Key

Proposed direct buried cable alignment

Haul road

Stone dust

Well compacted thermally suitable


indigenous backfill

Ground Level

900 min

Well compacted thermally


suitable indigenous backfill
Notes

Varies

Warning Tape
1.

All dimensions are in millimetres unless otherwise


stated.

2.

Dimensional information should not be obtained


from this drawing (do not scale).

3.

Dimensions and depths are indicative only and will


vary according to installation and site conditions.

4.

Proposed general arrangement based on WPD


requirements.

5.

Trench arrangement and dimensions to be


confirmed during detail design stages.

6.

Minimum depth to top of cables to be 900mm in


general installation, except in agricultural land
where the minimum is 1000mm.

7.

Construction swathe width may vary according to


site conditions.

Haul Road

Protective Tile
132kV XLPE cables
(cross section may vary)

Service duct

Varies

Detail 1

Cable Circuit 1

Cable Circuit 2

3mm stone dust

(See Note 5)
1:10

Typical Plan View of Direct Buried Cables

7m - Temporary Access Road

1:200
Ground Level

Cable Circuit 1

Cable Circuit 2

See Detail 1
Varies

Varies

Varies

Section A-A
Typical Duct Cross Section

900 min

1:50

Ground Level

Well compacted thermally suitable indigenous backfill


MMD DRAWING No.

MMD-322069-E-DR-WPD-XX-0600

132kV XLPE cable

Section B-B
Typical Section View of Direct Buried Cables
(Service ducts omitted for clarity)
1:50

May 2014

For DCO Submission

JAH

LD

JB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

TITLE:

Temp.
drain

Subsoil
Stockpile

7m Haul Road

Cable Circuit 2

Topsoil Stockpile

Cable Circuit 1

Construction Swathe Typically 60m (See Note 7)

Varies

Subsoil
Stockpile

Topsoil Stockpile

Temp.
drain

0.5m

1m

2.5m

5m

5m

10m

1:10

1:50

Typical Section Haul Road Swathe


1:100

1:100
10m

20m

CAD
A1

NG DRAWING No.

0
1:200

NG INVESTMENT No.

SCALE

As Shown
ISSUE

Key

Proposed direct buried cable alignment


Proposed ducted cable alignment
Haul road
Existing road
Existing hedgerow
Existing hedgerow to be temporarily
removed If required
Reinforced Concrete or stone dust
Stone dust
Well compacted thermally suitable
indigenous backfill
Pavement reinstatement

Haul Road

Haul Road

Sub-base

Notes

Hedgerow to be temporarily removed

Existing Hedgerow

Existing Road

Existing Road

Existing Road

7m haul road

Cable Circuit 2

Varies

Dimensional information should not be obtained


from this drawing (do not scale).

3.

Dimensions and depths are indicative only and will


vary according to installation and site conditions.

4.

Proposed general arrangement based on WPD


requirements.

5.

Trench arrangement and dimensions to be


confirmed during detail design stages.

6.

Bentonite may be required within ducts to


potentially improve cable rating, subject to
agreement with relevant stakeholders.

Varies

Varies

Section A-A
Typical Duct Cross Section

Haul Road

2.

See Detail 1

Hedgerow to be temporarily removed

Cable Circuit 1

All dimensions are in millimetres unless otherwise


stated.

Cable Circuit 2

Cable Circuit 1

Existing Hedgerow

1.

(1:50)

Typical Plan View of Open Cut Road Crossing


1:200

Pavement reinstatement
Existing Road Level

Sub-base
Well compacted thermally
suitable indigenous backfill

900
min

900 min

Ground Level

uPVC duct
(Outer diameter may vary)
132kV XLPE cables
(cross section may vary)
3mm stone dust
or concrete

132kV XLPE cable

MMD DRAWING No.

900
min

Service duct

900
min

Varies

Protective Tile

900
min.

Existing Road

Warning Tape

MMD-322069-E-DR-WPD-XX-0601
132kV XLPE cable in duct

3mm stone dust trench section

132kV XLPE cable

3mm stone dust trench section

3mm stone dust or concrete trench section

Section B-B
Typical Section View of Open Cut Road Crossing

May 2014

For DCO Submission

JAH

LD

JB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

TITLE:

(Service duct omitted for clarity)


1:50
Varies

Detail 1
(See Note 5)
1:10

0.5m

1m

2.5m

5m

1:10

1:50
10m

20m

APPLICATION No.

CAD
A1

NG DRAWING No.

0
1:200

NG INVESTMENT No.

SCALE

As Shown
ISSUE

Key
Proposed direct buried cable alignment

Proposed ducted cable alignment

Haul road

Water

Reinforced Concrete

Stone dust

Well compacted thermally suitable


indigenous backfill

Notes

1.

All dimensions are in millimetres unless otherwise


stated.

2.

Dimensional information should not be obtained from


this drawing (do not scale).

3.

Dimensions are indicative only and will vary


according to installation and site conditions.

4.

Ditch crossing method to be defined depending on


specific characteristics and installation conditions.
Trench arrangements and dimensions to be
confirmed during detail design stage.

5.

Ditch crossing construction operation will not impinge


water flow.

6.

Proposed general arrangement based on WPD


requirements. Arrangement and dimensions to be
confirmed during detail design stages.

7.

At certain locations ducts may be filled with


bentonite.

8.

Depth to be agreed with the relevant stakeholders.

Cable Circuit 1

1000

Culvert

Haul Road

Varies

1000

Haul Road
Ground Level

A
Cable Circuit 2

B
Varies

Existing ditch
(See Note 8)

132kV XLPE cable

132kV XLPE cable

132kV XLPE cable in duct


3mm Stone dust trench section

Reinforced concrete surround trench section

3mm Stone dust trench section

Section A-A
Typical Section View of Ditch Crossing (Cable)

Typical Plan View of Ditch Crossing


1:200

(Service ducts and reinforcement omitted for clarity)


1:50

Varies

Ground Level

7m Haul Road

900 Minimum

Top of Ditch

Bottom of Ditch
MMD DRAWING No.

MMD-322069-E-DR-WPD-XX-0602

Culvert

Varies
(See note 8)

Well compacted thermally


suitable indigenous backfill

Varies

Varies

Varies

See Detail 1

Warning Tape
Cable Circuit 1
Protective Tile
Reinforcement

Cable Circuit 2

Section B-B
Typical Duct Cross Section

May 2014

For DCO Submission

JAH

LD

JB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

TITLE:

(Reinforcement omitted for clarity)


1:50
Service duct
uPVC ducts (Outer
diameter may vary)
132kV XLPE cables
(cross section may vary)

PINS SHEET 22 OF 70
Reinforced concrete
surround

Varies

0.5m

1m

2.5m

5m

1:10

Detail 1
(see Note 4)
1:10

1:50
10m

20m

APPLICATION No.

CAD
A1

NG DRAWING No.

0
1:200

NG INVESTMENT No.

SCALE

As Shown
ISSUE

Key
Proposed direct buried cable alignment

Proposed direct buried or ducted


cable alignment
Haul road
7m Haul Road
Reinforced Concrete or stone dust
Ground Level
Stone Dust

Cable Circuit 1

Cable Circuit 2
Varies

Varies

Varies

Varies

Well compacted thermally suitable


indigenous backfill

See Detail 1
Sheet 20 of 70

Existing Utility

UTL

Notes

Cable Circuit 1

Cable Crcuit 2

Utility

Section A-A
Typical Utility Crossings - Above Existing Services

1.

All dimensions are in millimetres unless otherwise


stated.

2.

Dimensional information should not be obtained


from this drawing (do not scale).

3.

Dimensions and depths are indicative only and will


vary according to installation and site conditions.

4.

Proposed general arrangement based on WPD


requirements.

5.

Trench arrangement and dimensions to be


confirmed during detail design stages.

6.

Minimum depth to top of cable to be 900mm in


general installation, except in agricultural land
where the minimum is 1000mm.

7.

Where possible, cable crossing at existing


services should be perpendicular.

8.

Spacing between utility and cable is subject to


agreement with the relevant provider/asset owner
at individual locations.

(1:50)

UTL

UTL

UTL

UTL

UTL

UTL

UTL

UTL

900
min

900
min

Ground Level

Utility

Varies

132 kV XLPE cable

B
Typical Plan View of Utility Crossing
1:200

Section B-B
Typical Utility Crossings - Above Existing Services
(Service ducts omitted for clarity)
1:50

7m Haul Road

Varies

Ground Level

Varies

Utility
Varies

Varies

Varies

Varies
Cable Circuit 2

Cable Circuit 1

MMD DRAWING No.

Section A-A
Typical Utility Crossings - Below Existing Services

MMD-322069-E-DR-WPD-XX-0603

1:50

900
min

Ground Level

Cable section to be direct buried


or ducted, subject to utility depth,
construction methodology and
agreement with utility provider .

Utility

May 2014

For DCO Submission

JAH

LD

JB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

TITLE:

Varies

UTL

900
min

UTL

Haul Road

UTL

PINS SHEET 23 OF 70

132 kV XLPE cable


3mm stone dust trench section

Stone dust or reinforced concrete trench section

Section B-B
Typical Utility Crossings - Below Existing Services
(Service ducts omitted for clarity)
1:50

3mm stone dust trench section

NG INVESTMENT No.

APPLICATION No.

CAD
A1

2.5m

5m

1:50

As Shown
0

1:200

NG DRAWING No.

SCALE

10m

20m

ISSUE

Key

Proposed direct buried cable alignment


Proposed ducted cable alignment
Reinforced concrete
Ground Level

Stone dust

Clean sand
Well compacted thermally
suitable indigenous backfill or
similar approved by pipeline
operator.

Haul Road

1000 min.

Haul Road

Well compacted thermally suitable


indigenous backfill

Removable concrete slab


(Marker slabs 150mm
min. thickness)

1.

All dimensions are in millimetres unless otherwise


stated.

2.

Dimensional information should not be obtained


from this drawing (do not scale).

3.

Dimensions and depths are indicative only and will


vary according to installation and site conditions.

4.

General arrangement based on WPD standard


CA6A/3 and GPSS Standard relating to the
installation of underground cables.

5.

Trench arrangement and dimensions to be


confirmed during detail design stages.

6.

Bentonite may be required within ducts to


potentially improve cable rating, subject to
agreement with relevant stakeholders.

7.

The cable sizes to be confirmed at a later stage.

8.

GPSS pipe dimensions are assumed only.

Clean Sand

GPSS pipes 400mm dia.


(See note 8)

300

Cable Circuit 2

Haul Road

Cable Circuit 1

300

GPSS

Notes

Clean Sand

Warning tapes

Removable concrete slab


(Marker slabs 150mm
min. thickness)
300

Typical Plan View of GPSS Crossing

Protective tile

1:200

Service duct

Well compacted
thermally suitable
indigenous backfill

uPVC duct
(Outer diameter may vary)
132kV XLPE cable
(Overall cable diameter &
cross section may vary)

7m Haul Road

Cable Circuit 1

3mm stone dust or


concrete

Cable Circuit 2

GPSS
Varies

See Detail 1
Approx. 10000 - 12000

Detail 1
(See Note 5)
1:10

Section A - A
Typical Duct Cross Section
1:50

Ground Level

MMD DRAWING No.

2000

Protection tile

MMD-322069-E-DR-WPD-XX-0606

1000 min.
2000 min.

Removable concrete slab

GPSS

250 min.

250 min.

May 2014

For DCO Submission

JAH

LD

JB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

TITLE:

Removable concrete slab

max.

132kV XLPE Cable

0.5m

1m

1m

2m

2.5m

5m

10m

20m

1:10
132kV XLPE cable in duct

4000

NG INVESTMENT No.

1:20

Section B - B
Typical Section View of GPSS Crossing
(Service ducts omitted for clarity)
1:20

CAD
A1

1:50
1:200

APPLICATION No.

NG DRAWING No.

SCALE

As shown
ISSUE

Key
Proposed direct buried cable alignment

Haul road

Concrete

Stone dust

Well compacted thermally suitable


indigenous backfill

Access gate

Ground Level

Service duct
chamber

75

Protective tile

Warning
Tape

Notes

900mm min

Bonding cables

Link box pit

Service Duct

1.

All dimensions are in millimetres unless otherwise


stated.

2.

Do not scale any items of information from this


drawing.

3.

Existing ground profiles shown are for general


indication only.

4.

Arrangement shown for indicative purpose only.


Dimensions and design may vary depending on
site and installation conditions.

5.

Link boxes to be installed below ground. Length of


the bonding leads which connects to the link boxes
must not exceed 8m as per WPD standard
CA6A/3.

6.

Joint separation to be determined dependant on


onsite conditions.

Joint bay

Joint bay
base slab
1750

Sump

ies

C
ble
a
C

1750

Sump

Var

it
ircu

750

2000

7000

Typical Section View of Joint Bay

Joint bay

oad

R
aul

2000

1:50

Bonding cables

Typical cable trench profile view


Link box pit

Service Duct

Ground Level

Service duct
chamber

Well compacted thermally


suitable indigenous backfill

t2

cui

b
Ca

Typical Plan View of Joint Bay

900 min.

See Detail 1
Varies

ir
le C

Warning Tape

1:100
Protective tile
3mm stone
dust
Service duct

Section A - A
Typical Joint Bay Cross Section
1:25
MMD DRAWING No.

MMD-322069-E-DR-WPD-XX-0700

Joint bay

Bonding cables

May 2014

For DCO Submission

JAH

LD

JB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

TITLE:

132kV UNDERGROUND
CABLE INSTALLATION
TYPICAL GENERAL ARRANGEMENT OF
JOINT BAY WITH LINK BOX PIT

Link box pit


Service Duct

Service duct chamber

Detail 1
Typical Plan View of Joint Bay Connections

1.250m

2.5m

2.5m

1:25

1:50

5m

1:50

NG INVESTMENT No.

APPLICATION No.

CAD
A1
SCALE

As Shown
0
1:100

5m

10m

ISSUE

Key
Proposed direct buried cable alignment

Haul road

Notes
1. Do not scale any items of information from this
drawing.
2. Hardstanding shall be capable of supporting
equipment/mobile plant.
3. Arrangement shown for indicative purposes only,
dimensions and design may vary depending on site
and installation conditions.
4. Indicative location of trailer mounted cable drum.
Link box pit

Service duct chamber

1
oad

Cab

lR
Hau

See Note 4

Link box pit

Service duct chamber


ircu

eC
abl

it 2

Typical Cable Pulling Layout


1:200

20m Temporary Hardstanding

MMD-322069-E-DR-WPD-XX-0701

Tractor

Direction of cable release

Temporary
Hardstanding

Drum

MMD DRAWING No.

7m

uit

irc
le C

May 2014

For DCO Submission

JAH

LD

JB

ISSUE

DATE

COMMENTS

DRAWN

CHK'D

APP'D

TITLE:

Trailer
Cable guide

Cable Pulling Arrangement


NTS

DESCRIPTION
TRACTOR
TRAILER
TRAILER WITH CABLE DRUM AND CABLE
CABLE GUIDE

SIZE
5.2m LONG x 2.54m WIDE x 3m HIGH
5.9m LONG x 4.4m WIDE x 2.5m HIGH
5.9m LONG x 4.4m WIDE x 5m (APPROX) HIGH
5m LONG x 3m WIDE x 3m (APPROX) HIGH

WEIGHT
8 TONNES
5 TONNES
40 TONNES
2.5 TONNES

15m TURNING CIRCLE FOR TRACTOR

NG INVESTMENT No.

DRUM / TRAILER DETAILS

APPLICATION No.

CAD
A1

NG DRAWING No.

0
1:200

10m

20m

SCALE

As Shown
ISSUE