns should be updated regularly to determine progress in acquiring resources needed.

Materials Needed

Quantity

Key
Persons/Organization
to
be Tapped

Strategies/Plan
of
Action

Person Responsible

Status

Remarks

Labor
Skills/Volunteers
Needed

Quantity

Key
Persons/Organization
to
be Tapped

Prepared by:
___________________________________________
Resource Mobilization Committee Chairperson

Strategies/Plan
of
Action

Person Responsible

Status

Noted:
BENITO C. HERNANDEZ
Principal IV

Remarks

BE Form 04

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017
BRIGADA ESKWELA
DAILY ATTENDANCE OF VOLUNTEERS
Date: ____________________
Instruction: Volunteers themselves should personally fill in the details required by this form under the supervision of any of the
committee members. For the last column, indicate if masonry, carpentry, plumbing, painting, electrical, gardening/landscaping, ordinary
labours or others.
NAME

POSITION/
DESIGNATION

ADDRESS/
ORGANIZATION/
AFFILIATION

CONTACT
NUMBER

TIME
IN

OU
T

SIGNATUR
E

TOTAL
NUMBERS
OF
HOURS
SERVED

NATURE
OF
VOLUNTEER
SERVICES
RENDERED

Noted:
BENITO C. HERNANDEZ

______________________

Principal IV

Date

BE Form 05

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017

BRIGADA ESKWELA
RECORD OF DONATIONS RECEIVED
ITEMS/ MATERIALS

QUANTITY

DATE
RECIEVED

NAME OF DONOR

ASSUMED COST OF ITEMS


Per Unit
Total

TOTAL

Prepared by:

Noted by:

________________________________________________

BENITO C. HERNANDEZ

Committee on Documentation Chair/Member

Principal IV

BE Form 06

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017

BRIGADA ESKWELA
DAILY ACCOMPLISHMENT REPORT
DAY
6

DATE: _________________

Instruction: List down all the activities that needs to be undertaken for each day of the Brigada Eskwela week. At the end of each day,
please mark the appropriate column that corresponds to the status of each activity. Cite reasons for non-completion.

Activities
Day
Day
Day
Day
Day

1
2
3
4
5

Completed

STATUS
Started but not
yet
completed

REMARKS/RECOMMENDATIONS
Not done

Day 6
Prepared by:

Noted by:

________________________________________________

______________________________________________

Program Implementation Committee Chair/Member

School Head

Date Prepared: ____________


BE Form 7

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017

BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
DIVISION: BATANGAS PROVINCE
REGION: IIV-A CALABARZON
SCHOOL: LUCSUHIN NATIONAL HIGH SCHOOL
SCHOOL ID: 301111
SCHOOL ADDRESS: LUCSUHIN,CALATAGAN,BATANGAS
(Please check appropriate box)

Level:
Elementary
High School

Type of School:
Central School
Non- Central School

(Complete)
Multi-grade
Primary School
(Complete)
Integrated

SCHOOL HEAD:
PTA PRESIDENT:

CONTACT NO.:
CONTACT NO.:

BE Form 07

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017
A. SCOPE OR REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
What was done?
Repaired
1.Roofs
2.Ceilings
3.Wall
4.Windows and Doors
5.Chairs/Desks, Tables and Blackboards
6.Comfort Rooms
7.Leaking Pipes
8.School Grounds/Landscaping
9.School signs
10. Alternative gates/ backdoor gates
11.Electric fans
12.Lightings

Repainted

Replaced

Others
(Brief Description)

BE Form 07

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017
B. DONATIONS/MATERIALS RESOURCES GENERATED (Use separate sheets, if needed)
Type of Donations
Sources

Estimated Cost

TOTAL
BE Form 07

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
School Year 2016-2017

C. VOLUNTEERS SERVICE
Type of Volunteer

Name of individuals/
organization

TOTAL

Number of Volunteers
Day 1

Day 2

Day 3

Day 4

Day 5

Day 6

TOTAL

BE Form 07

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas
S.Y. 2016-2017

D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED


Type of Service
Total Number of Volunteers
Carpentry
Masonry
Gardening/ Landscaping
Painting
Welding
Electrical/ Electronics
Plumbing
Ordinary Labor
TOTAL

Total Number of Hours


Rendered

Total Estimated Costs

BE Form 07
Republic of the Philippines
Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas

E. SIGNIFICANT EVENTS / EXPERIENCES


What happened?

Who were involved?

What is/are important


contribution to the operation
to the school or to existing
needs of the school?

When?

BE Form 07

Republic of the Philippines


Department of Education
Region IV-A CALABARZON
SCHOOLS DIVISION OF BATANGAS PROVINCE
LUCSUHIN NATIONAL HIGH SCHOOL
Lucsuhin,Calatagan,Batangas

F. LESSONS LEARNED

G. SUGGESTIONS TO STRENGTHEN BRIGADA ESKWELA PROJECT

Prepared by:

Date:
_____________________________
BENITO C. HERNANDEZ
Principal IV

You might also like