You are on page 1of 7

Peru Engineering

Method of Procedure (MOP)


Date

25/08/2015

Ver.

Page

Last
Update

TSS E INSTALACION DE SOPORTE MW 1.20 M


0101204_TA_LOS_PALOS

[JEAN PIERRIE MEJIA ]


Designed by
COMFUTURA

Confidential

[CARLA ALVAREZ]
Approved by
O&M

Peru Engineering
Method of Procedure (MOP)
Date

25/08/2015

Page

Last
Update

Ver.

General Information
Proposed Date:

[20/05/2016~ 31/05/2016]

Proposed Time:

[Peru GMT-5 (09:00 hrs ~ 19:00 hrs)]

Activity Description:

Technical Site Survey

Activity Purpose:

Instalacin de soporte MW 1.20 M.

Network Type

iDEN

Network Domains
Involved:

RAN (Radio Access Network)


CS Core

Involved NEs:
Involved Services:

Involved Markets and


Providers:
Nextel NOC
Monitoring

3G

DATACOM

LTE

WiMax

Other: MW

Transport/Transmission
ISP

VAS

Sites

PS Core
Other:______________

NINGUNA EN PRODUCCION
TACNA

COMUNICACION FUTURA SAC

Sites & TX
VAS

Confidential

2G

Voice
Datacomm

Dispatch / ISP / HPPTT / CWAN

Peru Engineering
Method of Procedure (MOP)
Date

25/08/2015

Page

Last
Update

Ver.

RPN (Risk Priority


Number)
Location for
execution:

TACNA

Bridge (if needed):

NO SE REQUIERE
Onsite Support Required:

Facilities:

Yes

No:

Remote Support Required: Yes:

No:

Partners Support Required: Yes:

No:

Network Impact:

Yes:

Impact Duration:

No existir afectacin de servicios.

Notification to
OSIPTEL:

Yes:

No:

Date: []

Notification to
Providers:

Yes:

No:

Date: []

Impacted NEs:
Impacted Services:

N/A

Impacted Markets
and Providers:

N/A

Confidential

No:

Places (if yes): []

Contact Info: []

Peru Engineering
Method of Procedure (MOP)
Date

25/08/2015

Page

Last
Update

Ver.

Ticket or Case
reference (if any):
Comments and
remarks:

MOP Scope and


Detailed
Description

N/A

Instalacin de soporte MW 1.20 m.


Sitio
La_Yarada

Fecha Plan

Fecha Backup

20/May

31/May

Pre-conditions
in the Network

Que no existan cortes de energa ni cadas de servicio.

General
Expected
Results

Instalacion de soporte MW 1.20 m

Pre Works

Confidential

Attach test matrix and necessary checklist:


1. Arribar al sitio.

Peru Engineering
Method of Procedure (MOP)
Date

Attach Hour by Hour Activity:


Owner
Step

Date

Description
Inspeccin de instalacin

1
Abrir evento con TIER 1 Entel.
2

Cooperad
or

TSS e Instalacin de Soporte

Cooperad
or

Tomas fotogrficas

Cooperad
or

Cierre de evento con TIER 1

Cooperad
or

Command
Configuration

20/05/201
6/
20/05/201
6
20/05/201
6/
20/05/201
6
20/05/201
6/
20/05/201
6
20/05/201
6/
20/05/201
6

Attach the scripts and commands sequence:


1. [Item1]
2. [Item2]

Validation

Attach test matrix and necessary validations:


1. [Item1]
2. [Item2]

Confidential

Last
Update

Ver.

MOP Activities
Description

Page

25/08/2015

Referenc
e Start
Time
-

Reference
End Time

09:00 AM

09:10 AM

09:10 AM

12:00 AM

12:00 PM

1:00 PM

5:00 PM

5:30 PM

Peru Engineering
Method of Procedure (MOP)
Date

25/08/2015

Ver.

Page

Last
Update

Attach the GO / NO GO Criteria and escalation levels:


Go / No Go
Criteria

1. [Item1]
2. [Item2]

Attach the scripts and commands sequence:


Roll Back
Procedure

1. [Item1]
2. [Item2]

Roles &
The roles and responsibilities should be detailed below and some
Responsibilities additional information can be gathered including providers:
Contact name

Contact Number
/ UFMI

Area / Responsability

Jean Pierrie Mejia

972800893

CONTRATISTA

955243622

Coordinador de
Construccin de
Infraestructura Mvil

Carla Alvarez

Confidential

E-mail
supervision@comfutura.com
carla.alvarez@entel.pe

Peru Engineering
Method of Procedure (MOP)
Date

25/08/2015

Page

Last
Update

Ver.

Additional
Information:
Detallo personal a ingresar en los sitios de mencionados.
Apellidos y Nombres

Confidential

Documento de
Identidad

LAURA TOVAR, SAUL

10697026

AYALA MOSQUERA, PEDRO

16134267

TAIPE LLANOS, VICTOR MANUEL

41268930

SOLORZANO PAUCAR, EDUARDO

08634197

MEJIA VAN DYCK, JEAN

972800893