Professional Documents
Culture Documents
INTRODUCTION
Wastewater flowchart
Greywater
Blackwater
Flushing
Literature study
determine the planning stages and
understand the steps in designing process
Collecting data
Designing phase
Plumbing fixtures
Plumbing fixtures
Piping system
Building Isodiagram
Gardening water
Piping system
Sprinkler water
Septic tank biofilter
Horizontal
pipe
Stand
pipe
Recirculation of
treated greywater*
City sewer
Overflow
CONCLUSION
Building pipe
X2
X 140
Biopore
Catchment
Holes
X2
X2
Gutter
X1
X1
Sewage piping system in Hotel Bintang Tiga City Resort Building was
divided into two wastewater type, blackwater and greywater. Greywater
pipe received effluent from kitchen sink, lavatory, floor drain, and washing
machine while the blackwater received effluent from toilet and urinal.
Mostly, the system utilized gravity system and used PVC based pipe. The
pipe diameter of the blackwater system was ranging from 80-150 mm
while greywater was in the range of 32-110 mm. The pipe slope in the
system was designed between 1/50-1/100. Overall budget estimation
plan of the sewage system in the hotel was calculated at Rp 287,266,064.
REFERENCES
- BSN (2000). SNI-03-6481-2000 Plumbing System (in Indonesia). Jakarta: Badan
Standardisasi Nasional.
- Morimura, T. & Noerbambang, S. M. (2005). Planning and Maintenance of Plumbing
System (in Indonesia). Jakarta: Pradnya Paramita.
- Rosmawati, Erna. (2014). Hotel Bintang Tiga City Resort. Final Project Architecture
Study Program (in Indonesia). Bandung: Institut Teknologi Bandung.
- Republic of Indonesia. (2006). Ministry of Public Works Regulation number
29/PRT/M/2006 about Guidance Technical Requirements of Buildings. Jakarta:
Ministry of Public Works.